AI-assisted research summary: These regulations set a voltage range, require the corporation to make annual payments, and govern how poles or structures must be relocated when a municipality’s work makes relocation necessary.
1 POWER CORPORATION P-19 REG 1 The Power Corporation Regulations being Chapter P-19 Reg 1 (effective June 15, 2005) as amended by Saskatchewan Regulations 5/2018 and 54/2018. NOTE: This consolidation is not official. Amendments have been incorporated for convenience of reference and the original statutes and regulations should be consulted for all purposes of interpretation and application of the law. In order to preserve the integrity of the original statutes and regulations, errors that may have appeared are reproduced in this consolidation. 2 P-19. REG 1 POWER CORPORATION Table of Contents 1 Title 2.4 Repealed 2 Range of nominal design voltages 2.5 Moving poles or structures at the request of a municipality 2.1 Annual payments 3 Coming into force 2.2 Repealed 2.3 Repealed Appendix Repealed 3 POWER CORPORATION P-19 REG 1 CHAPTER P-19 REG 1 The Power Corporation Act Title 1 These regulations may be cited as The Power Corporation Regulations. Range of nominal design voltages 2 The range of nominal design voltages within which a distribution of electrical energy constitutes a “distribution” within the meaning of clause 1.1(c.1) of The Power Corporation Act is from 0 kilovolts up to, but not including, 72 kilovolts. 10 Jne 2005 cP-19 Reg 1 s2. Annual payments 2.1(1) In this section: “Act” means The Power Corporation Act; “corporation’s gross revenues” means the corporation’s gross revenues from all accounts of customers in Saskatchewan for the supply of energy, not including exports. (2) For the purposes of section 44.1 of the Act, the corporation shall, in each financial year, pay an amount equal to 1.0% of the corporation’s gross revenues to the Minister of Finance for deposit into the General Revenue Fund. (3) The payment mentioned in subsection (2) must be paid at the time and in the manner agreed to by the Minister of Finance and the corporation. 24 Aug 2018 SR 54/2018 s3. 2.2 Repealed. 24 Aug 2018 SR 54/2018 s3. 2.3 Repealed. 24 Aug 2018 SR 54/2018 s3. 2.4 Repealed. 24 Aug 2018 SR 54/2018 s3. Moving poles or structures at the request of a municipality 2.5(1) In this section, “poles or structures” means poles, structures, wires, conduits, pipes or other parts of the corporation’s electrical system. (2) If a municipality proposes to pave, widen or otherwise alter any highway, road, street, lane or other public place on or under which the corporation has placed its poles or structures with the result that it is necessary that the corporation relocate those poles or structures, the municipality shall request in writing that the corporation relocate the poles or structures. 4 P-19. REG 1 POWER CORPORATION (3) If a municipality requests that poles or structures be relocated pursuant to subsection (2), the corporation may notify the municipality of the corporation’s costs in writing and may require the municipality to reimburse the corporation for all or part of the corporation’s costs incurred in connection with the relocation, as a condition of undertaking the relocation. (4) Within a reasonable time after receiving a request from a municipality pursuant to subsection (2), the corporation shall relocate the poles or structures. 2 Feb 2018 SR 5/2018 s3. Coming into force 3(1) Subject to subsection (2), these regulations come into force on the day on which section 8 of The Power Corporation Amendment Act, 2004 comes into force. (2) If section 8 of The Power Corporation Amendment Act, 2004 comes into force before these regulations are filed with the Registrar of Regulations, these regulations come into force on the day on which they are filed with the Registrar of Regulations. 10 Jne 2005 cP-19 Reg 1 s3. Appendix TABLE 1 [Sections 2.1 and 2.2] Repealed. 24 Aug 2018 SR 54/2018 s4. TABLE 2 [Section 2.4] Repealed. 24 Aug 2018 SR 54/2018 s4.