Oil and Gas Drilling and Production Regulations
This section defines key terms used in the Oil and Gas Drilling and Production Regulations.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Canada — Yukon
- Instrument
- Regulation
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Citation provenance: source:global:stored-legal-sources · schema StatuteEnrichmentPublicV1.
Statute overview
About this statute
This section defines key terms used in the Oil and Gas Drilling and Production Regulations. This part defines key oil and gas terms and sets licensing rules for drilling and certain well operations. This part sets operating rules for well and field-facility licensees, including approvals, notices, survey filings, timing limits, and compliance with directions from the Chief Operations Officer. This part sets drilling and blowout-control requirements for wells, including drilling-fluid capacity, equipment, testing, and rules for moving a drilling rig. The licensee must follow detailed drilling, casing, cementing, testing, monitoring, and electrical safety requirements for wells.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of Oil and Gas Drilling and Production Regulations
Showing 14 of 14
Part document.segment-1
Oil and Gas Drilling and Production Regulations — segment 1
- document.segment-1 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 1
AI-assisted research summary: This section defines key terms used in the Oil and Gas Drilling and Production Regulations.
OIL AND GAS ACT LOI SUR LE PÉTROLE ET LE GAZ RÈGLEMENT SUR LES TRAVAUX DE OIL AND GAS DRILLING AND FORAGE ET DE PRODUCTION DE PRODUCTION REGULATIONS PÉTROLE ET DE GAZ O.I.C. 2004/158 DÉCRET 2004/158 Effective Date: Date d'entrée en vigueur : July 27, 2004 27 juillet 2004 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz ORDER-IN-COUNCIL DÉCRET EN CONSEIL O.I.C. 2004/158 DÉCRET 2004/158 OIL AND GAS ACT LOI SUR LE PÉTROLE ET LE GAZ RÈGLEMENT SUR LES TRAVAUX DE OIL AND GAS DRILLING AND FORAGE ET DE PRODUCTION DE PRODUCTION REGULATIONS PÉTROLE ET DE GAZ Pursuant to sections 10 and 65 of the Oil and Gas Act, Le commissaire en conseil exécutif, conformément aux the Commissioner in Executive Council orders as articles 10 et 65 de la Loi sur le pétrole et le gaz, follows décrète : 1. The attached Oil and Gas Drilling and Production 1. Est établi le Règlement sur les travaux de forage Regulations are hereby made. et de production de pétrole et de gaz paraissant en annexe. Dated at Whitehorse, Yukon, this July 27th 2004. Fait à Whitehorse, au Yukon, le 27 juillet 2004. Commissioner of Yukon/Commissaire du Yukon Page ii YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES BSTHIELCILOR T NNT A Y BODL -. SF E3OE O3SU F SR IC TOO HNN L TOE EFG N ITT SHS LEA ( T T I A V B E L A E S D S E E S M M B A LY TI ÈRES) PDTRREUEONXJEITTÈEM -DQEEU SLAEOTSIRS NIIÈOºM3NE3 D AES LSAEM BLÉE LÉGISLATIVE RÈGLEMENT SUR LES TRAVAUX DE OIL AND GAS DRILLING AND FORAGE ET DE PRODUCTION DE PRODUCTION REGULATIONS PÉTROLE ET DE GAZ TABLE OF CONTENTS TABLE DES MATIÈRES Section Page Article Page 1. Interpretation ......................................................... 1 1. Définitions ............................................................... 1 2. References to codes .............................................. 10 2. Renvoi ............................................................................. 10 3. Computation of days and months .......................... 11 3. Calcul des dates ..................................................... 11 4. Availability of Regulations ..................................... 12 4. Disponibilité des règlements .................................. 12 PART 1 PARTIE 1 LICENCES AND APPROVALS LICENCES ET AUTORISATIONS 5. Drilling operations and well operations .................. 12 5. Travaux de forage et exploitation de puits ............. 12 6. Application and issuance ....................................... 12 6. Demande et délivrance .......................................... 12 7. Separate well operations ....................................... 13 7. Travaux distincts dans un puits.............................. 13 8. Well deposit........................................................... 13 8. Dépôt exigible pour un puits .................................. 13 9. Conditions of Well Licence or Approval................... 15 9. Conditions d’une licence de puits ou d’une 10. Amendments ......................................................... 16 autorisation ........................................................... 15 11. Suspension or termination of operation ................. 17 10. Modifications ......................................................... 16 12. Timing of application............................................. 18 11. Abandon provisoire ou cessation des travaux ......... 17 12. Délais .................................................................... 18 PART 2 PARTIE 2 WELLS PUITS 13. Notices respecting operations ................................ 19 14. Well, pool and field identification ........................... 20 13. Avis de travaux ...................................................... 19 15. Unique well identifiers ........................................... 21 14. Désignation des puits, des gisements et des 16. Well classifications ................................................ 21 champs .................................................................. 20 17. Surveys for wells ................................................... 22 15. Identificateurs uniques de puits ............................. 21 18. Spacing, target areas and off-target penalties 16. Classification des puits ........................................... 21 for oil wells ........................................................... 22 17. Arpentage .............................................................. 22 19. Spacing, target areas and off-target penalties 18. Unités d’espacement, zones cibles et pénalités for gas wells .......................................................... 23 pour puits de pétrole hors zone ............................. 22 20. Multi-zone spacing ................................................ 24 19. Unités d’espacement, zones cibles et pénalités 21. Special spacing areas ............................................ 24 pour puits de gaz hors zone ................................... 23 20. Espacement des puits traversant plusieurs c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page iii September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES couches productives ...............................................24 PART 3 21. Espacement spécial ................................................24 FIELD FACILITIES PARTIE 3 22. Field facilities designation ...................................... 25 INSTALLATIONS DE CHAMP 23. Field facility names ................................................ 26 24. Plan of survey of site ............................................. 27 22. Désignation des installations de champ ..................25 25. Abandonment of field facility ................................. 27 23. Noms des installations de champ ...........................26 24. Plan d’arpentage ....................................................27 PART 4 25. Abandon d’une installation de champ .....................27 DRILLING OPERATIONS, EQUIPMENT AND PARTIE 4 PROCEDURES TRAVAUX, MATÉRIEL ET PROCÉDÉS DE FORAGE 26. Assumed maximum formation pressure ................ 28 27. Variation of Part 4 requirements............................ 28 26. Pression maximale de formation présumée ............28 28. Drilling near surface improvements ....................... 28 27. Modification des exigences .....................................28 29. Standards for drilling rigs ...................................... 29 28. Aménagements en surface .....................................28 30. Drilling rig removal requirements .......................... 29 29. Normes relatives aux appareils de forage ...............29 31. Drilling fluid system ............................................... 29 30. Exigences quant au déplacement d’un appareil 32. Approved drilling fluid ........................................... 31 de forage ...............................................................29 33. Well classification during drilling operations .......... 32 31. Système de fluides de forage .................................29 34. Well control equipment generally ........................... 33 32. Fluides de forage approuvés ...................................31 35. Blowout prevention systems generally ................... 34 33. Classification des puits durant le forage .................32 36. Blowout prevention requirements for drilling ......... 35 34. Matériel de contrôle d’un puits ...............................33 37. Control system ...................................................... 36 35. Systèmes d’obturateurs anti-éruption ....................34 38. Accumulator and recharging system ...................... 36 36. Exigences de prévention des éruptions lors du forage ....................................................................35 39. Working spools ...................................................... 37 37. Dispositif de commande .........................................36 40. Kill lines and pressure relief lines ........................... 38 38. Accumulateur et dispositif de recharge ..................36 41. Choke manifold ...................................................... 39 39. Brides d’encrage ....................................................37 42. Safety valves and stabbing valves .......................... 40 40. Conduites de neutralisation et conduites de 43. Flare lines and flare tanks ...................................... 40 détente de pression ................................................38 44. Equipment for sour wells ....................................... 41 41. Manifold d’engorgement .........................................39 45. Blowout preventers when running casing .............. 42 42. Vannes de sécurité et vannes d’intervention 46. Blowout prevention tests generally ........................ 42 d’urgence ...............................................................40 47. Pressure tests of blowout prevention 43. Conduites de torche ...............................................40 equipment ............................................................. 43 44. Matériel pour puits corrosifs ..................................41 48. Function tests of equipment .................................. 44 45. Obturateurs anti-éruption requis à la pose de 49. Blowout prevention drills ....................................... 45 tubage ...................................................................42 50. Casing design generally ......................................... 45 46. Essais des obturateurs ...........................................42 51. Casing design and burst pressures ........................ 47 47. Épreuves de pression sur le matériel 52. Casing design and collapse loading ........................ 47 d’obturation ...........................................................43 53. Casing design and tensile loading .......................... 47 48. Vérification du fonctionnement du matériel ............44 54. Casing liners .......................................................... 48 49. Exercices de prévention d’éruption .........................45 55. Casing program requirements ............................... 48 50. Conception du tubage.............................................45 56. Protection of permafrost ........................................ 49 51. Conception du tubage et résistance à 57. Cementation as well control ................................... 49 l’éclatement ...........................................................47 58. Cement volume...................................................... 50 52. Conception du tubage et résistance à 59. Cementing of casing strings .................................. 50 l’écrasement ..........................................................47 60. Waiting on cement time ........................................ 51 53. Conception du tubage et résistance à la 61. Pressure tests of casing ......................................... 51 traction ..................................................................47 62. Formation flow testing equipment ......................... 52 54. Tubages partiels .....................................................48 63. Formation leak-off test .......................................... 53 55. Exigences du programme de tubage ......................48 64. Monitoring of drilling ............................................. 53 56. Protection contre le pergélisol ................................49 Page iv YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES 65. Directional and deviation surveys .......................... 55 57. Cimentation du tubage comme contrôle du puits ...................................................................... 49 PART 5 58. Volume du ciment .................................................. 50 ELECTRICAL EQUIPMENT 59. Cimentation des colonnes de tubage ...................... 50 60. Prise du ciment ...................................................... 51 66. Definitions for Part 5 ............................................. 55 61. Essais sous pression du tubage .............................. 51 67. Electrical installations for drilling and well 62. Matériel pour essais d’écoulement de operations ............................................................. 56 formation .............................................................. 52 68. Grounding and bonding ......................................... 57 63. Essai de pression de fuite ...................................... 53 69. Power lines ........................................................... 57 64. Contrôle du forage ................................................. 53 70. Warning signs ....................................................... 58 65. Etudes de déviation et de direction ........................ 55 71. Well site cabins and trailers ................................... 58 PARTIE 5 PART 6 MATÉRIEL ÉLECTRIQUE WELL OPERATIONS, EQUIPMENT AND 66. Définitions ............................................................. 55 PROCEDURES 67. Installations électriques pour travaux de forage 72. Variation of Part 6 requirements ........................... 59 ou exploitation d’un puits....................................... 56 73. Well completion and servicing ............................... 59 68. Mise à la terre et mise à la masse .......................... 57 74. Well classification during well operations............... 60 69. Lignes d’alimentation électrique ............................. 57 75. Well control equipment generally .......................... 60 70. Panonceaux d’avertissement .................................. 58 76. Blowout prevention requirements for well 71. Baraquement de chantier....................................... 58 operations ............................................................. 61 77. Control system ...................................................... 62 PARTIE 6 78. Accumulator and recharging system ..................... 63 ÉQUIPEMENT DE PUITS 79. Kill lines and pressure relief lines .......................... 64 80. Choke manifold ..................................................... 65 72. Variations dans les exigences de la partie 6 ........... 59 81. Stabbing valves ..................................................... 65 73. Achèvement et entretien de puits ........................... 59 82. Tests, maintenance and drills ................................ 66 74. Classification des puits lors de l’exploitation ........... 60 83. Annulus between well tubulars .............................. 67 75. Exigences générales relatives au contrôle des 84. Subsurface safety valve ......................................... 68 puits ...................................................................... 60 85. Wellhead and christmas tree ................................. 69 76. Exigences du bloc d’obturation pour l’exploitation d’un puits .......................................... 61 86. Surface casing vents and flows .............................. 70 77. Dispositif de commande ......................................... 62 87. Testing requirements for valves and sensors ......... 72 78. Accumulateur et dispositif de recharge .................. 63 88. Inspections and tests of equipment ....................... 73 79. Conduites de neutralisation et conduites de PART 7 détente de pression ............................................... 64 80. Manifold d’engorgement ........................................ 65 WELL SUSPENSION AND ABANDONMENT 81. Vannes d’intervention d’urgence ............................ 65 89. Well suspension or abandonment requirement ...... 73 82. Épreuves sous pression, entretien et 90. Approval to suspend or abandon a well ................. 74 entraînement ......................................................... 66 91. Suspended wells .................................................... 74 83. Espaces annulaires ................................................. 67 92. Information on suspended well ............................. 75 84. Vannes de sécurité de fond .................................... 68 93. Order to abandon well ........................................... 75 85. Têtes de puits et têtes d’éruption ........................... 69 94. Removal of casing ................................................. 76 86. Events et écoulement du tubage de surface ........... 70 95. Location of abandonment plugs ............................. 77 87. Essais des vannes et des capteurs .......................... 72 96. Surface abandonment ........................................... 78 88. Inspection et essai des matériels ........................... 73 97. Plugging perforated interval .................................. 79 PARTIE 7 98. Length and quality of cement plugs ....................... 80 99. Fluid in abandoned or suspended wells ................. 80 ABANDON PROVISOIRE OU DÉFINITIF 100. Cement top and plug location ................................ 80 89. Exigences ............................................................... 73 101. Surface marking.................................................... 81 90. Autorisation d’abandonner un puits ....................... 74 102. Clean-up ............................................................... 81 91. Abandon provisoire d’un puits ............................... 74 c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page v September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES 92. Renseignements requis ..........................................75 PART 8 93. Arrêté d’abandon ...................................................75 EVALUATION 94. Retrait du tubage ...................................................76 95. Emplacement des bouchons ...................................77 103. Well evaluation ...................................................... 82 96. Abandon de surface................................................78 104. Gas content of drilling fluid .................................... 82 97. Obturation du tubage perforé .................................79 105. Drill cuttings .......................................................... 82 98. Longueur et qualité des bouchons de ciment ..........80 106. Conventional cores ................................................ 83 99. Fluide dans les puits abandonnés 107. Sidewall cores ....................................................... 84 définitivement ou provisoirement ...........................80 108. Wireline logs .......................................................... 84 100. Vérification des bouchons .......................................80 109. Deferment of wireline log ...................................... 86 101. Repères en surface .................................................81 110. Cased hole logs ...................................................... 86 102. Nettoyage du chantier ............................................81 111. Wireline log quality ................................................ 87 112. Formation flow tests and wireline tests PARTIE 8 generally ............................................................... 87 ÉVALUATIONS 113. Formation flow test requirements .......................... 88 114. Extended flow test programs ................................. 90 103. Évaluation de puits .................................................82 115. Well testing completed wells .................................. 90 104. Teneur en gaz du fluide de forage ..........................82 116. Well sample transportation .................................... 91 105. Déblais de forage ...................................................82 117. Analysis of fluid samples........................................ 92 106. Carottage classique ................................................83 118. Fluid samples from completed well ........................ 93 107. Carottage latéral ....................................................84 119. Pool pressure surveys and measurements ............. 95 108. Diagraphies au câble ..............................................84 109. Report de la diagraphie au câble ............................86 PART 9 110. Diagraphies en trous tubés ....................................86 PRODUCTION OPERATIONS 111. Qualité de la diagraphie au câble ...........................87 112. Essais d’écoulement de formation et essais au 120. Operating manuals ................................................ 96 câble ......................................................................87 121. Notice of beginning or discontinuance of 113. Exigences des essais d’écoulement de production ............................................................. 96 formation ...............................................................88 122. Maximizing recovery ............................................. 96 114. Programme d’essais d’écoulement prolongés .........90 123. Reservoir management.......................................... 97 115. Essais de puits achevés ..........................................90 124. Voidage replacement ............................................. 97 116. Manutention des échantillons .................................91 125. Multi-pool wells ..................................................... 98 117. Analyse des échantillons de fluides .........................92 126. Commingled production ......................................... 98 118. Échantillons de fluides de puits achevés .................93 127. Flaring and venting of gas ..................................... 99 119. Détermination de la pression dans un gisement .....95 128. Flare requirements .............................................. 101 129. Variation of regulations for unitized pool ............. 103 PARTIE 9 PART 10 ACTIVITÉS DE PRODUCTION PRODUCTION RATES 120. Manuels d’utilisation...............................................96 121. Avis de mise en production ou d’interruption 130. Good production practices ................................... 103 de la production .....................................................96 OIL PRODUCTION 122. Récupération maximale ..........................................96 123. Gestion du réservoir ...............................................97 131. Restriction of oil production ................................. 103 124. Désaturation évitée ................................................97 132. Daily oil allowable ................................................ 104 125. Puits de gisements multiples ..................................98 133. Test period allowable ........................................... 106 126. Production mélangée ..............................................98 134. Well test of oil wells ............................................. 106 127. Brûlage à la torche et aération de gaz ....................99 135. Adjustment of oil production................................ 107 128. Exigences pour le brûlage à la torche ................... 101 136. Underproduction of oil ......................................... 108 129. Modification du règlement dans le cas d’un 137. Overproduction of oil ........................................... 108 gisement faisant l’objet d’un accord d’union ........ 103 GAS PRODUCTION PARTIE 10 138. Gas well tests ...................................................... 108 Page vi YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES 139. Restriction of gas production ................................ 109 TAUX DE PRODUCTION 140. Daily gas allowable ............................................... 109 130. Saines méthodes de production ........................... 103 141. Overproduction of gas .......................................... 111 PRODUCTION DE PÉTROLE PART 11 131. Restriction de la production ................................. 103 MEASUREMENT AND TESTING 132. Production quotidienne autorisée de pétrole ........ 104 142. Water produced at oil wells .................................. 111 133. Production autorisée pour une période d’essai ..... 106 143. Water produced at gas wells ................................ 113 134. Essai de production de puits de pétrole ................ 106 144. Flow system ......................................................... 113 135. Ajustement de la production de pétrole ................ 107 145. Recording flow rate and volume of fluids .............. 115 136. Sous-production - Pétrole .................................... 108 146. Transfer meters ................................................... 116 137. Surproduction - Pétrole ........................................ 108 147. Test and group oil production meter calibration ... 118 PRODUCTION DE GAZ 148. Water meter calibration ....................................... 119 138. Essais des puits de gaz ........................................ 108 149. Gas meter calibration ........................................... 120 139. Restrictions quant à la production de gaz ............ 109 150. Condensate meter calibration ............................... 120 140. Production quotidienne autorisée de gaz .............. 109 151. Testing frequency ................................................. 121 141. Surproduction de Gaz .......................................... 111 152. Accuracy of measurement .................................... 121 PARTIE 11 PART 12 MESURAGE ET ESSAIS SAFETY AND ENVIRONMENTAL PROTECTION 142. Production d’eau dans les puits de pétrole ........... 111 153. Safety and environmental protection plans ........... 121 143. Production d’eau dans les puits de gaz ................ 113 154. Contingency plans ................................................ 123 144. Système d’écoulement ......................................... 113 155. Availability of plans .............................................. 123 145. Débit et volume des fluides .................................. 115 156. General safety of operations ................................. 123 146. Compteurs de transfert ........................................ 116 157. Fire precautions ................................................... 124 147. Étalonnage des compteurs de production 158. Fire control .......................................................... 126 regroupée et des compteurs de production 159. Training ............................................................... 127 d’essai ................................................................. 118 160. Capability of employees ........................................ 128 148. Étalonnage des compteurs d’eau .......................... 119 161. Defective or experimental equipment ................... 129 149. Étalonnage des compteurs de gaz ........................ 120 162. Unproven drilling equipment ................................ 130 150. Mesure du condensat ........................................... 120 163. Construction disturbances .................................... 130 151. Fréquence des essais ........................................... 121 164. Handling of oilfield waste ..................................... 131 152. Précision des mesures ......................................... 121 165. Produced water .................................................... 131 166. Cessation of operations ........................................ 132 PARTIE 12 167. Ceasing operation after serious incident ............... 133 SÉCURITÉ ET PROTECTION DE L’ENVIRONNEMENT 168. Simultaneous operations ...................................... 134 169. Bodies of water .................................................... 134 153. Plans de sécurité et de protection 170. H2S control .......................................................... 134 environnementale ................................................ 121 171. Bulk handling of fuel and consumables ................. 138 154. Plans d’intervention ............................................. 123 172. Disposal of oil ....................................................... 139 155. Accès aux plans approuvés .................................. 123 173. Oil storage ........................................................... 140 156. Dispositions générales ......................................... 123 157. Précautions en cas d’incendie .............................. 124 PART 13 158. Extinction d’incendies et contrôle de feu .............. 126 RECORDS AND REPORTS 159. Formation du personnel ....................................... 127 160. Compétence des employés ................................... 128 174. Notice and submission prior to operation start ..... 141 161. Matériel de forage défectueux ou expérimental .... 129 175. Notice of drilling and rig release ........................... 141 162. Matériel de forage non éprouvé ........................... 130 176. Release of information ......................................... 141 163. Perturbations dues aux travaux de construction ... 130 177. Notice respecting operators .................................. 143 164. Manutention des déchets du champ de pétrole ..... 131 178. Reference for well depths ..................................... 144 165. Eaux de procédés ................................................. 131 179. Notification of significant events ........................... 144 166. Cessation des travaux .......................................... 132 c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page vii September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES 180. Press releases ...................................................... 145 167. Cessation des travaux par suite d’incident 181. Tour sheets ......................................................... 145 grave ................................................................... 133 182. Summary reports ................................................ 145 168. Travaux simultanés .............................................. 134 183. Submission requirements under Part 8 ................ 146 169. Étendues d’eau ..................................................... 134 184. Metering records ................................................. 147 170. Lutte contre l’hydrogène sulfuré (H2S) .................. 134 185. Penetration and gas content records ................... 148 171. Manutention en vrac du combustible et de 186. Formation flow test records ................................. 148 consommables ..................................................... 138 187. Well termination record ....................................... 148 172. Élimination de pétrole .......................................... 139 188. Final well report .................................................. 149 173. Stockage de pétrole .............................................. 140 189. Maintenance and operating records ..................... 149 PARTIE 13 190. Daily production records ...................................... 150 191. Monthly production report ................................... 150 REGISTRES ET RAPPORTS 192. Annual production report ..................................... 152 174. Avis précédant le début des travaux ..................... 141 193. Filing of unit agreements ..................................... 153 175. Avis de forage et de retrait de l’appareil de 194. Scheme reporting ................................................ 154 forage .................................................................. 141 195. Information respecting working interests ............ 154 176. Divulgation de renseignements ............................ 141 PART 14 177. Avis concernant l’exploitant .................................. 143 178. Mesure des profondeurs de puits ......................... 144 ENFORCEMENT OF REPORTING REQUIREMENTS 179. Avis d’événements importants.............................. 144 196. Definitions for Part 14 ......................................... 155 180. Communiqués de presse ...................................... 145 197. Other sanctions not affected by Part 14 ............... 156 181. Rapports de poste ................................................ 145 198. Request to submit a report .................................. 156 182. Rapports sommaires ............................................ 145 199. Penalties related to section 191 reports ............... 156 183. Expédition d’échantillons au ministre en vertu 200. Other automatic penalties ................................... 157 de la partie 8 ....................................................... 146 201. Discretionary penalties ........................................ 157 184. Registres de production ....................................... 147 202. Invoicing for penalties ......................................... 158 185. Rapports sur les teneurs en gaz et les vitesses de pénétration ..................................................... 148 203. Waiver of penalty................................................. 158 186. Rapports d’essais d’écoulement de formation ....... 148 204. Appeals respecting penalties ................................ 159 187. Rapport de cessation de travaux .......................... 148 SCHEDULE A 188. Rapport final à l’égard du puits ............................ 149 SCHEDULE B 189. Registre d’entretien et d’exploitation .................... 149 190. Rapports de production quotidienne ..................... 150 SCHEDULE C 191. Rapports de production mensuelle ....................... 150 SCHEDULE D 192. Rapports de production annuelle .......................... 152 SCHEDULE E 193. Dépôt des accords d’union ................................... 153 194. Rapports d’évaluation de plans ............................. 154 195. Renseignements concernant les intérêts économiques directs ............................................ 154 PARTIE 14 APPLICATION DES EXIGENCES EN MATIÈRE DE RAPPORTS 196. Définitions ............................................................ 155 197. Autres sanctions non touchées par la partie 14 .... 156 198. Demande de présentation d’un rapport ................ 156 199. Peines pécuniaires relatives aux rapports en vertu de l’article 191 ............................................ 156 200. Autres peines automatiques ................................. 157 201. Peines discrétionnaires ......................................... 157 202. Facturation des peines pécuniaires ....................... 158 203. Annulation de la peine .......................................... 158 Page viii YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz TABLE OF CONTENTS TABLE DES MATIÈRES 204. Appel d’une peine ................................................ 159 ANNEXE A ANNEXE B ANNEXE C ANNEXE D ANNEXE E c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page ix September 30, 2022 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. OO.IIL. CA. N2D0 0G4A/S1 5A8CT DLOÉIC RSEUTR 2 L0E0 P4É/1TR58OL E ET LE GAZ RÈGLEMENT SUR LES TRAVAUX DE OIL AND GAS DRILLING AND FORAGE ET DE PRODUCTION DE PRODUCTION REGULATIONS PÉTROLE ET DE GAZ 1. Interpretation (Définitions) 1. Interpretation 1. Définitions In these Regulations, Les définitions qui suivent s’appliquent au présent règlement. “abandoned”, in relation to a well, means a well that « abandonné » Signifie, en ce qui concerne un puits, has been permanently plugged and whose well site has qu’il a été obturé de façon permanente et que son been cleaned up, in accordance with Part 7; chantier a été nettoyé conformément aux dispositions « abandonné » de la partie 7 du présent règlement. “abandoned” “Act” means the Oil and Gas Act; « Loi » « abandonné provisoirement » Signifie, à l’égard d’un puits, que les travaux de forage ou les activités de “barrier” means production y ont été temporairement interrompus et (a) any remotely-operated valve or set of valves que le puits est obturé conformément aux directives de that can be regularly pressure-tested, la partie 7 du présent règlement. “suspended” (b) any fluid that exerts sufficient hydrostatic « achevé » Signifie, en ce qui concerne un puits, qu’il pressure to overbalance the reservoir pressure, a été préparé afin de permettre l’un ou l’autre des (c) any cement plug placed in the well bore, procédés suivants : (d) any pressure-sealing mechanical equipment a) la production de fluides à partir du puits; installed in the wellhead or christmas tree or in b) l’observation du rendement d’une formation; the production tubing, annulus or well bore, or c) l’injection de fluides dans le puits; (e) any other pressure-sealing mechanism installed for the purpose of preventing the flow of fluids d) l’évacuation de fluides dans le puits. from a well or from a reservoir into the well “completed” bore; « barrière » « activités de production » Les travaux liés à la “blowout prevention system” means production de pétrole et de gaz à partir d’un gisement, ou à l’injection de fluide dans un gisement. “production (a) in relation to a drilling operation, the operation” combination of the blowout prevention equipment listed in paragraph 36(2)(b), and « aire d’intervention en cas d’urgence » Désigne, en ce qui concerne un puits ou une installation de champ (b) in relation to a well operation, the combination pétrolifère ou gazéifère, selon le cas : of the blowout prevention equipment listed in paragraph 76(2)(b); « système d’obturateurs a) la surface circulaire entourant un puits ou une installation de champ pétrolifère ou gazéifère et c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 1 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. anti-éruption » située dans le rayon déterminé conformément à l’annexe A; “casing liner” means a casing that b) la surface entourant le puits ou l’installation de (a) is suspended from a string of casing previously champ pétrolifère ou gazéifère, désignée aire installed in a well, and d’intervention en cas d’urgence pour le puits ou (b) does not extend to the wellhead; « tubage l’installation de champ en question par le partiel » délégué aux opérations, selon la surface qui, dans son estimation, pourrait être exposée à “christmas tree”, in relation to a well, means an des concentrations nocives d’hydrogène sulfuré assembly of valves mounted on the casing head or si des gaz s’échappaient du puits ou de wellhead l’installation de champ. “Emergency Planning (a) through which the well is produced or tested, Zone” and « appareil » Un appareil de forage ou un appareil (b) that can be used for shutting in the well; « tête d’intervention sur puits en production. “rig” d’éruption » « approbation d’un plan » L’approbation d’un plan “completed”, in relation to a well, means a well that accordée en vertu du paragraphe 73(1) de la Loi ou des has been prepared to permit the paragraphes 123(3) et 126(1) du présent règlement. (a) production of fluids from the well, “Scheme Approval” (b) observation of the performance of a formation, « autorisation d’exploitation d’un puits » Désigne, à (c) injection of fluids into the well, or l’égard d’un puits, l’autorisation d’effectuer des activités relatives à ce puits, délivrée en vertu du (d) disposal of fluids into the well; « achevé » présent règlement. “Well Operation Approval” “completion interval” means an interval of the « barrière » Signifie, à l’égard d’un puits: subsurface through which fluid may enter or leave a well bore in accordance with the purpose for which the a) toute vanne ou ensemble de vannes well was completed; « intervalle d’achèvement » commandées à distance qui peuvent être soumises régulièrement à un essai sous “condensate” means a mixture of substances, most of pression; which are pentanes and heavier hydrocarbon components, that is recovered or is recoverable at a b) tout fluide exerçant une pression hydrostatique well from an underground reservoir and that may be supérieure à la pression du réservoir; gaseous in its virgin reservoir state but is liquid in the c) tout bouchon de ciment placé dans le trou de conditions under which its volume is measured or sonde; estimated; « condensat » d) tout dispositif mécanique d’étanchéité monté “conductor pipe” means a large diameter pipe installed dans la tête de puits ou dans la tête d’éruption, in a well to provide a conductor for drilling fluid dans la colonne de production, dans l’espace through surficial formations; « tuuau guide » annulaire ou dans le trou de sonde; e) tout autre dispositif d’étanchéité installé dans le “conductor casing” means casing that is installed in a but d’empêcher l’écoulement de fluides well to facilitate well control during drilling of the hole provenant d’un puits ou d’un réservoir dans le for the surface casing; « tubage initial » trou de sonde. “daily production limit”, in relation to a well, means a “barrier” volume equal to 125 % of the DGA or DOA, as the case requires, for the well; « contingent de production « câble » Un câble utilisé pour le déplacement des quotidienne » instruments de relevé ou d’autres appareils dans un puits; il peut s’agir : “designated” means, a) d’un câble d’acier; (a) in relation to a field, designated pursuant to paragraph 71(a) of the Act, or b) d’un câble composé de plusieurs fils d’acier, de Page 2 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. (b) in relation to a pool, designated pursuant to cuivre ou d’autres métaux enveloppés dans un paragraph 71(b) of the Act; isolant électrique. “wireline” « désigné » « chantier » L’emplacement d’un puits ou d’une installation de champ pétrolifère ou gazéifère. “site” “development well” means a well or portion of a well that is classified under section 16 as a development « chantier d’un puits » Une superficie de terrain well; « puits de développement » acquise à titre d’emplacement pour un puits. “well site” “DGA” or “daily gas allowable”, in relation to a gas « colonne de production » La colonne de tubage la well, means the volume of gas calculated as the daily plus profonde, installée dans un trou de sonde à des gas allowable for the well in accordance with fins de production ou d’injection. “production casing” section 140; « PQAG » or « production quotidienne « colonne technique » Le tubage installé dans un autorisée de gaz » puits, après l’installation d’un tubage de surface, et par “discovery well” means an exploratory well that is the lequel des travaux de forage ultérieurs peuvent être first producing well in a pool, or, when no well in the effectués à l’intérieur du puits. “intermediate casing” pool is producing, the completed well that, in the « condensat » Un mélange de substances, dont la opinion of the Chief Operations Officer, is capable of plupart sont des pentanes et des composants being the first producing well in the pool; « puits de d’hydrocarbures plus lourds, récupéré ou récupérable découverte » d’un réservoir souterrain à partir d’un puits et qui peut “DOA” or “daily oil allowable”, in relation to an oil well, être gazeux à son état original en réservoir, mais qui means the volume of oil calculated as the daily oil est liquide dans les conditions où son volume est allowable for the well in accordance with section 132; mesuré ou estimé. “condensate” « PQAP » or « production quotidienne autorisée de « conditions normales de référence » Désigne une pétrole » température et une pression atmosphérique à 15°C “drill crew” means the personnel whose primary duties et 101 325 kPa, qu’on appelle aussi conditions consist of the operation of a drilling rig; « équipe de standard. “standard atmospheric pressure and forage » temperature” “drill floor” means, in respect of a drilling rig, the « contingent de production quotidienne » En ce qui stable platform that surrounds the drill pipe and concerne un puits, le volume correspondant à 125 % provides support for the drill crew during drilling de la production quotidienne autorisée de gaz (PQAG) operations; « plancher de forage » ou de la production quotidienne autorisée de pétrole (PQAP), selon le cas, pour ce puits. “daily production “drilling operation” means any operation related to the limit” drilling of a well bore utilizing a drilling rig; « travaux de forage » « date de retrait de l’appareil de forage » Signifie la date, selon les dossiers du ministère, à laquelle un “Emergency Planning Zone”, in relation to a well or appareil de forage ou un appareil d’intervention est field facility, means retiré d’un puits. “rig release date” (a) the circular area surrounding a well or field « déchets solides » S’entend au sens de la Loi sur facility and within the radius determined in l’environnement. En sont exclus les fluides de forage et accordance with Schedule A, or les déblais de forage. “solid waste” (b) the area surrounding the well or field facility determined by the Chief Operations Officer as « démarrage d’un forage » Désigne, à l’égard du the Emergency Planning Zone for the well or forage d’un puits, la pénétration initiale par l’appareil facility on the basis of the estimated area de forage, de la surface du sol ou de la surface située which could be exposed to hazardous immédiatement au-dessous du tuyau guide. “spud-in” concentrations of hydrogen sulphide if gas « dépôt exigible pour un puits » Le dépôt fourni ou were released from the well or field facility; toute autre garantie de sécurité fournie à l’égard d’un « aire d’intervention en cas d’urgence » puits, conformément aux dispositions de l’article 90 de c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 3 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. “exploratory well” means a well or portion of a well la Loi. “well deposit” that is classified under section 16 as an exploratory « désigné » Signifie : outpost well or exploratory wildcat well; « puits a) en ce qui concerne un champ, qu’il est désigné d’exploration » en application de l’alinéa 71a) de la Loi; “field facility” means a facility of a kind enumerated in b) en ce qui concerne un gisement, qu’il est subsection 22(1); « installation de champ » désigné en application de l’alinéa 71b) de la Loi. “Field Facility Licence” means a licence issued in “designated” respect of a field facility; « licence d’installation de « eaux de procédés » L’eau extraite d’un puits champ » accessoirement au pétrole et au gaz et séparée du “field facility site” means the surface area of the land pétrole et du gaz soit à l’emplacement du puits où ils acquired as the site for a field facility; « emplacement ont été récupérés, ou à un endroit en aval de celui-ci.
Part document.segment-2
Oil and Gas Drilling and Production Regulations — segment 2
- document.segment-2 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 2
AI-assisted research summary: This part defines key oil and gas terms and sets licensing rules for drilling and certain well operations.
d’une installation de champ » “produced water” “flow system” means the flow meters and auxiliary « emplacement d’une installation de champ » La equipment attached to the flow meters, fluid sampling superficie de terrain pour laquelle les titres devices, well test equipment and the master meter and d’acquisition ont été obtenus en vue de l’exploitation meter prover used to measure and record the rate and d’une installation de champ. “field facility site” volumes at which fluids are produced from or injected « emplacement des droits pétroliers et gaziers » into a pool, used as a fuel, used for artificial lift, flared S’entend de : or transferred from a field facility; « système d’analyse du débit » a) la superficie de terrain visée par un titre d’aliénation, relativement aux terres “formation flow test” means an operation to induce pétrolifères et gazéifères du Yukon; the flow of formation fluids to the surface of a well for b) la superficie de terrain à l’égard de laquelle the purpose of procuring reservoir fluid samples and sont octroyés des droits pétroliers et gaziers en determining reservoir flow characteristics, and includes vertu d’un instrument ou d’une entente, a drill stem test; « essai d’écoulement de formation » relativement à un terrain autre que des terres “gas”, when the context permits, includes any gaseous pétrolifères et gazéifères du Yukon. “oil and substance; « gaz » gas rights location” “gas pool” means a pool that contains hydrocarbon « équipe de forage » Personnel dont les fonctions components predominantly in a gaseous state; principales consistent à assurer le fonctionnement d’un « gisement de gaz » appareil de forage. “drill crew” “gas-oil ratio adjustment factor” means that factor « essai au câble » Un essai sur une surface limitée determined from the formula in Schedule B as applied d’un puits exécuté par travail au câble ou par un to the daily oil allowable to determine an allowed rate moyen équivalent, dans le but d’en déterminer la of production; « facteur de correction du rapport gaz- pression interstitielle statique, de fournir une pétrole » évaluation qualitative de sa perméabilité ou d’y “gas well” means a well that produces gas from a gas recueillir des échantillons de fluides. “wireline test” pool or from the gas cap portion of an oil pool; « puits « essai d’écoulement de formation » L’activité de gaz » d’induire l’écoulement des fluides d’une formation vers “good production practice” means production of oil or la surface d’un puits dans le but d’obtenir des gas at a rate not governed by a DOA or DGA but limited échantillons de ces fluides et déterminer leurs to what can be produced without adversely and caractéristiques d’écoulement dans ce réservoir, et significantly affecting conservation, the prevention of comprend un essai aux tiges de forage. “formation flow waste, or the opportunity of each owner in the pool to test” obtain the owner’s share of production; « saine « essai d’un puits » Un essai exécuté dans un puits méthode de production » achevé afin de mesurer les débits auxquels les fluides Page 4 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. “intermediate casing” means the casing installed in a sont produits par le puits ou injectés dans le puits sur well, following the installation of a surface casing in the un gisement donné en vue d’en évaluer le réservoir. well, through which further drilling operations may be “well test” carried out in the well; « colonne technique » « exploitation d’un puits » Désigne, en ce qui “licensee” concerne un puits, toute activité de la sorte énumérée au paragraphe 5(2) y compris les activités y reliées. (a) in relation to a well, means the holder of the “well operation” Well Licence for the well according to the records of the Department, or « exploitation unitaire » Les travaux effectués en (b) in relation to a field facility, means the holder vertu d’un accord d’union. “unit operation” of the Field Facility Licence for the field facility « facteur de correction du rapport gaz-pétrole » Le according to the records of the Department. facteur déterminé selon la formule indiquée à l’annexe « titulaire de licence » B, qui s’applique à la production quotidienne de pétrole “monthly oil allowable” means, for any month, the autorisée dans le calcul du taux de production autorisé. “gas-oil ratio adjustment factor” volume of oil determined by multiplying the daily oil allowable by the number of days in the month; « gaz » Dépendant du contexte, comprend toute « production mensuelle autorisée de pétrole » substance gazeuse. “gas” “multi-pool well” means a well that has been « gaz acide » Tout gaz ou composant gazeux du completed in more than one pool; « puits de gisements pétrole contenant de l’hydrogène sulfuré. “sour gas” multiples » « gisement de gaz » Un gisement qui contient des “oil and gas rights agreement” means mélanges d’hydrocarbures principalement à l’état (a) a disposition, in relation to Yukon oil and gas gazeux (monophasique). “gas pool” lands, or « gisement de pétrole » Un gisement qui contient des (b) an instrument or agreement granting rights to hydrocarbures se trouvant principalement à l’état oil or gas or both, in relation to land other than liquide (monophasique). “oil pool” Yukon oil and gas lands; « entente sur les « idoine au gaz acide » Désigne un matériel fabriqué à droits pétroliers et gaziers » partir de substances métalliques résistantes à la “oil and gas rights location” means fissuration sous contrainte induite par le sulfure, conformément à la norme MR0175-2001, « Sulfide (a) the surface area of land described in a Stress Cracking Resistant Metallic Materials for Oilfield disposition, in relation to Yukon oil and gas Equipment » du « National Association of Corrosion lands, and Engineers » et de substances non-métalliques (b) the surface area of land in respect of which oil conformément au paragraphe 2.11(8) du manuel or gas rights are granted by an instrument or intitulé « Alberta Recommended Practices for agreement, in relation to land other than Yukon Completing and Servicing Critical Sour Wells » du oil and gas lands; « emplacement des droits « Petroleum Industry Training Service ». “sour pétroliers et gaziers » service” “oil pool” means a pool that contains hydrocarbon « installation de champ » L’une des installations components predominantly in a liquid state; énumérées au paragraphe 22(1) du présent règlement. « gisement de pétrole » “field facility” “oil well” means a well that produces oil from an oil « intervalle d’achèvement » L’intervalle souterrain par pool; « puits de pétrole » lequel un fluide entre dans un trou de sonde ou en sort, “overproduction” conformément à l’usage pour lequel le puits a été achevé. “completion interval” (a) in relation to oil, means, at the end of the test period, the amount by which oil production « licence d’installation de champ » S’entend d’une during the test period exceeds the test period licence délivrée pour une installation de champ. “Field c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 5 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. allowable and, at the end of any succeeding day Facility Licence” means the amount by which the actual « licence de puits » Une licence délivrée à l’égard d’un production from the beginning of the puits. “Well Licence” production period exceeds the production target, and « Loi » La Loi sur le pétrole et le gaz. “Act” (b) in relation to gas, means, at the end of a « matériel de contrôle d’un puits » Désigne, en ce qui production period, the amount by which the concerne un puits, tout matériel installé ou monté dans gas production from the beginning of the le but de contrôler le puits, y inclus notamment le period exceeds the product of the DGA and the système d’obturateurs anti-éruption et le tubage, la number of days in the period; cloche de repêchage à coins, les vannes, le séparateur « surproduction » et tout matériel auxiliaire utilisé pour le contrôle du puits. “well control equipment” “permafrost” means the thermal condition of the ground when its temperature is at or below 0oC for « pergélisol » La condition thermique du sol lorsque sa more than one year; « pergélisol » température est égale ou inférieure à 0°C pendant plus d’un an. “permafrost” “permafrost casing” means the conductor casing installed in a well to protect against the hazards « période d’essai » Désigne : associated with the thawing of a permafrost section or a) à l’égard d’un puits de pétrole, la période the liberation of gas within or immediately below a s’étendant à partir de la première date de permafrost section; « tubage de pergélisol » production suivant les travaux d’achèvement “produced water” means water produced in sur le puits jusqu’à l’avènement du plus court conjunction with oil or gas and separated from the oil des délais suivants : or gas either at the site of the well from which the oil (i) la fin des 90 premiers jours de production, or gas was recovered or at a point downstream from (ii) la durée prévue pour la période d’essai the site of the well; « eaux de procédés » autorisée pour le puits; “production casing” means the innermost casing string b) à l’égard d’un puits de gaz, la période installed in a well bore for production or injection s’étendant à partir de la première date de purposes; « colonne de production » production suivant les travaux d’achèvement “production operation” means an operation that is sur le puits jusqu’à l’avènement de la fin des 90 related to the production of oil or gas from a pool or premiers jours de production de ce puits. “test the injection of fluid into a pool; « activités de period” production » « période de production » Désigne la période “production period” means a period beginning on the commençant le jour qui suit la période d’essai et se day following the test period to the following terminant le 31 octobre suivant, et, par la suite, October 31 and thereafter means a 12-month period désigne une période de douze mois se terminant le 31 ending on October 31 each year; « période de octobre de chaque année. “production period” production » « plan » S’entend au sens du paragraphe 73(1) de la “production target” means, at the end of any day, the Loi ou des paragraphes 123(3) et 126(1) du présent sum of the daily oil allowable for each day from the règlement. “scheme” beginning of the production period plus any « plancher de forage » Désigne, en ce qui concerne un underproduction or less any overproduction carried appareil de forage, la plate-forme fixe entourant la forward from the test period; « production cible » table de rotation, qui sert de palier pour l’équipe de “recovery” means, in respect of oil and gas, the forage au cours des travaux de forage. “drill floor” ultimate recovery of oil and gas under foreseeable « PQAG » ou « production quotidienne autorisée de economic and operational conditions; « récupération » gaz » Signifie, en ce qui concerne un puits de gaz, le “relief well” means a well drilled to assist in controlling volume de gaz calculé comme étant la production a blowout in an existing well; « puits d’intervention » quotidienne autorisée de gaz pour ce puits Page 6 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. “rig” means a drilling rig or service rig; « appareil » conformément à l’article 140 du présent règlement. “DGA” ou “daily gas allowable” “rig release date”, in relation to a well, means the date a drilling or service rig is released from the well « PQAGAA » ou « production quotidienne autorisée de according to the records of the Department; « date de gaz avant ajustement » Désigne, à l’égard d’un puits, retrait de l’appareil de forage » la production quotidienne autorisée de gaz avant ajustement déterminée en application de l’article 140. “scheme” means a scheme referred to in section 73(1) “UDGA” ou “unadjusted daily gas allowable” of the Act or subsection 123(3) or 126(1) of these Regulations; « plan » « PQAP » ou « production quotidienne autorisée de pétrole » Signifie, en ce qui concerne un puits de “Scheme Approval” means an approval of a scheme pétrole, le volume de pétrole calculé comme étant la issued pursuant to subsection 73(1) of the Act or production quotidienne autorisée de pétrole pour ce subsection 123(3) or 126(1) of these Regulations; puits, conformément à l’article 132 du présent « approbation d’un plan » règlement. “DOA” ou “daily oil allowable” “site” means a well site or a field facility site; « PQAPAA » ou « production quotidienne autorisée de « chantier » pétrole avant ajustement » Désigne, à l’égard d’un “solid waste” has the same meaning as in the puits, la production quotidienne autorisée de pétrole Environment Act, but does not include drilling fluid and avant ajustement déterminée en application de drill cuttings; « déchets solides » l’article 132. “UDOA” ou “unadjusted daily oil allowable” “sour gas” means any gas or any gaseous component of oil that contains hydrogen sulphide; « gaz acide » « production cible » Désigne, à la fin d’une journée quelconque, la somme de la production quotidienne “sour service” means manufactured from metallics autorisée de pétrole pour chaque journée à compter du resistant to sulphide stress cracking in accordance with début de la période de production, augmentée de toute the National Association of Corrosion Engineers’ Sulfide sous-production, ou réduite de toute surproduction Stress Cracking Resistant Metallic Materials for Oilfield reportée de la période d’essai. “production target” Equipment (NACE Standard MR0175-2001) and non- metallics in accordance with subsection 2.11(8) of the « production mensuelle autorisée de pétrole » Petroleum Industry Training Service’s Alberta Signifie, pour un mois donné, le volume de pétrole Recommended Practices for Completing and Servicing déterminé en multipliant la production de pétrole Critical Sour Wells; « idoine au gaz acide » quotidienne autorisée par le nombre de jours dans ce mois. “monthly oil allowable” “sour well” means a well that produces or is capable of producing sour gas or is expected to encounter sour « puits corrosif » Un puits produisant ou pouvant gas bearing formations during drilling operations; produire du gaz acide ou dont il est attendu qu’il « puits corrosif » traversera des formations renfermant du gaz acide lors du forage. “sour well” “spud-in”, in relation to the drilling of a well, means the initial penetration of the earth’s surface or the « puits d’exploration » Un puits ou une partie d’un surface immediately below the conductor pipe with a puits classifié puits de sondage d’extension ou puits de drilling rig; « démarrage d’un forage » reconnaissance en vertu de l’article 16 du présent règlement. “exploratory well” “standard atmospheric pressure and temperature” means 101.325 kPa and 15°C; « conditions normales « puits de découverte » Un puits d’exploration de référence » constituant le premier puits productif sur un gisement ou, si aucun puits sur ce gisement n’est productif, le “surface casing” means the casing installed in a well to puits achevé qui, de l’avis du délégué aux opérations, a sufficient depth, in a competent formation, to pourrait être le premier puits productif sur le gisement. establish well control for the continuation of the drilling “discovery well” operation; « tubage de surface » « puits de développement » Un puits ou une partie “suspended”, in relation to a well, means a well in d’un puits classifié comme puits de développement en respect of which drilling or production operations have c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 7 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. temporarily ceased and which is plugged in accordance vertu de l’article 16 du présent règlement. with Part 7; « abandonné provisoirement » “development well” “test period” means « puits de gaz » Un puits qui produit du gaz à partir d’un gisement de gaz ou à partir du chapeau de gaz (a) in relation to an oil well, the period beginning d’un gisement de pétrole. “gas well” with the day of first production after the well is completed and ending at the expiration of the « puits de gisements multiples » Un puits ayant été lesser of achevé dans plus d’un gisement. “multi-pool well” (i) the well’s first 90 producing days, and « entente sur les droits pétroliers et gaziers » (ii) the number of days required to produce the S’entend de l’un ou l’autre des instruments suivants : test period allowable for the well, or a) d’un titre d’aliénation, tel que le définit la Loi, à (b) in relation to a gas well, the period beginning l’égard des terres pétrolifères et gazéifères du with the day of first production after the well is Yukon; completed and ending at the expiration of the b) d’un instrument ou d’une entente octroyant des well’s first 90 producing days; « période droits pétroliers et gaziers ou l’un ou l’autre de d’essai » ceux-ci, à l’égard d’une terre autre que des “UDGA” or “unadjusted daily gas allowable”, in relation terres pétrolifères et gazéifères du Yukon. “oil to a well, means the unadjusted daily gas allowable and gas rights agreement” determined for the well pursuant to section 140; « puits de pétrole » Un puits qui produit du pétrole à « PQAGAA » or « production quotidienne autorisée de partir d’un gisement de pétrole. “oil well” gaz avant ajustement » « puits d’intervention » Un puits foré pour aider au “UDOA” or “unadjusted daily oil allowable”, in relation contrôle de l’éruption d’un puits déjà en service. “relief to a well, means the unadjusted daily oil allowable well” determined for the well pursuant to section 132; « PQAPAA » or « production quotidienne autorisée de « reconditionnement » Toute activité dans un puits pétrole avant ajustement » qui en exige le retrait des têtes d’éruption ou arbres de Noël, exception faite de l’achèvement, de la remise en “underproduction”, in relation to oil, means, at the end production, de l’abandon provisoire, de l’abandon ou du of the test period, the amount by which oil production réabandon du puits. “workover” during the test period is less than the test period allowable and, at the end of any succeeding day, means « récupération » Désigne, en ce qui concerne le the amount by which the actual production from the pétrole et le gaz, la récupération ultime de pétrole et de beginning of the production period is less than the gaz effectuée en tenant compte des conditions production target; « sous-production » économiques et opérationnelles prévisibles. “recovery” “unit” means an area of land described as a unit in « saine méthode de production » S’entend de la section 4 of the Oil and Gas Disposition Regulations; production de pétrole ou de gaz qui ne dépend pas d’une PQAP ni d’une PQAG mais qui est limitée par ce « unité » qui peut être produit sans porter atteinte de façon “unit area” means an area that is the subject of a unit importante à la conservation, à la prévention du agreement; « secteur unitaire » gaspillage, ou à la possibilité pour chaque détenteur d’un intérêt dans le gisement d’obtenir sa part de la “unit operation” means operations conducted pursuant production. “good production practice” to a unit agreement; « exploitation unitaire » « secteur unitaire » Une superficie de terrain faisant “well-bore” means the hole drilled by a bit in order to l’objet d’un accord d’union. “unit area” make a well; « trou de sonde » « sous-production » Désigne, en ce qui concerne le “well control” means the control of the movement of pétrole, une fois arrivée la fin de la période d’essai, la fluids into or from a well; « contrôle d’un puits » part de la production de pétrole durant la période “well control equipment”, in relation to a well, means d’essai qui est en deçà de la production autorisée pour Page 8 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 1. Article 1. any equipment installed for the purpose of controlling cette période et, pour chacune des journées qui the well, including but not limited to the blowout suivent, la part de la production réelle depuis le début prevention system for the well and the casing, casing de la période de production qui est en deçà de la bowl, valves, separator and auxiliary equipment used production cible. “underproduction” for the control of the well; « matériel de contrôle d’un « surproduction » Désigne, en ce qui concerne : puits » a) le pétrole, une fois arrivée la fin de la période “well deposit” means a deposit or other security d’essai, la part de la production de pétrole required to be furnished in respect of a well pursuant durant la période d’essai qui excède la to section 90 of the Act; « dépôt exigible pour un production autorisée pour cette période et, à la puits » fin de chacune des journées qui suivent, la part “Well Licence” means a licence issued in respect of a de la production réelle qui, depuis le début de well; « licence de puits » la période de production, excède la production cible; “well operation”, in relation to a well, means any operation of a kind enumerated in subsection 5(2) and b) le gaz, à la fin d’une période de production, la performed in respect of the well and includes any part de la production de gaz depuis le début de activities related to that operation; « exploitation d’un la période qui excède le produit de la PQAG et puits » du nombre de jours dans cette même période. “overproduction” “Well Operation Approval”, in relation to a well, means a Well Operation Approval issued under these « système d’analyse du débit » Le système utilisé Regulations and respecting the performing of an pour mesurer et enregistrer le taux et le volume des operation in respect of the well; « autorisation fluides produits à partir d’un gisement ou injectés dans celui-ci, utilisés comme combustible ou pour d’exploitation d’un puits » l’ascension artificielle, brûlés ou transférés de “well site” means the surface area of the land acquired l’installation de champ; ce système est constitué des as the site of a well; « chantier d’un puits » débitmètres et de l’équipement connexe qui y est relié, “well test” means a test conducted on a completed well des dispositifs d’échantillonnage pour fluides, des to measure the rates at which fluids are produced from appareils d’essai de puits, du compteur général et de la or injected into a well in a pool for reservoir evaluation boucle d’étalonnage. “flow system” purposes; « essai d’un puits » « système d’obturateurs anti-éruption » Désigne : “wireline” means a line that is used to run survey a) en ce qui concerne le forage d’un puits, instruments or other tools in a well and that is made of l’ensemble du matériel d’obturation anti- (a) steel, or éruption énuméré à l’alinéa 36(2)b); (b) several wires made of steel, copper or other b) en ce qui concerne l’exploitation d’un puits, metals together with electrical insulation; l’ensemble du matériel d’obturation anti- « câble » éruption énuméré à l’alinéa 76(2)b). “blowout prevention system” “wireline test” means a limited invasion well operation conducted on wireline or other equivalent means, for « tête d’éruption » Désigne, en ce qui concerne un the purpose of determining static pore pressure, puits, l’ensemble de vannes monté sur la tête du providing a qualitative assessment of permeability or tubage ou sur la tête du puits, qu’on appelle aussi un gathering of fluid samples; « essai au câble » arbre de Noël, dont : “workover” means any operation in respect of a well a) on se sert pour exploiter le puits producteur ou that requires the removal of the christmas tree of the pour y faire des essais; well except when the christmas tree is removed in the b) on peut se servir pour fermer le puits. course of the completion, re-completion, suspension, “christmas tree” abandonment or re-abandonment of the well. « titulaire de licence » Le détenteur, selon les dossiers « reconditionnement » du ministère : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 9 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 2. Article 2. a) d’une licence de puits, lorsqu’il s’agit d’un puits; b) d’une licence d’installation de champ, lorsqu’il s’agit d’une installation de champ. “licensee” « travaux de forage » Tous les travaux liés au forage d’un trou de sonde avec un appareil de forage. “drilling operation” « trou de sonde » Un trou foré au moyen d’un trépan pour le creusage d’un puits. “well-bore” « contrôle d’un puits » Signifie le contrôle de la circulation des fluides qui pénètrent dans un puits ou qui en sortent. “well control” « tubage de pergélisol » Le tubage initial installé dans un puits pour protéger le puits contre les risques occasionnés par le dégel d’une zone de pergélisol ou l’émanation de gaz d’une zone de pergélisol ou au- dessous d’une telle zone. “permafrost casing” « tubage de surface » Le tubage installé assez profondément dans un puits traversant une formation exploitable pour en assurer le contrôle en vue de la poursuite des travaux de forage. “surface casing” « tubage initial » Le tubage installé dans un puits afin d’en faciliter le contrôle pendant le forage du trou en vue de l’installation du tubage de surface. “conductor casing” « tubage partiel » Désigne le tubage qui : a) d’une part, est suspendu à une colonne de tubage installée antérieurement dans le puits; b) d’autre part, n’atteint pas la tête du puits. “casing liner” « tuyau guide » Un tube de grand diamètre installé dans un puits afin de fournir une conduite adéquate pour le mouvement du fluide de forage entre les formations de surface; “conductor pipe” « unité » S’entend au sens de l’article 4 du Règlement sur les titres d’aliénation pétroliers et gaziers. “unit” 2. References to codes () 2. References to codes 2. Renvoi A reference in these Regulations to a code or Dans le présent règlement, tout renvoi à un code ou à publication published by any government, person or tout document publié par un gouvernement, un organization shall be read as a reference to individu ou un organisme vaut renvoi à : (a) that code or publication, as amended from time a) ce code ou ce document, et ses modifications; to time; and Page 10 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 3. Article 3. (b) if a new edition or reissuance of that code or b) advenant une réédition subséquente de ce code publication is published by that government, ou de ce document par son auteur, la nouvelle person or organization, the new edition or édition du code ou du document, et ses reissued publication, as amended from time to modifications. time. 3. Computation of days and months (Calcul des dates) 3. Computation of days and months 3. Calcul des dates (1) When any reference is made in a provision of (1) Toute mention d’un mois, qu’il soit ou non these Regulations to a month, whether by its name or mentionné par son nom, dans une disposition de ce not, and in context the provision relates to oil, the règlement se rapportant au pétrole, signifie une reference shall be construed as the period beginning période débutant à 7 h heure normale du Yukon le at 7:00 a.m. Yukon Standard Time on the first day of premier jour du mois et se terminant juste avant 7 h the month and ending immediately before 7:00 a.m. heure locale le premier jour du mois suivant. Yukon Standard Time on the first day of the next month. (2) When any reference is made in a provision of these (2) Toute mention d’un mois, qu’il soit ou non Regulations to a month, whether by its name or not, mentionné par son nom, dans une disposition de ce and in context the provision relates to gas or a product règlement se rapportant au gaz ou à un produit obtenu obtained from gas by processing or otherwise, the par le traitement du gaz ou autrement, signifie une reference shall be construed as the period beginning période débutant à 7 h heure locale le premier jour du at 7:00 a.m. local time on the first day of the month mois et se terminant juste avant 7 h heure locale le and ending immediately before 7:00 a.m. local time on premier jour du mois suivant. the first day of the next month. (3) When any reference is made in a provision of these (3) Toute mention d’un jour, qu’il soit ou non précisé, Regulations to a day, whether specified or not, and in dans une disposition de ce règlement se rapportant au context the provision relates to oil, the reference shall pétrole, signifie une période débutant à 7 h heure be construed as the period beginning at 7:00 a.m. normale du Yukon en ce jour et se terminant juste Yukon Standard Time on that day and ending avant 7 h heure normale du Yukon le jour suivant. immediately before 7:00 a.m. Yukon Standard Time on the next day. (4) When any reference is made in a provision of these (4) Toute mention d’un jour, qu’il soit ou non précisé, Regulations to a day, whether specified or not, and in dans une disposition de ce règlement se rapportant au context the provision relates to gas or a product gaz ou à un produit obtenu par le traitement du gaz ou obtained from gas by processing or otherwise, the autrement, signifie une période débutant à 7 h heure reference shall be construed as the period beginning locale en ce jour et se terminant juste avant 7 h heure at 7:00 a.m. local time on that day and ending locale le jour suivant. immediately before 7:00 a.m. local time on the next day. (5) In subsections (2) and (4), “local time” means (5) La mention de l’heure locale aux paragraphes (2) Yukon Standard Time or Yukon Daylight Saving Time, et (4) signifie soit l’heure normale du Yukon ou l’heure whichever is in effect. avancée du Yukon, dépendant de laquelle est en vigueur à ce moment. (6) The Chief Operations Officer may, on application, (6) Le délégué aux opérations peut, sur demande, direct the licensee of a well or field facility to compute ordonner au titulaire d’une licence de puits ou months or days for the purposes of these Regulations d’installation de champ de calculer, pour l’application in a manner different from the manner prescribed by du présent règlement, les mois et les jours de façon any of subsections (1) to (4). différente que celle proposée aux paragraphes (1) à (4). c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 11 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 4. Article 4. 4. Availability of Regulations (Disponibilité des règlements) 4. Availability of Regulations 4. Disponibilité des règlements The licensee of a well or field facility shall ensure that a Le titulaire d’une licence de puits ou d’installation de copy of these Regulations, and copies of any champ doit veiller à ce qu’un exemplaire du présent amendments to these Regulations règlement ainsi que des exemplaires de ses modifications subséquentes: (a) are kept at the well site or field facility site, as a) soient conservés sur le chantier du puits ou de the case may be; and l’installation de champ, selon le cas; (b) are available for examination at the site at the b) soient disponibles pour fins d’examen sur request of any personnel at that site. place, à la demande du personnel sur le chantier. PART 1 (PARTIE 1) PART 1 PARTIE 1 LICENCES AND APPROVALS (LICENCES ET AUTORISATIONS) LICENCES AND APPROVALS LICENCES ET AUTORISATIONS 5. Drilling operations and well operations (Travaux de forage et exploitation de puits) 5. Drilling operations and well operations 5. Travaux de forage et exploitation de puits (1) A Well Licence is authority for the drilling (1) Une licence de puits constitue l’autorisation operation for the well. nécessaire pour les travaux de forage dans un puits. (2) Subject to these Regulations, the licensee of a well (2) Sous réserve du présent règlement, le titulaire shall not perform any of the following operations in d’une licence de puits ne doit entreprendre aucun des respect of the well unless the licensee has obtained a travaux suivants afférents à un puits à moins d’avoir Well Operation Approval from the Chief Operations obtenu au préalable, du délégué aux opérations, une Officer in respect of that operation autorisation d’exploitation de puits portant sur ces travaux: (a) completion; a) l’achèvement; (b) re-completion; b) la remise en production; (c) change of service; c) le changement de service; (d) workover; d) le reconditionnement; (e) suspension; e) l’abandon provisoire; (f) abandonment; f) l’abandon définitif; (g) re-abandonment. g) le réabandon. 6. Application and issuance (Demande et délivrance) 6. Application and issuance 6. Demande et délivrance (1) An application for a Well Licence, Well Operation (1) Toute demande de licence de puits, d’autorisation Approval, Field Facility Licence or Scheme Approval d’exploitation d’un puits, de licence d’installation de shall be prepared and submitted in accordance with the champ ou d’approbation de plan doit être préparée et directions of the Chief Operations Officer. présentée en conformité avec les directives du délégué aux opérations. (2) Information contained in the Well Licence (2) Les renseignements que contient la demande de application for the purposes of the drilling operation for licence de puits en vue des travaux de forage dans un the well may include the documentation necessary to puits peuvent comprendre la documentation nécessaire obtain a Well Operation Approval for any subsequent à l’obtention d’une autorisation d’exploitation d’un well operation in respect of the well. puits pour tous travaux subséquents relatifs à ce puits. Page 12 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 7. Article 7. (3) When a condition of a Well Licence, Well Operation (3) Lorsqu’une condition d’une licence de puits, d’une Approval, Field Facility Licence or Scheme Approval autorisation d’exploitation d’un puits, d’une licence incorporates by reference any provisions of the d’installation de champ ou d’un approbation de plan application for the Licence or Approval or of any other renvoit à une disposition de la demande de licence, document, those provisions are considered to be d’autorisation ou d’approbation ou à tout autre contained in the Licence or Approval for the purposes document, cette disposition est considérée comme of these Regulations. faisant partie de la licence ou de l’autorisation ou de l’approbation pour les besoins du présent règlement. (4) A Well Licence, Well Operation Approval or Field (4) La licence de puits, l’autorisation d’exploitation Facility Licence shall be issued by the Chief Operations d’un puits et la licence d’installation de champ sont Officer. délivrées par le délégué aux opérations. 7. Separate well operations (Travaux distincts dans un puits) 7. Separate well operations 7. Travaux distincts dans un puits A licensee of a well may, without obtaining a Well Un titulaire de licence de puits peut, sans obtenir une Operation Approval, conduct a wireline test or coiled autorisation d’exploitation de puits, mener des essais tubing operation in respect of the well through a au câble ou des travaux au tube d’intervention enroulé christmas tree if dans un puits par le biais de la tête d’éruption si : (a) the operation does not a) les travaux n’ont pas comme effet ou résultat : (i) alter the completion interval, (i) de modifier l’intervalle d’achèvement, (ii) adversely affect recovery, (ii) de porter atteinte à la récupération, (iii) result in damage to the completion (iii) d’endommager le matériel d’achèvement ou equipment or pressure retaining barriers, or les barrières de rétention de la pression, (iv) result in the drilling of a new well; and (iv) d’exiger le forage d’un nouveau puits, (b) the requirements respecting the equipment, b) les exigences concernant le matériel, les operating procedures and qualifications of the procédures d’exploitation et les compétences personnel conducting the operation have been du personnel menant les travaux ont déjà été provided for in a previous Well Operation stipulées antérieurement dans une autorisation Approval for the well. d’exploitation pour ce puits. 8. Well deposit (Dépôt exigible pour un puits) 8. Well deposit 8. Dépôt exigible pour un puits (1) When an application for a Well Licence is received (1) Lorsque le délégué aux opérations reçoit une by the Chief Operations Officer, the Minister shall, for demande de licence de puits, le ministre doit, afin de the purposes of determining the amount of the initial déterminer le montant initial du dépôt exigible pour ce deposit required under subsection 90(1) of the Act in puits en vertu du paragraphe 90(1) de la Loi, estimer le respect of the well, estimate the amount that would be montant des frais qui seraient engagés si le puits incurred if the well were to be abandoned as soon as devait être abandonné dès que possible suivant la practicable after drilling operations ceased and before cessation des travaux de forage et avant le retrait de the rig that drilled the well was removed from the well l’appareil de forage du chantier. site. (2) A well deposit shall consist of money unless the (2) Le dépôt exigible pour un puits consiste en une Minister consents to accept another form of security as somme d’argent comptant à moins que le ministre ne a well deposit. consente à accepter que le dépôt soit sous une autre forme de garantie. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 13 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 8. Article 8. (3) A well deposit held by the Government and (3) Le montant du dépôt exigible pour un puits que le consisting of money shall be held in a trust account for gouvernement détient en argent doit être maintenu that purpose. dans un compte en fiducie prévu à cette fin. (4) The Chief Operations Officer may direct in a (4) Le délégué aux opérations peut donner la directive, particular case that the initial deposit may be furnished selon le cas, que le dépôt initial lui soit fourni en in instalments and may specify the due dates for the versements et peut préciser la date d’échéance de ces instalments. versements. (5) If a Well Licence is issued in respect of a well and (5) Si une licence de puits est délivrée et que le puits the well is not abandoned before the rig release date en question est abandonné avant la date de retrait de for the rig that drilled the well, the Minister shall, as l’appareil de forage, le ministre doit, dès que possible soon as practicable after the rig release date, review suivant la date de retrait de l’appareil de forage, the amount of the initial well deposit pursuant to réexaminer le montant initial du dépôt exigible pour le subsection 90(3) of the Act. puits en application du paragraphe 90(3) de la Loi. (6) If the licensee defaults in the furnishing of an (6) Si le titulaire de licence fait défaut d’un versement instalment of a well deposit or an additional deposit ou du dépôt exigible pour un puits, ou encore, d’un required under subsection 90(3) of the Act, and the dépôt supplémentaire exigé en vertu du default continues for at least 30 days after the due date paragraphe 90(3) de la Loi, et qu’il est toujours en for furnishing it, the Chief Operations Officer may défaut 30 jours suivant la date d’échéance fixée pour le versement ou le dépôt, le délégué aux opérations peut soit: (a) suspend any existing Well Operation Approval a) suspendre l’autorisation d’exploitation d’un issued in respect of the licensed well and give puits délivrée pour le puits faisant l’objet d’une any directions to the licensee in connection licence et donner au titulaire de licence, des with the well operations covered by the directives concernant les travaux dont traitait Approval when the suspension becomes l’autorisation lorsque la suspension a pris effet; effective; or (b) refuse to issue a Well Operation Approval in b) refuser de délivrer une autorisation respect of any proposed well operation relating d’exploitation d’un puits à l’égard de tous to that well or to any other well the Well travaux proposés relatifs à ce puits ou à tout Licence for which is held by the same licensee. autre puits pour lequel le même titulaire détient une licence. (7) When a well deposit is held by the Government and (7) Lorsque le gouvernement détient un dépôt exigible the Government is entitled to recover abandonment pour un puits et que le gouvernement a droit de costs or re-abandonment costs from the deposit recouvrer les frais d’abandon ou de réabandon sur ce pursuant to paragraph 93(1)(a) of the Act, the dépôt en vertu de l’alinéa 93(1)a) de la Loi, il peut abandonment costs may be recovered in accordance recouvrer les frais d’abandon conformément aux règles with the following suivantes : (a) the Minister shall direct that the well deposit is a) le ministre doit donner la directive que le dépôt forfeited to the Government to the extent of the exigible pour ce puits est confisqué au profit du abandonment costs or re-abandonment costs, gouvernement jusqu’à concurrence du montant as the case may be, incurred by the des frais d’abandon ou de réabandon, selon le Government; cas, que le gouvernement a engagés; Page 14 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 9. Article 9. (b) in the case of a well deposit consisting of b) s’il s’agit d’un dépôt en argent comptant, un money, an amount equal to the forfeited montant égal au montant confisqué doit être amount shall be transferred from the trust transféré du compte en fiducie au Trésor du account to the Yukon Consolidated Revenue Yukon; Fund; (c) in the case of a well deposit consisting of some c) s’il s’agit d’un dépôt sous une autre forme de other form of security, the Minister shall take garantie, le ministre doit prendre les mesures any steps necessary, including judicial nécessaires, y inclus des procédures judiciaires, proceedings, to realize on the security to the pour convertir la garantie jusqu’à concurrence extent of the forfeited amount. du montant confisqué. (8) A well deposit held by the Government shall be (8) À moins que le dépôt exigible pour un puits ait été returned or refunded when confisqué par le gouvernement en application du paragraphe (7), le gouvernement doit restituer ou rembourser un dépôt qu’il détient lorsque: (a) the well is abandoned in accordance with these a) le puits est abandonné conformément aux Regulations to the satisfaction of the Chief dispositions du présent règlement, à la Operations Officer; or satisfaction du délégué aux opérations; (b) a transfer of the Well Licence for the well is b) un transfert de licence de puits pour ce puits registered under the Oil and Gas Licence est enregistré sous le régime du Règlement sur Administration Regulations and a new well l’administration des licences de pétrole et de deposit is furnished in respect of the well by gaz et le destinataire du transfert fournit un the transferee, nouveau dépôt exigible pour le puits. except to the extent that the well deposit has been forfeited to the Government pursuant to subsection (7). (9) A well deposit or the remainder of a well deposit, (9) La totalité ou une partie du dépôt, selon le cas, doit as the case may be, shall be returned or refunded être restituée ou remboursée en application du under subsection (8) to the person who originally paragraphe (8), à la personne qui a fourni le dépôt à furnished the deposit unless that person directs the l’origine, à moins que celle-ci donne une directive au Minister to return or refund it to some other person. ministre de la restituer ou de la rembourser à une autre partie. 9. Conditions of Well Licence or Approval (Conditions d’une licence de puits ou d’une autorisation) 9. Conditions of Well Licence or Approval 9. Conditions d’une licence de puits ou d’une autorisation (1) A Well Licence is subject to the following (1) Les conditions suivantes s’appliquent à une licence conditions de puits: (a) it expires three years after its date of issue a) elle expire trois ans après sa date de délivrance unless, before the end of that period, the à moins que le titulaire de licence n’ait licensee has begun the drilling of the well to entrepris, avant la fin de ce délai, les travaux which the Well Licence relates; de forage du puits qui en fait l’objet; (b) the contractor and equipment identified in the b) l’entrepreneur nommé et le matériel identifié application for the Well Licence must be used in dans la demande de licence doivent être utilisés the drilling operation; pour les travaux de forage; (c) the licensee must conduct the drilling operation c) le titulaire de licence doit mener les travaux de as proposed in the application for the Well forage tel que stipulé dans la demande de Licence and in accordance with any conditions licence et conformément à toutes conditions c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 15 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 10. Article 10. imposed by the Chief Operations Officer in établies par le délégué aux opérations pour la relation to the Licence and any directions of the licence, et toutes directives de celui-ci; Chief Operations Officer; (d) a copy of the Well Licence must be posted on d) une copie de la licence de puits doit être the drilling rig; and affichée sur l’appareil de forage; (e) the well deposit referred to in section 8 must e) le dépôt exigible pour le puits mentionné à be in place. l’article 8 doit être versé. (2) The Chief Operations Officer may shorten or extend (2) Le délégué aux opérations peut abréger ou the three-year period referred to in paragraph (1)(a) in prolonger le délai d’échéance mentionné à l’alinéa (1)a) respect of any Well Licence. pour toute licence de puits. (3) A Well Operation Approval is subject to the (3) Les conditions suivantes s’appliquent à une following conditions autorisation d’exploitation d’un puits: (a) the licensee must begin the well operation a) le titulaire de licence doit entreprendre within 120 days after the day on which the Well l’exploitation du puits dans les 120 jours de la Operation Approval is granted; date de délivrance de l’autorisation; (b) the contractor and equipment identified in the b) l’entrepreneur nommé et le matériel identifié application for the Well Operation Approval dans la demande d’autorisation doivent être must be used in the operation; utilisés pour les travaux relatifs au puits;
Part document.segment-3
Oil and Gas Drilling and Production Regulations — segment 3
- document.segment-3 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 3
AI-assisted research summary: This part sets operating rules for well and field-facility licensees, including approvals, notices, survey filings, timing limits, and compliance with directions from the Chief Operations Officer.
(c) the licensee must conduct the well operation in c) le titulaire de licence doit mener les travaux accordance with the Well Operation Approval, d’exploitation du puits tel que stipulés dans la any conditions imposed by the Chief Operations demande d’autorisation et conformément à Officer in relation to the Approval and any toutes conditions établies par le délégué aux directions of the Chief Operations Officer; opérations pour l’autorisation, et toutes directives de celui-ci; (d) a copy of the Well Operations Approval must be d) une copie de l’autorisation d’exploitation du posted on the drilling rig or at the licensee’s puits doit être affichée sur l’appareil de forage field office; and ou dans le bureau de chantier du titulaire de licence; (e) the well deposit referred to in section 8 must e) le dépôt exigible pour le puits mentionné à be in place. l’article 8 doit être versé. 10. Amendments (Modifications) 10. Amendments 10. Modifications (1) An application for an amendment to a Well (1) Toute demande de modification d’une licence de Licence, Well Operation Approval, Scheme Approval or puits, d’une autorisation d’exploitation d’un puits, Field Facility Licence must be made at least 15 days d’une licence d’installation de champ ou d’un document prior to the effective date of the proposed amendment. d’approbation de plan, se fait au moins quinze jours avant la prise d’effet de la modification proposée. (2) The licensee shall apply to the Chief Operations (2) Le titulaire de licence doit faire la demande auprès Officer for an amendment to the relevant Field Facility du délégué aux opérations, pour toute modification de Licence or Licences that relate to a pool or field when la licence ou des licences d’installation de champ visant le gisement ou le champ dans les cas suivants : (a) the licensee proposes to a) lorsqu’il souhaite : Page 16 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 11. Article 11. (i) make significant changes in the nature or (i) modifier de façon considérable la nature ou timing of development activities of the pool le calendrier des travaux de développement or field, visant le gisement ou le champ, (ii) make modifications or additions to existing (ii) effectuer des modifications ou des ajouts field facilities at the pool or field, or importants aux installations existantes du gisement ou du champ, (iii) initiate a scheme for a pool or field or make (iii) établir un plan pour un gisement ou un a significant change in a scheme for the pool champ ou modifier de façon considérable un or field that is the subject of a Scheme plan pour un gisement ou un champ ayant Approval; fait l’objet d’une approbation de plan; (b) pool performance or new geological b) lorsque le rendement d’un gisement ou de information shows that the recovery method nouveaux renseignements géologiques needs to be changed to achieve maximum démontrent la nécessité d’utiliser une autre recovery of oil or gas reserves from the pool or méthode de récupération pour arriver à field; or récupérer la plus grande part possible des réserves de pétrole et de gaz contenues dans ce gisement ou ce champ; (c) increased ultimate recovery of oil or gas would c) lorsque le recours à une nouvelle technologie be economically obtainable by adopting new ou à de nouvelles méthodes permettrait technology or methodology. d’accroître la récupération totale de pétrole et de gaz, à un coût avantageux. 11. Suspension or termination of operation (Abandon provisoire ou cessation des travaux) 11. Suspension or termination of operation 11. Abandon provisoire ou cessation des travaux (1) The Chief Operations Officer may by a notice (1) Le délégué aux opérations, par arrêté, peut order the licensee of a well or field facility to suspend ordonner à un titulaire de licence de puits ou or terminate the drilling of the well, a well operation or d’installation de champ, d’abandonner provisoirement production operation in respect of the well or the ou de cesser le forage du puits, son exploitation ou les operation of the field facility, as the case may be, if the activités de production y reliées, ou l’exploitation d’une Chief Operations Officer is satisfied that installation de champ, si le délégué aux opérations est d’avis que : (a) the licensee has not complied with a) le titulaire de licence ne s’est pas conformé : (i) any law relating to the environment that (i) aux dispositions de toute loi afférente à applies to the operation, or l’environnement qui s’applique à ces travaux, (ii) an obligation of the licensee under the Well (ii) à une obligation qu’a le titulaire de licence Licence, Well Operation Approval or Field en vertu de la licence de puits, de Facility Licence, as the case may be; l’autorisation d’exploitation du puits ou de la licence d’installation de champ, selon le cas; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 17 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 1 PARTIE 1 Section 12. Article 12. (b) the licensee has failed to comply with a b) le titulaire de licence a omis de se conformer à requirement for the submission of any une exigence pour la remise d’un document ou document or information required to be d’un renseignement exigible par le ministre ou submitted to the Minister or Chief Operations le délégué aux opérations en vertu du présent Officer under these Regulations and the failure règlement et que l’omission s’est poursuivie to comply has continued for at least 30 days pendant plus de 30 jours suivant la date à after the date on which the licensee was laquelle le titulaire de licence a reçu un avis à notified by the Chief Operations Officer of the cet effet du délégué aux opérations; non-compliance; (c) the licensee has ceased to be eligible to hold a c) le titulaire de licence a cessé d’être admissible licence; à détenir une licence; (d) in the case of a well licensee, the level of d) lorsqu’il s’agit d’un titulaire de licence de puits, performance of the rig, its crew or its service le rendement de l’appareil ou de l’équipe de or ancillary equipment is less than the level of forage, ou de l’équipement de service ou performance indicated in the conditions of the auxiliaire est nettement inférieur au niveau Well Licence or the Well Operation Approval or indiqué dans les conditions de délivrance de la the directions of the Chief Operations Officer; licence de puits ou de l’autorisation or d’exploitation du puits, ou encore dans les directives données par le délégué aux opérations; (e) the environmental conditions, including ice e) les conditions environnementales, y inclus les conditions, meteorological conditions and other conditions de glace, les conditions natural conditions encountered in the area of météorologiques et toutes autres conditions the activity for which the Well Licence or the naturelles sont plus difficiles ou plus Well Operation Approval or Field Facility Licence contraignantes que celles prévues par le was granted, are more severe than those titulaire de la licence pour la zone d’activité predicted by the licensee. visée par la licence de puits ou la demande d’autorisation d’exploitation du puits. (2) The Chief Operations Officer may revoke an order (2) Le délégué aux opérations peut révoquer l’arrêté under subsection (1) and permit the resumption of the pris en vertu du paragraphe (1) et permettre la reprise operation concerned on being satisfied that the des travaux en question s’il est d’avis que les motifs grounds on which the order was made no longer exist pour lesquels il avait pris l’arrêté n’existent plus ou que or that the failure of compliance has been remedied. le titulaire de licence a remédié à son omission de se conformer. (3) A licensee to whom an order is given under (3) Le titulaire de licence doit se conformer à l’arrêté subsection (1) shall comply with the order. pris en vertu du paragraphe (1). 12. Timing of application (Délais) 12. Timing of application 12. Délais An application for a Well Licence, Well Operation La demande de licence de puits, d’autorisation Approval, Scheme Approval or Field Facility Licence d’exploitation d’un puits, de licence d’installation de must be submitted to the Chief Operations Officer not champ ou d’approbation de plan doit être présentée au less than 30 days before the planned start date of the délégué aux opérations au moins 30 jours avant la date drilling operation, well operation, scheme or work prévue pour le début du forage oude l’exploitation du related to a field facility, as the case may be. puits, ou de la mise en oeuvre du plan ou des travaux reliés à l’installation de champ. Page 18 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 2 PARTIE 2 Section 13. Article 13. PART 2 (PARTIE 2) PART 2 PARTIE 2 WELLS (PUITS) WELLS PUITS 13. Notices respecting operations (Avis de travaux) 13. Notices respecting operations 13. Avis de travaux (1) When a drilling operation or well operation must (1) Lorsqu’un titulaire de licence doit entreprendre de be carried out urgently to avoid losing control, or to façon urgente, des travaux de forage ou l’exploitation regain control, of a well, the licensee of the well d’un puits afin d’en conserver ou d’en reprendre le contrôle, il: (a) is exempt from the requirement to obtain a a) est exempté de l’exigence d’obtenir une licence Well Licence or Well Operation Approval for the de puits ou une autorisation d’exploitation d’un operation; puits pour ces travaux; (b) shall notify the Minister of the operation before b) doit en aviser le ministre avant ou dès le début or immediately after its beginning; and des travaux; (c) shall prepare a report describing the operation c) doit remettre un rapport au ministre décrivant and submit it to the Minister before the end of les travaux de forage ou d’exploitation the day following the day on which the exécutés, avant la fin de la journée suivant celle operation was completed. où les travaux ont été complétés. (2) When the licensee of a well determines that a (2) Lorsque le titulaire d’une licence de puits décide drilling operation or well operation cannot be carried qu’en raison de conditions n’ayant pas été prévues par out in accordance with the Well Licence or Well lui au moment où il a demandé la licence ou Operation Approval owing to the existence of conditions l’autorisation d’exploitation du puits, les travaux de not anticipated by the licensee at the time the forage ou d’exploitation du puits ne peuvent être application was submitted for approval, the licensee exécutés en conformité avec la licence délivrée ou l’autorisation accordée, il droit prendre les mesures suivants : (a) shall notify the Minister immediately of the a) aviser le ministre, dans les plus brefs délais, de licensee’s determination and the reason for it; sa décision; (b) subject to any directions given by the Chief b) laisser le puits dans un état aussi sûr que Operations Officer, shall leave the well in as possible, sous réserve de toutes directives du secure a condition as is practicable; and délégué aux opérations; (c) must not resume the operation until the Chief c) ne pas reprendre les travaux de forage ou Operations Officer so approves or, if the d’exploitation du puits avant d’en avoir obtenu Licence or Approval needs to be amended l’autorisation du délégué aux opérations ou, si before the resumption of the operation, until la licence ou l’autorisation doit être modifiée the amendment is approved. avant la reprise des travaux, il ne doit pas les reprendre avant d’avoir obtenu l’approbation pour cette modification. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 19 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 2 PARTIE 2 Section 14. Article 14. 14. Well, pool and field identification (Désignation des puits, des gisements et des champs) 14. Well, pool and field identification 14. Désignation des puits, des gisements et des champs (1) The Chief Operations Officer may, in accordance (1) Le délégué aux opérations peut, conformément au with these Regulations, assign a name to a well. présent règlement, attribuer une désignation à un puits. (2) The length of a well name must not exceed 50 (2) La désignation d’un puits ne peut contenir plus characters and spaces. de 50 caractères et espaces. (3) A well name must clearly identify by name or (3) La désignation d’un puits doit permettre de repérer approved abbreviation, or by number or letter, clairement par son nom ou par une abréviation approuvée, ou encore par des lettres ou des chiffres : (a) the licensee; a) le titulaire de la licence; (b) the field name, if the well is within a b) la désignation du champ si le puits se trouve designated field; and dans un champ désigné; (c) the site of the well by unit, section and grid c) le chantier du puits par unité, section et area, in that order, indicated by letters and superficie en quadrillage, indiqués dans cet numbers separated by hyphens. ordre précis, par des lettres et des chiffres séparés par des traits d’union. (4) A well name must not include any code numbers or (4) La désignation du puits ne doit comprendre ni any punctuation marks except the hyphens used in the numéros de code ni signes de ponctuation, à numerical portion of the name referred to in l’exception des traits d’union insérés dans la partie paragraph (3)(c). numérique de la désignation visée à l’alinéa (3)c). (5) In addition to the particulars required in (5) En plus de satisfaire aux exigences particulières subsection (3), a well name may contain any other énoncées au paragraphe (3), la désignation d’un puits particulars agreed on by the applicant and the Chief peut comprendre d’autres précisions sur lesquelles Operations Officer. s’entendent le demandeur et le délégué aux opérations. (6) The Chief Operations Officer shall assign a name (6) Le délégué aux opérations doit attribuer un nom à for a designated pool or field. un gisement ou un champ désigné. (7) The licensee of a well (7) Les conditions suivantes s’appliquent au titulaire d’une licence de puits : (a) may submit an application to the Chief a) il peut présenter au délégué aux opérations, Operations Officer for a change to the name of une demande de modification de la désignation the well or the name of the pool or field in d’un puits, d’un gisement ou d’un champ; which the well is situated; and (b) shall notify the Minister of every change in the b) il doit aviser le ministre de tout changement de status of the well within 14 days after the statut d’un puits pouvant modifier la change occurs, if the change may affect the désignation du gisement ou du champ dans designation of the pool or field in which the lequel le puits est situé, dans les 14 jours du well is situated. changement de statut du puits. (8) The Chief Operations Officer shall designate a sour (8) Le délégué aux opérations doit indiquer dans la well as a critical sour well or a non-critical sour well in licence de puits, s’il sagit d’un puits corrosif critique ou the Well Licence. non-critique. Page 20 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 2 PARTIE 2 Section 15. Article 15. 15. Unique well identifiers (Identificateurs uniques de puits) 15. Unique well identifiers 15. Identificateurs uniques de puits (1) The Chief Operations Officer may assign a unique (1) Le délégué aux opérations peut attribuer un identifying number to identificateur unique à l’un des suivants: (a) a well; a) à un puits; (b) a part of a well completed in a pool, when the b) à la partie d’un puits qui est achevée dans un well is completed in more than one pool; or gisement, lorsque le puits est achevé pour plusieurs gisements; (c) two or more parts of a well, when the well is c) à deux parties ou plus d’un puits achevé pour completed in more than one pool. plusieurs gisements. (2) Unique identifying numbers assigned under (2) Les identificateurs uniques attribués en vertu du subsection (1) shall be determined in accordance with paragraphe (1) doivent être déterminés selon les the directions of the Chief Operations Officer. directives du délégué aux opérations. 16. Well classifications (Classification des puits) 16. Well classifications 16. Classification des puits (1) In this section, “designated pool” includes a pool (1) Dans le présent article, « gisement désigné » in the process of being designated but temporarily comprend un gisement en voie d’être désigné mais undisclosed by the Chief Operations Officer for reasons demeurant provisoirement non divulgué par le délégué of confidentiality or administration. aux opérations pour des raisons administratives ou de confidentialité. (2) The Chief Operations Officer may (2) Le délégué aux opérations peut: (a) determine the classification of wells or portions a) déterminer la classification de puits ou de of wells in accordance with this section; and parties de puits en conformité avec le présent article; (b) in cases of dispute, determine the status of a b) en cas de conflit, déterminer le statut d’un well or a portion of a well. puits ou d’une partie de ce puits. (3) A well or portion of a well may be classified as a (3) Au moment de la délivrance de la licence de puits, development well at the time the Well Licence is issued un puits peut être classifié comme étant un puits de when it is located in a spacing area that is in or développement, ou une partie de celui-ci peut l’être, si contiguous to a designated pool in the same geological ce puits est foré dans une unité d’espacement située formation. dans un gisement désigné provenant de la même formation géologique, ou qui y est contiguë. (4) A well or portion of a well may be classified as an (4) Au moment de la délivrance de la licence de puits, exploratory outpost well at the time the Well Licence is un puits peut être classifié comme étant un puits de issued when it is located at a distance greater than one sondage d’extension, ou une partie de celui-ci peut spacing area and less than 7 km from a designated l’être, si la distance séparant le puits foré d’un pool. gisement désigné est supérieure à la superficie d’une unité d’espacement mais inférieure à sept kilomètres. (5) A well may be classified as an exploratory wildcat (5) Au moment de la délivrance de la licence de puits, well at the time the Well Licence is issued when it is un puits peut être classifié commen étant un puits de located not nearer than 7 km to a designated pool. reconnaissance, si le puits foré est situé à une distance de plus de sept kilomètres d’un gisement désigné. (6) When a well has been drilled and the final report (6) Lorsqu’un puits a été foré et que les rapports for the well has been submitted to the Minister exigibles sont transmis au ministre en application de pursuant to section 188, a well or portion of the well l’article 188, le puits peut être reclassifié comme étant c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 21 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 2 PARTIE 2 Section 17. Article 17. may, upon application by the licensee, be reclassified un puits de reconnaissance, ou une partie de celui-ci as an exploratory wildcat well if, in the opinion of the peut l’être, à la demande du titulaire de licence, si, de Chief Operations Officer, the drilling resulted in the l’avis du délégué aux opérations, le forage a entraîné la discovery of a new pool. découverte d’un nouveau gisement. (7) When two or more wells or portions of two or more (7) Lorsque deux puits ou plus, ou deux parties de wells are within 7 km of one another and any one of puits ou plus se trouvent à moins de sept kilomètres the wells or well portions has been classified as an l’un de l’autre, et que l’un de ces puits ou l’une des exploratory wildcat well at the time of the issuance of parties de ces puits a été classifié comme étant un the respective Well Licences, the first well that, in the puits de reconnaissance au moment de la délivrance opinion of the Chief Operations Officer, results in the des licences respectivement délivrées pour ces puits, le discovery of a new pool shall be classified as an premier puits qui, de l’avis du délégué aux opérations, exploratory wildcat well and the other well or wells may entraîne la découverte d’un nouveau gisement est be reclassified. classifié puits de reconnaissance et les autres puits peuvent être reclassifiés. 17. Surveys for wells (Arpentage) 17. Surveys for wells 17. Arpentage (1) A legal survey must be used to confirm the (1) L’endroit où se trouve chacun des puits à la surface location of every well. surface du sol doit être confirmé par un arpentage officiel. (2) A legal survey that confirms the surface location of (2) L’arpentage effectué conformément au a deviated or horizontal well must include the proposed paragraphe (1) pour un puits horizontal ou un puits bottomhole co-ordinates. dévié doit préciser les coordonnées proposées du fond de trou. (3) Before the well is drilled, the licensee shall prepare (3) Avant qu’un puits ne soit foré, le titulaire de licence a preliminary survey plan showing the surface location doit produire un plan d’arpentage préliminaire of the proposed well. démontrant l’endroit où se trouve le puits proposé à la surface du sol. (4) When there is a group of wells in close proximity, (4) Lorsque des puits sont groupés à proximité les uns the Chief Operations Officer may approve the use of a des autres, le délégué aux opérations peut autoriser single legal survey relating to all the wells in the group. l’usage d’un seul arpentage officiel portant sur le groupe de puits au complet. (5) The licensee shall submit to the Minister a final (5) Le titulaire de licence doit remettre au ministre, plan of survey for the surface location for the well dans les quatre semaines qui suivent la date de retrait within four weeks after the rig release date. de l’appareil de forage, un plan d’arpentage final démontrant l’endroit où se situe le puits à la surface du sol. 18. Spacing, target areas and off-target penalties for oil wells (Unités d’espacement, zones cibles et pénalités pour puits de gaz hors zone) 18. Spacing, target areas and off-target 18. Unités d’espacement, zones cibles et penalties for oil wells pénalités pour puits de pétrole hors zone (1) The normal spacing area for an oil well is four (1) L’unité d’espacement régulière d’un puits de units in the form of a square with one corner being the pétrole correspond à quatre unités juxtaposées en centre of the section in which the units are situated. forme de carré de telle sorte que l’un de leurs coins se trouve au centre de la section dans laquelle les unités sont situées. Page 22 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 2 PARTIE 2 Section 19. Article 19. (2) The target area for an oil well in a normal spacing (2) Dans le cas d’un puits de pétrole foré dans une area at any depth is the area inside but not nearer unité d’espacement régulière, la zone cible est than 100 metres to the sides of the spacing area. délimitée, sans égard à la profondeur, par la surface située à l’intérieur de l’unité d’espacement mais à au moins cent mètres de chaque côté de cette dernière. (3) If the boundary of an oil and gas rights location (3) Si la limite de l’emplacement des droits pétroliers does not coincide with the side of a normal oil well et gaziers ne coïncide pas avec le côté d’une unité spacing area, the oil well target area must have sides d’espacement régulière d’un puits de pétrole, les côtés not nearer than 100 metres to the boundary. de la zone cible du puits de pétrole ne peuvent se trouver à moins de cent mètres de cette limite. (4) In the case of an oil and gas rights location (4) Dans le cas d’un emplacement de droits pétroliers containing more than one normal spacing area, one oil et gaziers constitué de plusieurs unités d’espacement well may be completed in each of those normal spacing régulières, un puits de pétrole peut être achevé dans areas and subsection (5) does not apply to such a well chacune de ces unités d’espacement régulière sans être if each of those wells is situated not nearer than 100 visé par le paragraphe (5), si chacun de ces puits forés metres to the boundary of the oil and gas rights se trouve à au moins cent mètres de la limite de cet location. emplacement. (5) The UDOA of an oil well completed outside of the (5) La PQAPAA d’un puits de pétrole achevé à target area is subject to an off-target penalty factor l’extérieur de la zone cible est assujettie à un equal to 12 times the product of the shortest distances coefficient de pénalité pour zone hors cible from the uppermost point of intersection of the well- correspondant à douze fois le produit de la plus courte bore with the productive zone to the two nearest sides distance séparant le point d’intersection le plus élevé of the normal spacing area, divided by the area of the du trou de sonde avec la zone productive et les deux spacing area. côtés les plus rapprochés de l’unité d’espacement régulière, divisé par la superficie de l’unité d’espacement. (6) The Chief Operations Officer may exempt an oil (6) Le délégué aux opérations peut exempter un puits well from any or all of the provisions of subsections (2) de pétrole de l’application d’une partie ou de la totalité to (5). des dispositions énoncées aux paragraphes (2) à (5). (7) Subsection (5) does not apply to the discovery well (7) Le paragraphe (5) ne s’applique pas au puits de of an oil pool. découverte d’un gisement de pétrole. 19. Spacing, target areas and off-target penalties for gas wells (Unités d’espacement, zones cibles et pénalités pour puits de gaz hors zone) 19. Spacing, target areas and off-target 19. Unités d’espacement, zones cibles et penalties for gas wells pénalités pour puits de gaz hors zone (1) The normal spacing area for a gas well is a (1) L’unité d’espacement régulière d’un puits de gaz section. correspond à une section. (2) The target area for a gas well in a normal spacing (2) Dans le cas d’un puits de gaz foré dans une unité area at any depth is the area inside but not nearer d’espacement régulière, la zone cible est délimitée, than 250 metres to the sides of the spacing area. sans égard à la profondeur, par la surface située à l’intérieur de l’unité d’espacement mais à au moins 250 m de chaque côté de cette dernière. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 23 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 2 PARTIE 2 Section 20. Article 20. (3) If the boundary of an oil and gas rights location (3) Si la limite de l’emplacement des droits pétroliers does not coincide with the side of a normal gas well et gaziers ne coïncide pas avec le côté d’une unité spacing area, the gas well target area shall be the d’espacement régulière d’un puits de gaz, la zone cible target area of a normal spacing area or a special doit correspondre à la zone cible d’une unité spacing area specified under section 21. d’espacement régulière ou d’une unité d’espacement spéciale délimitée conformément à l’article 21. (4) In the case of an oil and gas rights location (4) Dans le cas d’un emplacement de droits pétroliers containing more than one normal spacing area, one et gaziers constitué de plusieurs zones d’espacement gas well may be completed in each normal spacing régulières, un puits de gaz peut être achevé dans area and subsection (5) does not apply to such a well, if chaque unité d’espacement régulière sans être visé par the well is situated not nearer than 250 metres to the le paragraphe (5), si chacun des puits forés se trouve à boundary of the oil and gas rights location. au moins 250 mètres de la limite de cet emplacement. (5) The UDGA of a gas well completed outside of the (5) La PQAGAA d’un puits de gaz achevé à l’extérieur gas well target area is subject to an off-target penalty de la zone cible du puits de gaz est assujettie à un equal to eight times the product of the shortest coefficient de pénalité pour zone hors cible distance from the uppermost point of intersection of correspondant à huit fois le produit de la plus courte the well-bore with the productive zone to the two distance séparant le point d’intersection le plus élevé nearest sides of the normal spacing area, divided by du trou de sonde avec la zone productive et les deux the area of the spacing area. côtés les plus rapprochés de l’unité d’espacement régulière, divisé par la superficie de l’unité d’espacement. (6) The Chief Operations Officer may exempt a gas (6) Le délégué aux opérations peut exempter un puits well from any or all of the provisions of subsections (2) de gaz de l’application d’une partie ou de la totalité des to (5). dispositions énoncées aux paragraphes (2) à (5). (7) Subsection (5) does not apply to the discovery well (7) Le paragraphe (5) ne s’applique pas au puits de of a gas pool. découverte d’un gisement de gaz. 20. Multi-zone spacing (Espacement des puits traversant plusieurs couches productives) 20. Multi-zone spacing 20. Espacement des puits traversant plusieurs couches productives If there is more than one productive zone in a pool, the Si un gisement renferme plusieurs couches Chief Operations Officer may consider the productive productives, le délégué aux opérations peut, pour les zones separately for the purpose of well spacing. besoins d’espacement de puits, considérer séparément chacune des zones productives. 21. Special spacing areas (Espacement spécial) 21. Special spacing areas 21. Espacement spécial (1) Subject to this section, the Chief Operations (1) Sous réserve du présent article, le délégué aux Officer, on application made in accordance with the opérations, sur demande faite selon ses directives, peut Chief Operations Officer’s directions, may by order par arrêté, prescrire des unités d’espacement spéciales specify special spacing areas for a pool or portion of a pour un gisement ou une partie d’un gisement, qui se pool that differ from normal spacing areas in size, distinguent des unités d’espacement régulières par leur shape or target area. grandeur, leur forme ou leur zone cible. (2) The Chief Operations Officer may, with or without (2) Le délégué aux opérations peut par arrêté, avec ou an application, by order specify special spacing areas sans demande, prescrire des unités d’espacement when the boundary of an oil and gas rights location spéciales lorsque la limite d’un emplacement de droits does not coincide with the sides of a normal spacing pétroliers et gaziers ne coïncide pas avec les côtés area. d’une unité d’espacement régulière. Page 24 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 3 PARTIE 3 Section 22. Article 22. (3) In an order under this section, the Chief Operations (3) Dans un arrêtépris en vertu du présent article, le Officer may also determine the off-target penalty factor délégué aux opérations peut aussi fixer le coefficient de to be used in determining the allowable rates of pénalité pour zone hors cible à être utilisé dans le production, DOAs and DGAs for wells in the special calcul des taux de production autorisés, des PQAP et spacing areas specified in the order. des PQAG pour les puits situés à l’intérieur des unités d’espacement spéciales visées par l’arrêté. (4) The Chief Operations Officer shall not make an (4) Le délégué aux opérations ne doit pas prendre order specifying special spacing areas less than the size d’arrêté prescrivant des unités d’espacement spéciales of normal spacing areas unless the applicant shows à dimensions en deçà de celles d’unités d’espacement that régulières, sauf si le demandeur établit, selon le cas : (a) improved recovery will be obtained; a) que cette modification permettra la récupération d’une plus grande quantité d’hydrocarbures; (b) additional wells are necessary to provide b) qu’il est nécessaire de forer des puits capacity to drain the pool at a reasonable rate additionnels pour obtenir un débit acceptable that will not adversely affect the recovery of the dans ce gisement sans limiter les quantités pool; d’hydrocarbures qui peuvent en être récupérées; (c) the special spacing areas would be in a pool in c) qu’une importante proportion du gisement en a substantial part of which there are special question se trouverait dans des zones spacing areas of reduced size; or d’espacement spéciales de plus petites dimensions; (d) in a gas field, increased deliverability is d) que l’obtention d’un débit soutirable accru est desirable. souhaitable dans le cas d’un champ de gaz. PART 3 (PARTIE 3) PART 3 PARTIE 3 FIELD FACILITIES (INSTALLATIONS DE CHAMP) FIELD FACILITIES INSTALLATIONS DE CHAMP 22. Field facilities designation (Désignation des installations de champ) 22. Field facilities designation 22. Désignation des installations de champ (1) Each of the following is designated as an oil and (1) Pour l’application de la Loi, chacun des éléments gas facility for the purposes of the Act énumérés ci-dessous constitue une installation pétrolifère ou gazéifère : (a) a battery or satellite; a) une batterie ou un satellite; (b) an oil treater; b) un purificateur d’hydrocarbures; (c) a pumping station; c) une station de pompage; (d) a compressor station; d) une station de compression; (e) a dehydrator; e) un déshydrateur; (f) a separator; f) un séparateur; (g) a gas injection station; g) une station d’injection de gaz; (h) a line heater; h) un réchauffeur de conduites; (i) an oilfield waste storage, treatment, processing i) une installation de stockage, de traitement, de or disposal facility; gestion ou d’évacuation des déchets de c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 25 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 3 PARTIE 3 Section 23. Article 23. chantier; (j) a liquified petroleum gas handling facility; j) une installation de traitement de gaz de pétrole liquéfiés; (k) a water injection, storage, treatment or k) une station d’injection, de stockage, de disposal station; traitement, de gestion ou d’évacuation d’eau; (l) a truck terminal; l) un terminal pour camions; (m) an oil or gas field power generating station; m) une centrale électrique d’un champ pétrolier ou gazier; (n) a flare system; n) un dispositif de torches; (o) any other system of vessels and equipment o) tout autre système de récipients et de matériel designed to accommodate the production, servant à assurer la production, l’injection, le injection, storage, treatment or disposal of well stockage, le traitement ou l’élimination des effluent products and by-products; and produits et des sous-produits des effluents de puits; (p) any combination of the facilities enumerated in p) toute combinaison des éléments mentionnés ci- paragraphs (a) to (o). dessus. (2) Field facilities for temporary use during a drilling (2) Le délégué aux opérations peut exempter des operation, well operation or production operation may exigences de l’alinéa 64(1)e) de la Loi, une installation be exempted by the Chief Operations Officer from the de champ de nature temporaire utilisée durant les requirements of paragraph 64(1)(e) of the Act when travaux de forage, l’exploitation d’un puits, ou les information respecting the facility is included in the activités de production, lorsque les renseignements application for the Well Licence or Well Operation relatifs à cette installation sont inclus dans la demande Approval in accordance with the directions of the Chief de licence de puits ou d’autorisation d’exploitation d’un Operations Officer. puits, en conformité avec les directives du délégué aux opérations. 23. Field facility names (Noms des installations de champ) 23. Field facility names 23. Noms des installations de champ (1) The Chief Operations Officer may, in accordance (1) Le délégué aux opérations peut, conformément with this section, assign a name to a field facility. aux dispositions du présent article, attribuer un nom à une installation de champ. (2) The length of a field facility name must not (2) Le nom d’une installation de champ ne peut exceed 50 characters and spaces. contenir plus de 50 caractères, espaces compris. (3) The field facility name must clearly identify by (3) Le nom d’une installation de champ doit permettre name or approved abbreviation, or by number or de repérer clairement par son nom ou par une letter, abréviation approuvée, ou encore par des lettres ou des chiffres : (a) the licensee; a) le titulaire de la licence; (b) the field name if the field facility is within a b) le nom du champ si l’installation de champ se designated field, or an area name approved by trouve dans un champ désigné, ou un nom de the Chief Operations Officer if the field facility zone approuvé par le délégué aux opérations si is outside a designated field; and l’installation de champ se trouve à l’extérieur d’un champ désigné; Page 26 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 3 PARTIE 3 Section 24. Article 24. (c) the site of the field facility by unit, section and c) l’emplacement de l’installation de champ au grid area, in that order, indicated by letters moyen de l’unité, de la section et du and numbers separated by hyphens. quadrillage en superficie, indiqués dans cet ordre précis, par des lettres et des chiffres séparés par des traits d’union. (4) The field facility name must not include any code (4) Le nom de l’installation de champ ne doit numbers or any punctuation marks except the hyphens comprendre ni numéros de code ni signes de used in the numerical portion of the name referred to ponctuation, à l’exception des traits d’union insérés in paragraph (3)(c). dans la partie numérique du nom, visée à l’alinéa (3)c). (5) In addition to the particulars required in (5) En plus de satisfaire aux exigences particulières subsection (3), a field facility name énoncées au paragraphe (3), le nom d’une installation de champ: (a) must describe the facility in terms of one or a) doit décrire l’installation selon l’un ou plusieurs more of the categories enumerated in des éléments énumérés au paragraphe 22(1); subsection 22(1); and (b) may contain any other particulars agreed on by b) peut comprendre d’autres précisions sur the applicant and the Chief Operations Officer. lesquelles sont d’accord le demandeur et le délégué aux opérations. (6) The Chief Operations Officer may assign a code (6) Le délégué aux opérations peut attribuer un number to each type of field facility for the purposes of numéro de code à chaque sorte d’installation de champ the administration of these Regulations or any other pour les besoins d’administration du présent règlement regulations under the Act. ou de tout autre règlement établi en vertu de la Loi. 24. Plan of survey of site (Plan d’arpentage ) 24. Plan of survey of site 24. Plan d’arpentage Before the licensee undertakes the operation of a field Avant d’entreprendre les travaux dans une installation facility, the licensee shall submit to the Chief de champ, le titulaire de licence doit remettre au Operations Officer for approval délégué aux opérations, pour approbation: (a) a plan of survey of the field facility site; and a) un plan d’arpentage pour le chantier de l’installation de champ; (b) independent third party verification of the b) la confirmation indépendante du plan et de la design and construction of the field facility. construction de l’installation de champ par une tierce partie. 25. Abandonment of field facility (Abandon d’une installation de champ) 25. Abandonment of field facility 25. Abandon d’une installation de champ No person shall abandon a field facility otherwise than Nul ne peut abandonner une installation de champ sans in accordance with the Field Facility Licence for the se conformer aux exigences énoncées dans la licence field facility. d’installation de champ délivrée pour l’installation en question. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 27 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 26. Article 26. PART 4 (PARTIE 4) PART 4 PARTIE 4 DRILLING OPERATIONS, EQUIPMENT AND PROCEDURES (TRAVAUX, MATÉRIEL ET PROCÉDÉS DE FORAGE) DRILLING OPERATIONS, EQUIPMENT AND TRAVAUX, MATÉRIEL ET PROCÉDÉS DE FORAGE PROCEDURES 26. Assumed maximum formation pressure (Pression maximale de formation présumée) 26. Assumed maximum formation pressure 26. Pression maximale de formation présumée For the purposes of this Part, when a well is being or Pour l’application de la présente partie, lorsqu’un puits has been drilled in a formation and the maximum a été foré ou est en voie d’être foré dans une formation formation pressure is not known, the maximum et que la pression maximale de cette formation est formation pressure shall be assumed to be equal to or inconnue, elle est présumée égale ou supérieure au greater than the product of 11 kPa/m and the true produit de la profondeur du puits, mesurée à la vertical depth of the well in metres. verticale, en mètres par 11 kPa/m. 27. Variation of Part 4 requirements (Modification des exigences) 27. Variation of Part 4 requirements 27. Modification des exigences The Chief Operations Officer may, in respect of a Le délégué aux opérations peut à l’égard d’un puits particular well, vary any of the requirements of this particulier, modifier toute exigence de la présente Part or exempt the licensee from compliance with any partie ou exempter le titulaire de la licence de se of the requirements of this Part pursuant to a request conformer à toute exigence de la présente partie, sur for the variation or exemption contained in the demande de modification ou d’exemption contenue application for the Well Licence or at any time, if the dans la demande de licence ou en tout temps, s’il est Chief Operation Officer is satisfied that the variation or d’avis que la modification ou l’exemption est nécessaire exemption is necessary or warranted in the ou justifiée dans les circonstances. circumstances. 28. Drilling near surface improvements (Aménagements en surface) 28. Drilling near surface improvements 28. Aménagements en surface (1) No person shall drill a well within 100 metres (1) Il est interdit de forer un puits à moins de cent from any surface improvement unless that person mètres d’un aménagement réalisé en surface à moins satisfies the Chief Operations Officer that de démontrer au délégué aux opérations : (a) the formation to which the well is intended to a) d’une part, que la formation ne peut être be drilled cannot be adequately evaluated by correctement évaluée par des travaux de drilling from a more distant surface location; forage effectués à partir d’un endroit plus and éloigné à la surface du sol; (b) the operation can be conducted without b) d’autre part, que les travaux projetés peuvent damage or threat to the surface improvement. être exécutés sans endommager les aménagements en surface ni les menacer. (2) When a well is to be drilled or re-entered within 5 (2) Si le forage d’un puits est projeté ou si une rentrée km of a licensed airport, the applicant for the Well est effectuée à moins de cinq kilomètres d’un aéroport Licence shall advise the general manager of that airport homologué, le demandeur de la licence de puits doit of the proposed or actual surface location of the well aviser le directeur général de cet aéroport de not later than the date on which the application for the l’emplacement du puits existant ou projeté au plus tard Well Licence is submitted. à la date à laquelle il présente la demande de licence visant le puits en question. Page 28 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 29. Article 29. (3) No well shall be drilled that may penetrate a (3) Aucun puits pouvant pénétrer un gisement minéral mineral deposit when there are mining operations or où des travaux miniers sont exécutés ou peuvent être when mining operations may be undertaken unless exécutés ne doit être foré, sauf si des mesures measures, satisfactory to the Chief Operations Officer, préalablement approuvées par le délégué aux are taken to opérations sont prises pour : (a) protect the mineral deposits from damage or a) protéger les gisements minéraux contre tout loss of value; or dommage ou toute dépréciation; (b) prevent interference with the mining operation. b) empêcher toute ingérence avec les travaux miniers. (4) No well shall be drilled unless the applicable (4) Aucun puits ne doit être foré si les exigences hydrogen sulphide safety requirements of section 170 énoncées à l’article 170 relatives à la sécurité en have been met. matière d’hydrogène sulfuré ne sont pas satisfaites. (5) The licensee shall ensure that the well does not (5) Le titulaire de licence doit veiller à ce que flow uncontrolled during the drilling operation. l’écoulement du puits soit controlé durant les travaux de forage. 29. Standards for drilling rigs (Normes relatives aux appareils de forage) 29. Standards for drilling rigs 29. Normes relatives aux appareils de forage (1) The minimum acceptable standards for a derrick, (1) Les normes minimales acceptables relatives au mast, draw-works, mud pumps and related equipment derrick, au mât de levage, au treuil principal, aux installed on a drilling rig are those standards that are pompes à boue et au matériel connexe installés sur un equal or superior to the relevant specifications of the appareil de forage sont au moins conformes aux American Petroleum Institute or other standards normes pertinentes de l’American Petroleum Institute provided for in the directions of the Chief Operations ou à toutes autres normes prescrites selon les Officer. directives du délégué aux opérations. (2) The derrick, mast, draw-works, mud pumps and (2) Le derrick, le mât de levage, le treuil principal, les related equipment of a drilling rig must be designed to pompes à boue et le matériel connexe d’un appareil de operate safely and efficiently under the maximum load forage doivent être conçus pour fonctionner conditions anticipated during any drilling operation or efficacement et en toute sécurité dans les conditions de well operation. charge maximales prévues au cours du forage ou de l’exploitation du puits. 30. Drilling rig removal requirements (Exigences quant au déplacement d’un appareil de forage) 30. Drilling rig removal requirements 30.
Part document.segment-4
Oil and Gas Drilling and Production Regulations — segment 4
- document.segment-4 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 4
AI-assisted research summary: This part sets drilling and blowout-control requirements for wells, including drilling-fluid capacity, equipment, testing, and rules for moving a drilling rig.
Exigences quant au déplacement d’un appareil de forage The licensee of a well must not remove or release a Le titulaire d’une licence de puits ne doit démonter ni drilling rig from the well unless the well is completed, retirer aucun appareil de forage du puits à moins que suspended or abandoned in accordance with these ce puits ne soit achevé ou abandonné, soit Regulations or permission is given by the Chief provisoirement soit définitivement, conformément aux Operations Officer to do so. exigences du présent règlement ou que le délégué aux opérations n’ait donné son autorisation à cette fin. 31. Drilling fluid system (Système de fluides de forage) 31. Drilling fluid system 31. Système de fluides de forage (1) The drilling fluid system, including the drilling (1) Le circuit du fluide de forage, y compris le fluide fluid, the circulating system and the associated de forage lui-même, le système de circulation et monitoring and maintenance equipment used during a l’équipement de surveillance et d’entretien connexe drilling operation must be capable of utilisés au cours des travaux de forage, doit être sélectionné de manière à : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 29 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 31. Article 31. (a) preventing the uncontrolled entry of formation a) empêcher l’entrée intempestive des fluides de fluids into the well-bore; formation dans le trou de sonde; (b) allowing proper well evaluation; b) permettre une évaluation adéquate du puits; (c) coping with all lithological, operational, c) faire face aux différentes pressions et pressure, temperature and other well températures ainsi qu’aux conditions conditions that may be encountered; and lithologiques, opérationnelles et autres pouvant se présenter pendant les travaux; (d) removing excess drill solids, weighting material d) débarrasser le fluide de forage de tout surplus and formation fluids from the drilling fluid. de matières de forage solides, de charges et de fluides de formation. (2) The combined capacity of the drilling fluid tanks of (2) La capacité combinée des réservoirs de fluide de every drilling fluid system must be not less than the forage de chaque circuit de fluide de forage doit être greater of égale ou supérieure à la plus grande des valeurs suivantes : (a) 120 m3; and a) soit 120 m3; (b) 50 % of the volume of the well-bore. b) soit 50 % du volume total du trou de sonde. (3) During any drilling operation, the volume of active (3) Au cours des travaux de forage, le volume de fluide drilling fluid in the surface system of a well must not de forage actif se trouvant dans l’installation de surface be less than 50% of the well bore capacity or 65 m3, d’un puits ne peut être inférieur au moindre de 50 % whichever is the lesser. de la capacité totale du trou de sonde ou de 65 m3. (4) The licensee shall, in respect of a well, (4) Le titulaire de licence doit, à l’égard de chaque puits : (a) have stored on the well site a reserve stock of a) stocker à pied d’œuvre une réserve weight and other drilling fluid material in an d’alourdissant et autre fluide de forage jugée amount satisfactory to the Chief Operations suffisante par le délégué aux opérations; Officer; (b) have suitable facilities for the rapid addition of b) disposer d’installations appropriées pour the reserve stock to the drilling fluid system; l’injection rapide de la réserve dans le circuit de and fluide de forage; (c) ensure that sufficient quantities of fuel, drilling c) veiller à ce que le chantier du puits de forage fluid materials, cement and other drilling dispose de stocks suffisants de combustible, de consumables are stored on the well site to meet fluide de forage, de ciment et d’autres matières normal conditions and foreseeable emergency consommables de forage pour répondre aux conditions. besoins en conditions normales et dans toute situation d’urgence prévisible. (5) The equipment provided to monitor the drilling (5) Le matériel prévu pour surveiller le fluide de forage fluid of every drilling fluid system must include de chaque circuit de fluide de forage doit comprendre : (a) a pit volume totalizer with a warning device to a) un indicateur de niveau de boue (PVT) muni alert personnel of mud volume gains or losses; d’un dispositif d’avertissement signalant à l’équipe les augmentations et les diminutions du niveau des boues dans les bassins; Page 30 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 32. Article 32. (b) a trip tank with measuring devices that b) un bac de manœuvre muni d’instruments de accurately determines the mud volume used to mesure permettant de déterminer précisément fill the well-bore on trips; la quantité de boue utilisée pour remplir le trou de sonde pendant les remontées et les redescentes de l’outil de forage; (c) a mud-return or full-hole indicator that c) un indicateur de remplissage ou de retour de monitors the relative drilling fluid returns and boue assurant la surveillance des remontées du is accessible to the drill crew; fluide de forage et auquel l’équipe de forage a accès; (d) equipment to test the physical and chemical d) le matériel servant à vérifier les propriétés properties of the drilling fluid entering and chimiques et physiques du fluide de forage qui leaving the well-bore, including density, pénètre dans le trou de sonde et qui en sort, y viscosity, water loss, filter cake, salinity, pH, compris la densité, la viscosité, la perte d’eau, solids content and gel strengths; and le cake de filtration, la salinité, le pH, la teneur en matières solides et la force du gel; (e) automatic gas and, when applicable, hydrogen e) des dispositifs automatiques de détection, de sulphide detecting and recording devices that mesure et d’enregistrement des gaz et, le cas trip an automatic audio alarm to warn of any échéant, d’hydrogène sulfuré qui déclenchent increase in the gas or hydrogen sulphide une alarme sonore automatique pour signaler content of the drilling fluid. toute augmentation de la teneur en gaz ou en hydrogène sulfuré du fluide de forage. (6) The indicators and alarms required pursuant to (6) Les indicateurs et les dispositifs d’alarme prescrits subsection (5) must be strategically located on the au paragraphe (5) doivent être installés à des endroits drilling rig to alert any drilling supervisor or driller stratégiques sur l’appareil de forage, de façon à alerter while at their normal stations. le chef foreur ou le foreur lorsqu’ils sont à leur poste ordinaire. (7) The licensee shall, in accordance with the (7) Le titulaire de licence doit prévoir un mode directions of the Chief Operations Officer, provide a d’élimination du fluide de forage, des déblais de forage means of disposing of drilling fluid, drill cuttings and et des gaz extraits du fluide de forage en conformité gas separated from the drilling fluid. avec les directives du délégué aux opérations. (8) When a mud-gas separator is to be used, it must (8) Lorsqu’un séparateur gaz/boue est utilisé, il doit be installed in accordance with section 1.3 of the être installé conformément aux exigences énoncées à Petroleum Industry Training Service’s Alberta l’article 1.3 du document intitulé Alberta Recommended Recommended Practices for Drilling Critical Sour Wells Practices for Drilling Critical Sour Wells, du “Petroleum to the extent they are not in conflict with or Industry Training Service” dans la mesure où elles ne inconsistent with these Regulations. contreviennent pas aux normes et aux prescriptions du présent règlement. 32. Approved drilling fluid (Fluides de forage approuvés) 32. Approved drilling fluid 32. Fluides de forage approuvés (1) The type of drilling fluid used as a circulatory (1) Le délégué aux opérations doit approuver la sorte medium in the drilling of a well must be approved by de fluide de forage utilisé comme moyen circulatoire the Chief Operations Officer. durant le forage d’un puits. (2) When air, inert gas or foam is approved for use as (2) Lorsque l’un ou l’autre de l’air, du gaz inerte ou de the circulatory medium for the drilling of a well, the la mousse est approuvé comme moyen circulatoire licensee of the well shall install and maintain durant le forage d’un puits, le titulaire de la licence de puits doit installer et entretenir: c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 31 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 33. Article 33. (a) a rotating head, control head or rotating a) une tête rotative, une tête de contrôle ou un blowout preventer that has a pressure rating obturateur anti-éruption rotatif ayant une acceptable to the Chief Operations Officer and pression nominale acceptable au délégué aux is capable of diverting the return air or inert opérations, et qui est capable de dévier le débit gas flow to suitable separation equipment de retour d’air ou de gaz inerte vers une through a bleed-off line that is as straight as installation de séparation convenable par le practicable and not less than 50 metres in biais d’un tuyau de fuite aussi droit que length; possible et d’une longueur d’au moins 50 m; (b) a hydrogen sulphide monitor on the bleed-off b) lorsque des formations pouvant contenir de line that continuously detects for hydrogen l’hydrogène sulfuré sont forées, un dispositif sulphide when formations that may contain automatique de détection d’hydrogène sulfuré hydrogen sulphide are being drilled; and sur le tuyau de fuite; (c) a device to provide a continuous source of c) un dispositif pour fournir une source ignition at the end of the bleed-off line. continuelle d’allumage à l’extrémité du tuyau de fuite. (3) When air, inert gas or foam is approved for use in (3) Lorsque l’un ou l’autre de l’air, du gaz inerte ou de the circulatory system pursuant to subsection (1), the la mousse est approuvé comme moyen circulatoire en blowout prevention system and casing program must application du paragraphe (1), le système d’obturateurs be designed to contain the maximum formation anti-éruption et le programme de tubage doivent être pressure that may be encountered. conçus pour recevoir la pression maximale de formation pouvant se produire. (4) When air or inert gas drilling is finished, the (4) Lorsque le forage à l’air ou au gaz inerte est rotating head must be removed and replaced with a terminé, on doit remplacer la tête rotative par une split design flow nipple, unless the rotating head or duse de fond à clapet à mi-étages, à moins que la tête packoff device is equipped with an upper flange rotative ou le dispositif de régulation de débit soit muni connection suitable for the installation of auxiliary d’un bride de raccordement supérieure qui convient au equipment. raccordement du matériel auxiliaire. 33. Well classification during drilling operations (Classification des puits durant le forage) 33. Well classification during drilling 33. Classification des puits durant le forage operations (1) For the purpose of drilling blowout prevention (1) Pour l’application des exigences portant sur les system requirements, a well is classified as systèmes d’obturateurs anti-éruption de forage, les puits sont classifiés de la façon suivante : (a) a class I well if the well does not have any a) un puits est de classe I s’il n’a pas de tubage de surface casing set; surface; (b) a class II well if the depth of the well is b) un puits est de classe II s’il s’étend entre le between the surface casing and 750 metres; tubage de surface et 750 mètres de profondeur; (c) a class III well if the depth of the well is c) un puits est de classe III s’il s’étend entre 750 greater than 750 metres but less than or equal et 1 800 mètres de profondeur; to 1,800 metres; (d) a class IV well if the depth of the well is greater d) un puits est de classe IV s’il s’étend entre 1 800 than 1800 metres but less than or equal et 3 600 mètres de profondeur; to 3,600 metres; Page 32 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 34. Article 34. (e) a class V well if the depth of the well is greater e) un puits est de classe V s’il s’étend entre 3 600 than 3600 metres but less than or equal et 6 000 mètres de profondeur; to 6,000 metres; and (f) a class VI well if the depth of the well is greater f) un puits est de classe VI s’il est d’une than 6,000 metres. profondeur supérieure à 6 000 mètres. (2) The minimum working pressure rating of the (2) La capacité de pression de marche minimale pour blowout prevention equipment for a drilling operation le matériel d’obturateurs anti-éruption de forage doit must be être : (a) equal to maximum formation pressure a) égale à la pression de formation maximale anticipated to be encountered before the prévue avant la mise en place du tubage de installation of surface casing for a class I well; surface pour un puits de classe I; (b) 14 MPa for a class II or III well; b) de 14 MPa pour un puits de classe II ou III; (c) 21 MPa for a class IV well; c) de 21 MPa pour un puits de classe IV; (d) 34 MPa for a class V well; and d) de 34 MPa pour un puits de classe V; (e) 69 MPa for a class VI well. e) de 69 MPa pour un puits de classe VI. (3) The Chief Operations Officer may vary the blowout (3) Le délégué aux opérations peut modifier les prevention equipment requirements for a well as exigences pour le modèle d’obturateur anti-éruption described in Schedule D or the classification of a well décrit à l’annexe D ou la classification d’un puits visé described in this section, either pursuant to a request dans le présent article, soit sur demande jointe à une contained in the application for the Well Licence or at demande de licence de puits ou à tout moment où il le any time if the Chief Operations Officer considers it considère nécessaire. necessary to do so. 34. Well control equipment generally (Matériel de contrôle d’un puits) 34. Well control equipment generally 34. Matériel de contrôle d’un puits (1) The licensee of a well shall ensure that all well (1) Le titulaire d’une licence de puits doit veiller à ce control equipment for a drilling operation and the que tout le matériel de contrôle du puits pendant les surface equipment necessary for formation flow testing travaux de forage et le matériel de surface nécessaire aux essais d’écoulement de formation : (a) are installed in such a manner that they can a) soient mis en place de manière qu’ils puissent properly fulfil their respective functions; remplir correctement leur fonction; (b) are tested on installation and periodically b) soient soumis à une épreuve au moment de thereafter in accordance with sections 46 to 48, leur mise en place et périodiquement par 61 and 62; après, conformément aux dispositions des articles 46 à 48, 61 et 62; (c) have sufficient structural strength to withstand c) possèdent une résistance structurale suffisante normal loading conditions associated with pour résister aux conditions de chargement drilling and related operations; and normales ssociées aux travaux de forage et aux travaux connexes; (d) are designed to operate under all climatic d) soient conçus pour fonctionner dans toutes les conditions that may reasonably be anticipated conditions météorologiques prévisibles durant to occur during the drilling operations. les travaux de forage. (2) Lighting must be adequate to ensure complete (2) L’éclairage doit permettre de voir clairement tout visibility of the well control equipment. matériel de contrôle du puits. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 33 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 35. Article 35. (3) The licensee shall ensure that (3) Le titulaire de licence doit veiller à ce que soient affichées bien en évidence dans l’abri de chantier ou au poste du chef foreur : (a) current information on the status of the well, a) l’information à jour concernant l’état du puits, including the mud density; and y compris la densité de la boue de forage; (b) detailed procedures for controlling a kick, b) la marche à suivre détaillée pour maîtriser unà-coup de pression. are displayed in a conspicuous place in the doghouse or at the driller’s station. 35. Blowout prevention systems generally (Systèmes d’obturateurs anti-éruption) 35. Blowout prevention systems generally 35. Systèmes d’obturateurs anti-éruption (1) The licensee of a well shall ensure that the (1) Le titulaire d’une licence de puits doit assurer la blowout prevention system is installed and maintained mise en place et l’entretien régulier du système at all times so that it is d’obturateurs anti-éruption afin qu’il soit : (a) adequate to shut off any flow at the wellhead a) suffisant pour interrompre le débit à la tête du whether or not any type of tool or equipment is puits, qu’on emploie ou non un outil ou du being used in the well bore; and matériel dans le trou de sonde; (b) designed to permit the maintenance, retrieval b) conçu pour permettre l’entretien, le retrait et le and replacement of any major component of remplacement de tous ses éléments principaux the system while maintaining well control. sans perte de contrôle du puits. (2) The licensee shall ensure that (2) Le titulaire de licence doit veiller à ce que : (a) blowout preventers are not used for any a) les obturateurs servent exclusivement au function except well control; and contrôle du puits; (b) qualified personnel are present to supervise on- b) un personnel qualifié soit sur place pour site assembly of the blowout preventers and to superviser l’assemblage des obturateurs à pied provide advice respecting the assembly. d’œuvre et fournir des conseils à leur sujet. (3) The owner of blowout prevention equipment for a (3) Les fournisseurs d’obturateurs anti-éruptions well shall maintain records pertaining to equipment doivent tenir à jour les rapports d’homologation, material certification, testing, repair and maintenance d’essai, de réparation et d’entretien de leurs produits, and ensure that the records are available at the well et veiller à ce que ces documents soient disponibles site for review by the licensee and the Chief Operations pour fins de consultation par le titulaire de licence et le Officer. délégué aux opérations sur le chantier du puits. (4) If the records required under subsection (3) are (4) Tout obturateur anti- éruptions pour lequel les not available, the blowout prevention equipment must documents exigés au paragraphe (3) ne sont pas be recertified prior to use and the recertification must diponibles doit être homologué de nouveau avant son be acceptable to the licensee and the Chief Operations emploi, à la satisfaction du titulaire de licence et du Officer. délégué aux opérations. (5) When hydraulic control lines are used to activate a (5) Les flexibles de commande hydrauliques du bloc blowout prevention system, the lines must be fire- d’obturation doivent être à l’épreuve du feu. resistant. (6) Every blowout prevention system must be equipped (6) Tout système d’obturateurs anti-éruption doit être with elastomers that are compatible with the drilling muni d’élastomères qui sont compatibles avec le fluid being used. fluide de forage utilisé. Page 34 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 36. Article 36. 36. Blowout prevention requirements for drilling (Exigences de prévention des éruptions lors du forage) 36. Blowout prevention requirements for 36. Exigences de prévention des éruptions drilling lors du forage (1) The licensee of a well shall ensure that (1) Le titulaire d’une licence de puits doit veiller à ce que soit mis en place sur la tête du puits : (a) when drilling operations are carried out below a) un dispositif de détournement d’éruption ou un the conductor pipe, conductor casing or système d’obturateurs anti-éruption, lorsque permafrost casing of the well, a diverter or les travaux de forage se déroulent au-dessous blowout prevention system is installed on the du tuyau guide, du tubage initial ou du tubage wellhead; and de pergélisol; (b) when drilling operations are carried out below b) un système d’obturateur anti-éruption, lorsque the surface casing of the well, a blowout le forage se déroule au-dessous du tubage de prevention system is installed on the wellhead. surface. (2) A blowout prevention system installed pursuant to (2) Le système d’obturateur anti-éruption mis en place subsection (1) must conformément au paragraphe (1) doit : (a) have a rated working pressure that is at least a) avoir une pression de marche nominale égale equal to the minimum working pressure rating ou supérieure à la pression de marche provided for in subsection 33(2); and minimale précisée au paragraphe 33(2); (b) consist of b) être formé : (i) blowout prevention equipment designed in (i) d’un obturateur anti-éruption conçu accordance with Schedule D, conformément aux exigences de l’annexe D, (ii) a control system, (ii) d’un dispositif de commande, (iii) an accumulator system and nitrogen (iii) d’un système d’accumulateur et d’un recharging system, dispositif de recharge à l’azote, (iv) a working spool, (iv) d’une bride d’ancrage en état de fonctionnement, (v) a hydraulically-controlled remote valve, (v) d’un robinet à télécommande hydraulique, (vi) a kill line, (vi) d’une conduite de neutralisation, (vii) a pressure relief line, (vii) d’une conduite de détente de pression, (viii) a choke manifold, (viii) d’un manifold d’engorgement, (ix) safety valves and stabbing valves, and (ix) de vannes de sécurité et de vannes d’intervention d’urgence, (x) a flare line and flare tank. (x) d’une ligne et d’un réservoir ou fosse de brûlage. (3) Despite paragraph (2)(a), the pressure rating of (3) Malgré l’alinéa (2)a), la pression nominale de tous any annular-type blowout preventer must be greater les obturateurs de type annulaire doit être supérieure à than 50% of the maximum anticipated formation 50 % de la pression maximale de formation prévue, pressure but need not exceed 35 MPa. mais n’a pas à dépasser 35 MPa. (4) A hydraulically-operated blowout preventer must (4) Un obturateur à opération hydraulique doit pouvoir be capable of being activated from the drilling rig floor être activé à partir du plancher de forage et à partir and from one other physical location remote from the d’un autre endroit éloigné de la tête de puits. wellhead. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 35 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 37. Article 37. (5) The licensee shall ensure that all ram-type (5) Le titulaire de licence doit veiller à ce que tous les preventers that are not equipped with automatic ram obturateurs à mâchoires non munis de dispositifs de locking devices have hand wheels installed on them or blocage soient munis de volants de manoeuvre ou have hand wheels readily accessible for installation. facilement disponibles pour y être mis en place. 37. Control system (Dispositif de commande) 37. Control system 37. Dispositif de commande A control system referred to in Le dispositif de commande mentionné au sous- subparagraph 36(2)(b)(ii) must consist of alinéa 36(2)b)(ii) doit comporter : (a) a control panel whose functions are clearly a) un panneau de commande dont les éléments identified on it and in full view and within easy sont clairement identifiés, parfaitement visibles access of the driller’s station; et facilement accessibles du poste du foreur; (b) a second control panel located in a readily b) un deuxième panneau de commande situé à un accessible physical location that is remote from endroit facilement accessible et protégé du the drill floor and at least 20 metres from the débit du puits, à l’extérieur du plancher de wellhead and at which the panel is protected forage et à au moins vingt mètres de la tête de from the flow of the well; puits; (c) a secondary control system and a secondary c) un dispositif de commande secondaire ayant sa source of operating power capable of activating propre source d’alimentation en énergie et the blowout preventers in case the primary pouvant activer le bloc d’obturation en cas de control system or primary power source fails; défaillance du dispositif de commande principal and ou de la source d’alimentation de celui-ci;; (d) equipment that is capable of d) un dispositif de commande capable : (i) closing any ram-type preventer within 30 (i) de fermer tous les obturateurs à mâchoires seconds of activation, en moins de trente secondes, (ii) closing any annular-type blowout preventer (ii) de fermer tous les obturateurs de type within 45 seconds of activation; and annulaire en moins de 45 secondes; (iii) opening the hydraulically-controlled remote (iii) d’ouvrir le robinet à télécommande valve. hydraulique. 38. Accumulator and recharging system (Accumulateur et dispositif de recharge) 38. Accumulator and recharging system 38. Accumulateur et dispositif de recharge (1) An accumulator system referred to in (1) Le système d’accumulateur mentionné au sous- subparagraph 36(2)(b)(iii) must alinéa 36(2)b)(iii) doit : (a) be located in a readily accessible and protected a) être situé à un endroit facilement accessible et area at least 20 metres from the drill floor; protégé se trouvant à au moins vingt mètres du plancher de forage; (b) have sufficient usable fluid, with a safety factor b) comporter une réserve de fluide suffisante, of 1.5, to close an annular-type preventer, assortie d’un facteur de sécurité de 1,5, pour close, open and re-close one ram-type fermer un obturateur de type annulaire, preventer and open the hydraulically controlled fermer, ouvrir et refermer un obturateur à remote valve in one continuous sequence, while mâchoires et ouvrir le robinet à télécommande retaining a pressure of 8,400 kPa on the hydraulique en une séquence ininterrompue, accumulator system with the recharge pump tout en maintenant une pression de 8 400 kPa off during drilling operations; sur l’accumulateur avec la pompe de recharge arrêtée, durant les travaux de forage; Page 36 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 39. Article 39. (c) be connected to the blowout preventer and the c) être raccordé à l’obturateur anti-éruption et au hydraulic valve with lines of working pressure robinet à télécommande hydraulique par des equal to the working pressure of the lignes de pression de marche égale à la accumulator, with any line located under the pression de marche de l’accumulateur, les substructure of the rig made of steel or lignes situées sous l’infrastructure de l’appareil sheathed with approved fire-resistant sleeving; de forage étant faites d’acier ou gainées de matériel résistant au feu approuvé; (d) be recharged by an automatic pressure- d) être rechargé par une pompe automatique à controlled pump that is capable of recovering in pression capable de récupérer en moins de cinq not more than five minutes any drop in the minutes, toute chute de pression dans pressure of the accumulator resulting from the l’accumulateur résultant de l’utilisation du operation of the hydraulic valve and full closure robinet hydraulique et de la fermeture totale de of the annular blowout preventer; and l’obturateur annulaire; (e) be capable of closing any ram-type blowout e) être en mesure de fermer tous les types preventer in not more than 30 seconds and any d’obturateurs à mâchoires en moins de 30 annular-type blowout preventer in not more secondes et tous les types d’obturateurs than 90 seconds, using only the accumulator. annulaires en moins de 90 secondes, en utilisant seulement l’accumulateur. (2) A nitrogen recharging system installed pursuant to (2) Le dispositif de recharge à l’azote mis en place subparagraph 36(2)(b)(iii) must conformément au sous-alinéa 36(2)b)(iii) doit : (a) be capable of opening the hydraulic valve and a) être capabled’ouvrir la vanne hydraulique et de closing the annular-type blowout preventer and fermer l’obturateur annulaire et un obturateur one ram-type blowout preventer; and à mâchoires; (b) be under a pressure of not less than 12,500 b) supporter une pression d’au moins 12 500 kPa. kPa. 39. Working spools (Brides d’encrage) 39. Working spools 39. Brides d’encrage A working spool referred to in La bride d’encrage mentionnée au sous- subparagraph 36(2)(b)(iv) must include alinéa 36(2)b)(iv) doit comprendre : (a) outlets with full-opening gate valves to serve as a) des sorties avec vannes à passage direct primary control; intégrales pour le contrôle primaire; (b) a kill side with a primary valve and a check b) un côté pour injection muni d’une vanne valve; principale et d’un clapet de retenue ou de non- retour; (c) a bleed-off side with a primary and a c) un côté pour fuite muni d’une vanne principale secondary (backup) valve; and et d’une vanne secondaire d’appoint; (d) valves with a working pressure rating equal to d) des vannes dont la pression de marche or greater than the blowout preventers. nominale est égale ou supérieure à celle des obturateurs anti-éruption. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 37 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 40. Article 40. 40. Kill lines and pressure relief lines (Conduites de neutralisation et conduites de détente de pression) 40. Kill lines and pressure relief lines 40. Conduites de neutralisation et conduites de détente de pression (1) A kill line and a pressure relief line referred to in (1) Les conduites de neutralisation ou de détente de subparagraphs 36(2)(b)(vi) and (vii) respectively must pression mentionnées aux sous-alinéas 36(2)b)(vi) et (vii) doivent : (a) be securely tied down; a) être bien ancrées; (b) have a rated working pressure equal to or b) avoir une pression de marche nominale au greater than the pressure rating of the blowout moins égale à celle des obturateurs anti- preventers; and éruptions; (c) be constructed of steel or flexible hose, and in c) être fabriquées d’acier ou de tube flexible et the case of flexible hose must be dans le cas d’un tube flexible : (i) flanged with factory-installed connections, (i) être bridées par des raccords préinstallés en usine, (ii) fire-resistant, (ii) être à l’épreuve du feu, (iii) of no smaller internal diameter than related (iii) avoir un diamètre intérieur au moins égal au equipment, diamètre intérieur du matériel auquel elles sont raccordées, (iv) shop inspected and shop pressure-tested (iv) être inspectées et éprouvées à pression en every three years, atelier tous les trois ans, (v) marked so that the manufacturer can be (v) afficher clairement la marque du fabricant, readily determined, and (vi) straight or with bends having a radius no (vi) être droites ou courbées avec un rayon au less than the manufacturer’s specified moins égal au rayon minimal de courbe minimum bending radius. suggéré par le fabricant. (2) The licensee shall ensure that (2) Le titulaire de licence doit veiller à ce que : (a) the maximum allowable casing pressure for the a) la pression de tubage maximale admissible appropriate mud weight is posted near the compte tenu de la masse volumique de la boue remotely operated choke; and injectée soit affichée à proximité de la duse télécommandée; (b) all kill lines and pressure relief lines are b) toutes les conduites de neutralisation ou de designed so that there is a minimum number détente de pression aient un tracé le plus of changes in the direction of flow and, when rectiligne possible et que les coudes prononcés, an abrupt change is necessary, the change is s’il y en a, comportent une protection adéquate protected against erosion. contre l’usure par frottement. Page 38 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 41. Article 41. 41. Choke manifold (Manifold d’engorgement) 41. Choke manifold 41. Manifold d’engorgement (1) A choke manifold referred to in (1) Le manifold d’engorgement mentionné au sous- subparagraph 36(2)(b)(viii) must have a rated working alinéa 36(2)b)(viii) doit avoir une pression de marche pressure equal to or greater than the pressure rating of nominale égale ou supérieure à celle des obturateurs the blowout preventers. anti-éruption. (2) The inside diameter of all lines and valves (2) Le diamètre intérieur de toutes les conduites et comprising the choke manifold must be nominal 75 vannes formant le manifold d’engorgement doit être mm. de 75 mm. (3) The flow from a well must be capable of being (3) Le fluide sortant du puits doit pouvoir passer par la directed through the main flow line and two or more conduite principale et deux ou plusieurs conduites secondary lines of the choke manifold and each secondaires du manifold d’engorgement et chaque secondary line must be equipped with an adjustable conduite secondaire de celui-ci doit être munie d’une choke or, in the case of class III to VI wells, one duse réglable ou, dans le cas d’un puits de classe III à remotely-operated choke and one adjustable choke. VI, d’une duse télécommandée et d’une duse réglable. (4) The choke manifold must (4) Le manifold d’engorgement doit être muni : (a) be equipped with at least two pressure gauges, a) d’au moins deux manomètres gradués par if the calibration range is divided into a tranches maximales de 250 kPa, le premier maximum of 250 kPa increments, one of which pour la mesure de la pression dans la tige de reads drill pipe pressure and the other which forage et l’autre pour la mesure de la pression reads casing pressure; and dans le tubage; (b) have installed a sufficient number of outlets to b) d’un nombre suffisant de sorties pour measure the pressure under any selection of permettre de mesurer la pression selon flow routes. n’importe lequel des tracés d’écoulement choisis. (5) The licensee shall ensure that during all operations (5) Le titulaire de licence doit veiller à ce qu’on dispose gauges sufficient in number to fit all gauge outlets on en tout temps d’un nombre suffisant de manomètres the choke manifold are available for immediate pour équiper toutes les sorties de pression du manifold installation. d’engorgement. (6) The choke manifold must be protected against (6) Le manifold d’engorgement doit être protégé freezing. contre le gel. (7) A choke manifold in an enclosed area must be (7) Les manifolds d’engorgement placés dans un located at least 25 metres from the wellhead and the espace clos doivent être à une distance d’au moins 25 enclosed area must be properly ventilated, heated and mètres de la tête de puits et l’espace clos doit être illuminated and have at least two exits. ventilé, chauffé et éclairé de façon adéquate et comporter au moins deux issues. (8) The licensee shall ensure that the maximum (8) Le titulaire de licence doit veiller à ce que la allowable casing pressure for the appropriate mud pression maximale admissible du tubage compte tenu weight is posted near the remotely operated choke and de la masse volumique de la boue injectée soit affichée on the rig floor. à proximité de la duse télécommandée et sur le plancher de forage. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 39 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 42. Article 42. 42. Safety valves and stabbing valves (Vannes de sécurité et vannes d’intervention d’urgence) 42. Safety valves and stabbing valves 42. Vannes de sécurité et vannes d’intervention d’urgence (1) Valves referred to in subparagraph 36(2)(b)(ix) (1) Les vannes mentionnées au sous-alinéa 36(2)b)(ix) must comply with the following doivent être conformes aux exigences suivantes: (a) a safety valve must be installed in the drill a) une vanne de sécurité doit être posée dans le string immediately above and below the kelly; train de forage immédiatement au-dessous et au-dessus de la tige d’entraînement; (b) in the case of a top drive drilling system, a b) dans le cas d’un appareil de forage à lower and an upper safety valve, both having entraînement par le haut, deux vannes, soit manual access, must be installed; and une inférieure et une supérieure, manœuvrables à la main, doivent être mises en place; (c) there must be available on every drill floor c) on doit disposer, sur chaque plancher de forage : (i) a full-opening drill string stabbing valve to fit (i) d’une vanne d’intervention d’urgence de each type of connection in the drill string or train de forage à passage direct adaptée à bottom hole assembly with a readily chaque type de raccordement du train de available closing key, and forage ou du matériel de fond munie d’une clé de fermeturerapidement et facilement utilisable, (ii) a suitable inside blowout preventer valve. (ii) d’une vanne anti-éruption intérieure convenable. (2) A stabbing valve referred to in (2) La vanne d’intervention d’urgence visée au sous- subparagraph (1)(c)(i) must alinéa (1)c)(i) doit être conforme aux exigences suivantes : (a) have a pressure rating equal to or greater than a) elle doit avoir une pression nominale égale ou the pressure rating of the blowout preventers; supérieure à celle des obturateurs anti- éruptions; (b) not be used as a working valve; and b) elle ne doit pas servir de vanne de manœuvre; (c) be stored in an area immediately accessible to c) elle doit être rangée en position ouverte, the well bore, left in the open position, and kept propre, bien entretenue, exempte de glace et clean, properly maintained, ice-free and ready prête à utiliser, dans un endroit for use. immédiatement accessible depuis le trou de sonde. 43. Flare lines and flare tanks (Conduites de torche) 43. Flare lines and flare tanks 43. Conduites de torche (1) A flare line referred to in (1) La ligne de brûlage visée au sous-alinéa 36(2)b)(x) subparagraph 36(2)(b)(x) and any other line et toute autre conduite en aval du manifold downstream of the choke manifold referred to in d’engorgement visé à l’article 41 doit avoir un diamètre section 41 must have an inside diameter not less than intérieur au moins égal à celui de la plus grosse the inside diameter of the largest line in the choke conduite du manifold d’engorgement. manifold. Page 40 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 44. Article 44. (2) A flare tank referred to in subparagraph 36(2)(b)(x) (2) Le réservoir ou fosse de brûlage mentionné au must be on the well site and located at least 50 metres sous-alinéa 36(2)b)(x) doit être situé sur le chantier du from the well bore. puits à au moins 50 mètres du trou de sonde. (3) A flare line for a well must (3) Une ligne de brûlage pour un puits doit rencontrer les exigences suivantes : (a) extend from the choke manifold to the flare a) relier le manifold d’engorgement au réservoir tank; ou à la fosse de brûlage du puits; (b) be designed to prevent the accumulation of any b) être conçue pour y prévenir toute accumulation fluid within the line; de fluide; (c) be properly installed and anchored; and c) être mise en place et ancrée de façon convenable; (d) when sour gas is known or expected to be d) lorsqu’il est prévu qu’il y aura production de produced, be equipped with a flare stack gaz acide, comporter une colonne de brûlage designed in accordance with section 128. conçue en conformité avec les dispositions de l’article 128. 44. Equipment for sour wells (Matériel pour puits corrosifs) 44. Equipment for sour wells 44. Matériel pour puits corrosifs Blowout preventers used on sour wells must conform to Les obturateurs anti-éruption équipant les puits the following requirements in addition to the corrosifs doivent satisfaire, en plus des exigences requirements of sections 34 to 43 énumérées aux articles 34 à 43, aux exigences suivantes : (a) all internal metallic blowout preventer a) tous les éléments internes métalliques des components which may be exposed to effluent obturateurs susceptibles d’entrer en contact containing sour gas must be certified as being avec l’effluent contenant du gaz acide doivent manufactured from materials meeting the être en matériau certifié conforme aux requirements of the National Association of exigences de la National Association of Corrosion Engineers; Corrosion Engineers; (b) flanged blowout preventer working spools with b) les puits désignés puits corrosifs critiques par two flanged side outlets are required on wells le délégué aux opérations doivent être équipés designated by the Chief Operations Officer as de manchettes de raccordement de manoeuvre critical sour wells; double-bridées à deux sorties latérales sur le bloc d’obturation; (c) a stabbing valve must be a National Association c) la vanne d’intervention d’urgence doit être du of Corrosion Engineers rated full-opening valve type à passage intégral et homologuée par la with the proper threads to mate to the National Association of Corrosion Engineers et completion string thread in use. elle doit comporter un filetage adapté à celui des tiges d’achèvement utilisées; (d) a sour service separator/flare stack system, d) un ensemble colonne de brûlage/séparateur including appropriate manifolding, must be idoine au gaz acide, muni d’un manifold used to process sour well effluent; and convenable, doit servir au traitement des effluents de puits corrosifs; (e) the heat source for the sour service e) la source de chaleur pour l’ensemble colonne de separator/flare stack system must be suitable brûlage/séparateur idoine au gaz acide doit for the electrical area classification in which it être adaptée à la classe d’emplacement de is used. matériel électrique où elle est utilisée. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 41 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 45. Article 45. 45. Blowout preventers when running casing (Obturateurs anti-éruption requis à la pose de tubage) 45. Blowout preventers when running casing 45. Obturateurs anti-éruption requis à la pose de tubage (1) The licensee shall ensure, when running casing (1) Lors de la pose de tubage dans un puits, le into a well on which a ram-type blowout preventer is titulaire de licence doit veiller à ce que, si un installed, that the preventer is fitted with rams to fit obturateur à mâchoires est mis en place, celui-ci soit the casing. muni de mâchoires adaptées au diamètre du tubage. (2) Casing may be run into a well for which the ram- (2) Il est permis de poser un tubage dans un puits type preventer does not match the casing run if dont l’obturateur à mâchoires n’est pas adapté au diamètre du tubage posé si l’on dispose : (a) a joint of drill pipe that fits the ram-type a) d’un joint de train de forage adapté à preventer has proper crossovers installed for l’obturateur à mâchoires et comportant une the casing being run and a method for picking réduction au diamètre du tubage à poser et up the joint for quick installation to such casing d’une méthode rapide de pose du joint sur ce is provided; and tubage; (b) a stabbing valve with key is readily available b) d’une vanne d’intervention d’urgence à clé for installation. immédiatement accessible pour la mise en place sur le tubage. 46. Blowout prevention tests generally (Essais des obturateurs) 46. Blowout prevention tests generally 46. Essais des obturateurs (1) The licensee of a well shall ensure that whenever (1) Au moment de la mise en place d’un obturateur a blowout preventer is installed on the well, anti-éruption sur un puits, le titulaire d’une licence de puits doit veiller à ce : (a) there is satisfactory proof of the certification of a) qu’il y ait preuve satisfaisante de la certification the blowout preventer and of the date of the de l’obturateur et de la date de celle-ci; certification; (b) the estimated finished drilling date in the b) que la date de fin de forage prévue dans la application for the Well Licence will occur demande de licence de puits se produira dans before the end of the three-year period les trois ans de la date de la dernière following the date of the blowout preventer’s certification de l’obturateur; last certification; (c) the blowout preventer is fully assembled, c) que l’obturateur soit complètement assemblé et pressure-tested and function-tested before mis à l’épreuve sous pression et qu’il fasse being installed on the well; and l’objet d’essais avant sa mise en place sur le puits; (d) the blowout preventer is visually inspected d) que l’obturateur fasse l’objet d’un contrôle before or after being installed on the well to visuel avant ou après qu’il soit mis en place sur confirm that le puits, afin de confirmer: (i) it is in good working order, and (i) qu’il est en bon état de fonctionnement, (ii) the annular and ram block rubbers for the (ii) que les garnitures élastomères annulaires et preventer are in good condition. celles des mâchoires des obturateurs sont en bon état. (2) For the purposes of this section, (2) Pour l’application du présent article: (a) a new blowout preventer is certified when its a) un nouvel obturateur anti-éruption est dit manufacturer has issued a certificate stating certifié lorsque son fabricant a délivré un Page 42 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 47. Article 47. that it has been made and tested in accordance certificat attestant qu’il a été fabriqué et a fait with the manufacturer’s specifications and l’objet d’essais en conformité avec les showing the date on which the certificate was instructions du fabricant, et indiquant la date issued; and de délivrance du certificat; (b) a previously used blowout preventer is certified b) Un obturateur anti-éruption usagé est dit when certifié: (i) it has been shop-serviced, overhauled and (i) lorsqu’il a été réparé et remis en état en tested in accordance with the manufacturer’s atelier et qu’il a fait l’objet d’essais en specifications, and conformité avec les instructions du fabricant, (ii) the person responsible for doing the work (ii) lorsque la personne responsable de la remise has issued a certificate to that effect en état a délivré un certificat d’attestation showing the date on which the certificate indiquant la date de délivrance du certificat. was issued. (3) The licensee of a well shall ensure that a blowout (3) Le titulaire d’une licence de puits doit veiller à ce preventer installed on the well is removed from the well qu’un obturateur anti-éruption mis en place sur le puits within three years after the date of its last certification. en soit retiré dans les trois ans de sa dernière certification.
Part document.segment-5
Oil and Gas Drilling and Production Regulations — segment 5
- document.segment-5 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 5
AI-assisted research summary: The licensee must follow detailed drilling, casing, cementing, testing, monitoring, and electrical safety requirements for wells.
(4) The licensee shall ensure that (4) Le titulaire de licence doit veiller à ce que: (a) all blowout preventer tests referred to in a) tous les essais des obturateurs mentionnés à paragraph (1)(c) are witnessed by l’alinéa (1)c) se déroulent en présence des representatives of the licensee and the drilling représentants du titulaire de licence et de contractor; and l’entrepreneur en forage; (b) all blowout prevention equipment tests and b) toutes les épreuves, les essais et les exercices drills referred to in sections 47, 48 and 49 are mentionnés aux articles 47, 48 et 49 menés sur recorded on the tour sheets for the well. le bloc d’obturation soient archivés sur les rapports de forage pour le puits. 47. Pressure tests of blowout prevention equipment (Épreuves de pression sur le matériel d’obturation) 47. Pressure tests of blowout prevention 47. Épreuves de pression sur le matériel equipment d’obturation (1) When pressure-testing any blowout preventer, (1) Le titulaire de licence doit veiller à ce que les choke manifold, kill line, pressure relief line or casing épreuves sous pression des obturateurs, des manifolds seal assembly as required by these Regulations, the d’engorgement, des conduites de neutralisation et de licensee shall ensure that détente de pression, ou des joints d’étanchéité du tubage réalisées conformément aux exigences du présent règlement se fassent : (a) a low viscosity fluid is used; a) avec un fluide de faible viscosité; (b) prior to each pressure test, personnel on the b) après l’annonce verbale au personnel du site are alerted by an oral announcement of the chantier, de la conduite imminente d’épreuves pressure test; and de pression; (c) there is used for each test c) aux deux pressions d’épreuve ci-dessous : (i) a test pressure of 1,500 kPa, and (i) une pression de 1 500 kPa, (ii) a test pressure equal to that prescribed for a (ii) une pression d’épreuve égale à celle casing pressure test in paragraph 61(2)(a), prescrite à l’alinéa 61(2)a) à l’égard des except in the case of an annular preventer, tubages, sauf dans le cas d’un obturateur c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 43 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 48. Article 48. in which case the test pressure must be annulaire pour lequel la pression d’épreuve equal to 50% of the rated working pressure doit être égale à la moindre des deux valeurs of the preventer or the pressure prescribed suivantes : 50 % de la pression de marche under paragraph 61(2)(a), whichever is the nominale de l’obturateur ou la pression lesser, with the preventer test being made déterminée selon l’alinéa 61(2)a), l’épreuve with the annular preventer closed on the drill devant être menée avec l’obturateur fermé pipe being used. sur la tige de forage utilisée. (2) The licensee shall ensure that (2) Le titulaire de licence doit veiller à ce que (a) the equipment referred to in subsection (1) is a) le matériel mentionné au paragraphe (1) soit pressure-tested éprouvé sous pression : (i) after installation, (i) après sa mise en place, (ii) before drilling out any casing string, (ii) avant le reforage d’une colonne de tubage, (iii) before the start of a formation flow test or a (iii) avant le début d’un essai d’écoulement de series of tests, formation ou d’une série d’essais, (iv) following repairs that require disconnecting (iv) à la suite de toute réparation ayant nécessité a pressure seal in the wellhead or blowout le démontage d’un joint d’étanchéité de la preventer stack, or when any component of tête de puits ou de l’obturateur anti-éruption the blowout preventer is disassembled (e.g., ou lorsqu’un de ses éléments a été démonté, opening of ram gates), and par exemple les vannes de manœuvre des mâchoires, (v) not less than once every 14 operational days; (v) au moins une fois tous les quatorze jours en cours d’opérations de forage; (b) appropriate remedial measures are undertaken b) des mesures correctives appropriées soient immediately when the blowout preventers fail prises immédiatement à l’égard de tout to meet pressure test requirements or operate obturateur qui a échoué à l’épreuve de pression as designed; and ou qui ne fonctionne pas comme prévu; (c) blowout preventers are not removed from the c) les obturateurs ne soient jamais enlevés de la wellhead unless the well is adequately secured tête de puits sans qu’une autre barrière with an appropriate barrier. convenable ait été mise en place. (3) Despite paragraph (2)(a), the licensee need not (3) Malgré l’alinéa (2)a), il n’est pas nécessaire que le pressure-test shear rams in a blowout preventer stack titulaire de licence soumette à une épreuve de pression if there is a separate set of blind rams in the same les mâchoires coupe-tige d’un bloc d’obturation lorsque stack. ce bloc comprend un jeu distinct de mâchoires à fermeture totale. 48. Function tests of equipment (Vérification du fonctionnement du matériel) 48. Function tests of equipment 48. Vérification du fonctionnement du matériel The licensee of a well shall ensure that Le titulaire d’une licence de puits doit veiller à ce que : (a) subject to paragraph (b), all blowout a) sous réserve de l’alinéa b), tous les obturateurs preventers, except those with blind rams, are anti-éruption, sauf ceux avec mâchoires à actuated once each day that operations are fermeture totale, soient actionnés une fois par carried out if jour pendant le forage dans les situations suivantes : Page 44 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 49. Article 49. (i) the drill string is out of the well bore, or (i) le train de forage est sorti du trou de sonde, (ii) the drill bit is within the casing; (ii) le trépan est à l’intérieur du tubage; (b) when the drill string referred to in paragraph b) lorsque le train de forage mentionné à l’alinéa (a) is not out of the hole and the drill bit is not a) n’est pas sorti du trou ou que le trépan ne se within the casing, all major components of the trouve pas à l’intérieur du tubage, tous les blowout prevention system, except the blind éléments principaux du bloc d’obturation, sauf rams, are actuated at least once every three les mâchoires à fermeture totale, soient days that well operations are carried out; actionnés au moins une fois tous les trois jours en cours de l’exploitation du puits; (c) the blind rams are actuated at least once each c) les mâchoires à fermeture totale soient time the drill string is removed from the well actionnées au moins une fois lorsque le train de bore; forage est retiré du trou de sonde; (d) auxiliary equipment that may be used for well d) le matériel accessoire pouvant être utilisé pour control, including the cementing equipment and le contrôle du puits, y compris le matériel et les lines, bulk tanks, choke manifold, degasser, conduites de cimentation, les réservoirs de inside drill pipe blowout preventer and mud stockage, le manifold d’engorgement, le mixing systems, is available and maintained for dégazeur, la vanne anti-éruption intérieure et instant use; les installations de malaxage des boues, soit bien entretenu et disponible en tout temps; (e) all firefighting and safety equipment required e) tout le matériel de sécurité et de lutte contre by these Regulations is inspected once each les incendies exigé par le présent règlement month to confirm that the equipment is soit inspecté une fois par mois afin de serviceable and in its proper physical location; confirmer qu’il est en bon état de and fonctionnement et placé à l’endroit approprié; (f) all safety cables attached to the kelly hose, f) tous les câbles de sécurité attachés au flexible tongs, weight indicator or other suspended d’injection, aux clés, au peson ou à tout autre equipment are inspected, properly secured and matériel suspendu soient inspectés, bien ancrés serviceable. et en bon état de fonctionnement. 49. Blowout prevention drills (Exercices de prévention d’éruption) 49. Blowout prevention drills 49. Exercices de prévention d’éruption The licensee shall ensure that, when practical, blowout Le titulaire de licence doit veiller à ce que, dans la prevention drills and flow check drills are performed by mesure du possible, chaque équipe de forage exécute each drill crew daily while the licensee is engaged in a tous les jours un exercice de prévention d’éruption et drilling operation. de vérification du régime d’écoulement, pendant toute la durée des travaux de forage. 50. Casing design generally (Conception du tubage) 50. Casing design generally 50. Conception du tubage (1) Any casing to be used in a well must be new pipe (1) Les tubes utilisés pour le tubage d’un puits or, subject to subsection (2), reconditioned pipe. doivent être neufs ou, sous réserve du paragraphe (2), reconditionnés. (2) Reconditioned pipe must not be used as casing (2) Aucun tube reconditionné ne peut être utilisé pour unless it has been inspected by a method directed or le tubage d’un puits à moins d’avoir été inspecté selon approved by the Chief Operations Officer and has been une méthode reconnue ou approuvée par le délégué found to have adequate strength for its intended aux opérations, et avoir été certifié comme ayant la purpose. résistance voulue pour l’application prévue. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 45 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 50. Article 50. (3) The casing to be installed on any well must be (3) Les tubages destinés à être mis en place dans un designed to withstand burst, collapse, tension, bending, puits doivent être conçus pour résister aux charges buckling or other stresses that are known to exist or d’éclatement, d’écrasement, de traction, de pliage, de that may reasonably be expected to exist. flambage et autres charges existantes ou que l’on peut raisonnablement prévoir. (4) The selection of any casing installed in a well must (4) Le choix des tubages à mettre en place dans un be based on the performance properties listed in the puits doit se faire en fonction des paramètres de American Petroleum Institute’s Bulletin on Performance résistance figurant dans le bulletin intitulé Bulletin on Properties of Casing, Tubing, and Drill Pipe (API Performance Properties of Casing, Tubing, and Drill Bulletin 5C2) or on any other standard provided for in Pipe, (API 5C2), publié par l’American Petroleum the directions of the Chief Operations Officer. Institute, ou de toute autre norme approuvée par le délégué aux opérations. (5) The minimum design factors used in the design of (5) Les coefficients de sécurité minimums à utiliser well casings must be dans la conception des tubages de puits doivent être : (a) for surface casing burst, a burst pressure in a) pour le tubage de surface, d’une pression kilopascals equal to five times the setting depth d’éclatement en kilopascals, égale à cinq fois la of the next casing string in metres; profondeur de pose en mètres de la prochaine colonne de tubage; (b) 1.0 for burst, for conductor casing, b) de 1,0 pour la pression d’éclatement du tubage intermediate casing, production casing and initial, de la colonne technique, de la colonne de liners; production et des tubages partiels; (c) 1.0 for collapse; and c) de 1,0 pour la pression d’écrasement; (d) 1.6 for tension. d) de 1,6 pour la traction. (6) The licence shall ensure that all casing and tubing (6) Le titulaire de licence doit veiller à ce que le tubage used in a well are designed et les tubes mis en place dans le puits soient conçus : (a) to permit the installation of artificial lift a) pour permettre la mise en place de matériel equipment whenever there is reason to believe d’ascension artificielle dans tous les cas où son that artificial lift equipment might be required emploi peut être nécessaire afin de maintenir in order to maintain flow rates and increase les débits et accroître la récupération totale du ultimate recovery from the pool; gisement; (b) to ensure the structural integrity of the casing b) pour résister aux conditions susceptibles and tubing; d’avoir un effet préjudiciable sur leur intégrité structurale; (c) with respect to sour wells, to meet the c) en ce qui concerne les puits corrosifs, pour requirements of sour service equipment; and qu’ils soient en conformité avec les exigences du matériel idoine au gaz acide; (d) to ensure that any forces that could result from d) pour faire en sorte que toute force résultant de injection of fluids into the annulus or from any l’injection de fluides dans l’espace annulaire ou other phenomena will not result in stresses that de tout autre phénomène n’engendrera pas des exceed the design stress limits of the casing. contraintes supérieures à la limite de résistance du tubage. Page 46 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 51. Article 51. 51. Casing design and burst pressures (Conception du tubage et résistance à la traction) 51. Casing design and burst pressures 51. Conception du tubage et résistance à l’éclatement Subject to subsection 32(3), the casing installed in a Sous réserve du paragraphe 32(3), la résistance à well must be designed to withstand burst pressures l’éclatement du tubage mis en place dans un puits doit using the following assumptions être calculée en fonction des hypothèses suivantes : (a) the maximum internal pressure in the a) la pression intérieure maximale dans le tubage conductor casing and surface casing is 22 initial et le tubage de surface est de 22 kPa/m kPa/m of depth to which it is run; de profondeur atteinte; (b) the maximum internal pressure in intermediate b) la pression intérieure maximale dans la colonne casing, production casing and liners is 11 technique, la colonne de production et le kPa/m of depth to which it is run, with no tubage partiel est de 11 kPa/m de profondeur allowance for external pressure. atteinte, sans prendre en compte la pression externe. 52. Casing design and collapse loading (Conception du tubage et résistance à la traction) 52. Casing design and collapse loading 52. Conception du tubage et résistance à l’écrasement (1) The casing to be installed on any well must be (1) La résistance à l’écrasement du tubage mis en designed to withstand collapse loading based on the place dans un puits doit être calculée en fonction des following assumptions hypothèses suivantes : (a) the hydrostatic head of the drilling fluid in a) la pression hydrostatique du fluide de forage which the casing is run acts on the exterior of agit sur l’extérieur du tubage à toutes les the casing at any given depth; profondeurs; (b) the conductor or permafrost casing and surface b) le tubage initial ou le tubage de pergélisol et le casing is completely empty; tubage de surface sont totalement vides; (c) the intermediate casing and other protective c) la colonne technique et tout autre tubage de casing is at least 50% empty; and protection sont au moins à moitié vides; (d) the casing used for production purposes is d) la colonne de production est totalement vide. completely empty. (2) For the purpose of subsection (1), the effect of axial (2) Pour l’application du paragraphe (1), il faut stresses on collapse resistance shall be taken into prendre en compte l’effet des efforts axiaux sur la account and determined in accordance with the résistance à l’écrasement. Ceux-ci sont calculés American Petroleum Institute’s Bulletin on Formulas conformément au document intitulé Bulletin on and Calculations for Casing, Tubing, Drill Pipe and Line Formulas and Calculations for Casing, Tubing, Drill Pipe Pipe Properties (API Bulletin 5C3). and Line Pipe Properties (API 5C3) de la American Petroleum Institute. 53. Casing design and tensile loading (Conception du tubage et résistance à la traction) 53. Casing design and tensile loading 53. Conception du tubage et résistance à la traction Well casing must be designed to withstand tensile La résistance à la traction du tubage dans un puits doit loading based on the following assumptions être calculée en fonction des hypothèses suivantes : (a) the weight of the casing is its weight in air; a) le poids du tubage est son poids dans l’air; and c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 47 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 54. Article 54. (b) the tensile strength of the casing is the yield b) la résistance à la traction du tubage est la strength of the casing wall or of the joint, moindre de la limite d’élasticité de la paroi du whichever is the lesser. tubage ou de son joint. 54. Casing liners (Tubages partiels) 54. Casing liners 54. Tubages partiels When casing liners are used in lieu of full casing Lorsque des tubages partiels sont utilisés plutôt que strings, the casing liner and the casing to which it is des colonnes de tubage complètes, le tubage partiel attached must together meet the relevant design ainsi que le tubage auquel il est rattaché doivent criteria set out in sections 50 to 53. ensemble répondre aux critères de conception applicables énoncés aux articles 50 à 53. 55. Casing program requirements (Exigences du programme de tubage) 55. Casing program requirements 55. Exigences du programme de tubage (1) When normal pressure conditions exist and (1) Dans des conditions normales de pression et en permafrost is absent or is present in consolidated l’absence de pergélisol ou en présence de pergélisol formations, the casing program must include consolidé, le programme de tubage doit prévoir : (a) conductor pipe or conductor casing, or both, a) la mise en place d’un tuyau guide et d’un set to a minimum depth of 20 metres to ensure tubage initial ou l’un ou l’autre de ceux-ci, à the return of drilling fluids while drilling to the une profondeur minimale de vingt mètres afin next casing setting depth; d’assurer le retour du fluide de forage pendant le forage à la profondeur de pose du tubage suivant; (b) surface casing set in a competent formation to b) la mise en place d’un tubage de surface dans a depth of une formation compétente à une profondeur: (i) not less than 150 metres; and (i) ni inférieure à 150 m; (ii) not more than four times the setting depth (ii) ni supérieure à la plus élevée des deux of the conductor pipe or casing or 500 valeurs suivantes : quatre fois la profondeur metres, whichever is greater; and du tuyau guide ou 500 m; (c) surface casing and intermediate casing set as c) la mise en place d’un tubage de surface et required to protect the well against anticipated d’une colonne technique adaptés pour protéger pressures or difficult well bore conditions to le puits contre les pressions prévues ou des conditions difficiles de forage de façon à : (i) ensure that at least 25% of the well bore is (i) assurer qu’au moins 25 % du trou de sonde cased at all times while drilling below the soit tubé pendant les travaux de forage sous previously set casing, and le tubage déjà en place, (ii) justify the casing set depth based on (ii) confirmer que la profondeur de mise en geological, engineering and pressure data place du tubage est fondée sur des données which meets the relevant casing design géologiques, techniques et de pression criteria set out in sections 50 to 53. répondant aux critères de conception applicables énoncés aux articles 50 à 53. (2) When normal pressure conditions exist and (2) Dans des conditions normales de pression et en permafrost is known or believed to exist in présence confirmée ou soupçonnée de pergélisol non unconsolidated formations, the casing program must, consolidé, le programme de tubage doit prévoir dans le in respect of an exploratory well, include cas d’un puits d’exploration : (a) conductor pipe or conductor casing set in a) la mise en place d’un tuyau guide ou d’un accordance with paragraph (1)(a); tubage initial en conformité avec l’alinéa (1)a); Page 48 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 56. Article 56. (b) permafrost casing set to a depth of 150 metres b) la mise en place d’un tubage de pergélisol à below ground level when permafrost occurs to une profondeur de 150 m sous le niveau du sol a depth greater than 150 metres; lorsque le pergélisol s’étend à une profondeur supérieure à 150 m; (c) surface casing that is at least 100 metres but c) la mise en place d’un tubage de surface à une not more than 300 metres below the base of profondeur s’étendant entre cent mètres et 300 the permafrost when permafrost occurs to a m sous la base du pergélisol lorsque celui-ci depth greater than 150 metres or that is set in s’étend à une profondeur supérieure à 150 m accordance with paragraph (1)(b) if permafrost ou selon les dispositions de l’alinéa (1)b) si le occurs to a depth of less than 150 metres; and pergélisol s’étend à moins de 150 m de profondeur; (d) intermediate casing set in accordance with d) la mise en place d’une colonne technique selon paragraph (1)(c). les dispositions de l’alinéa (1)c). 56. Protection of permafrost (Protection contre le pergélisol) 56. Protection of permafrost 56. Protection contre le pergélisol When conductor pipe is installed in permafrost, the Lorsqu’un tuyau guide est posé dans le pergélisol, annulus surrounding the conductor pipe must be l’espace annulaire autour de ce tuyau doit être isolé ou insulated or refrigerated to minimize, to the greatest réfrigéré afin de prévenir le plus possible, la extent practicable, any deterioration of the ground détérioration du sol en surface par la perturbation surface due to thermal disturbance of the permafrost. thermique du pergélisol. 57. Cementation as well control (Cimentation du tubage comme contrôle du puits) 57. Cementation as well control 57. Cimentation du tubage comme contrôle du puits (1) The licensee shall ensure that (1) Le titulaire de licence doit veiller à ce que les conditions suivantes soient respectées : (a) the cementation of casing and casing liners is a) la cimentation du tubage et du tubage partiel carried out in accordance with the program est réalisée conformément au programme specified in the conditions of the Well Licence; indiqué dans la licence de puits; (b) if practicable, fluid returns are visually b) les retours de fluide sont dans la mesure du observed during all cementation operations; possible surveillés de visu durant tous les and travaux de cimentation; (c) the cement rise in the annulus, based on c) la cote de la remontée du ciment dans l’espace observations made under paragraph (b) and on annulaire, observée aux termes de l’alinéa b) et the design data, is calculated and is recorded. selon les données de fabrication, est calculée à partir des coordonnées de forage et consignée. (2) The licensee shall ensure that when permafrost (2) Lorsqu’un tubage de pergélisol est utilisé, le casing is used, the annulus of the surface casing is titulaire de licence doit veiller à ce que l’espace sealed at the surface and suitable devices are fitted to annulaire autour du tubage de surface soit obturé en monitor and relieve any pressure that may accumulate surface et que soient posés des dispositifs convenables under the seal. de mesure et de neutralisation de la pression qui risquerait de s’accumuler sous l’obturation. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 49 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 58. Article 58. 58. Cement volume (Volume du ciment) 58. Cement volume 58. Volume du ciment (1) The volume of cement slurry used for the (1) Le volume de lait de ciment utilisé pour la cementation of any casing must be at least 30 % cimentation d’un tubage doit être d’au moins 30 % greater than the estimated annular volume to be filled supérieur au volume estimé de l’espace annulaire à unless that estimate is based on a reliable caliper log in remplir, à moins que ce volume ait été déterminé selon which case the volume must be at least 10 % greater une diagraphie de diamétrage fiable, auquel cas le than the estimated annular volume. volume injecté doit être d’au moins 10 % supérieur au volume de l’espace annulaire. (2) If there are indications during or after the (2) S’il constate au cours des travaux de cimentation completion of cementation that the casing is not ou à l’achèvement de ceux-ci que le tubage n’est pas properly cemented, the licensee shall determine the cimenté comme il se doit, le titulaire de licence doit effectiveness of the cement in the annulus and ensure vérifier les propriétés du ciment en place dans l’espace that any necessary remedial action is taken. annulaire et prendre toute mesure corrective qui s’impose. 59. Cementing of casing strings (Cimentation des colonnes de tubage) 59. Cementing of casing strings 59. Cimentation des colonnes de tubage (1) The slurry ratios, volumes and additives of the (1) La composition, le volume et les additifs du lait de cement to be used and the procedure to be followed in ciment utilisé et la technique de cimentation des the cementing of casing strings in a well must be colonnes de tubage adoptée doivent être conçus pour : designed to (a) prevent the movement of formation fluids in a) empêcher la remontée des fluides de par the casing-formation annuli or casing-casing l’annulaire entre le tubage et le trou ou annuli; l’annulaire inter tubes; (b) provide support for the casing; and b) fournir un soutien pour le tubage; (c) retard corrosion of the casing. c) retarder la corrosion du tubage. (2) The conductor casing and permafrost casing must (2) Le tubage initial et le tubage de pergélisol doivent be cemented, if practicable, from the shoe of the casing être cimentés, si possible, à partir du sabot de tubage to the surface of the well. jusqu’à la surface du puits. (3) Surface casing must be cemented to the surface of (3) Le tubage de surface doit être cimenté jusqu’à la the well or to a depth that is not less than 25 metres surface du puits ou au moins à une profondeur de 25 above the base of any previous casing string. mètres au-dessus de la base du tubage précédent. (4) Intermediate casing must be cemented with (4) Le tubage de la colonne technique doit être cimenté sufficient cement to suffisamment pour : (a) isolate all formations containing oil, gas or a) isoler toutes les formations renfermant du potable water; pétrole, du gaz ou de l’eau potable; (b) isolate abnormally pressured intervals from b) isoler les couches à pression anormale des normally pressured intervals; couches à pression normale; (c) rise to a minimum of 300 metres above the c) s’élever à au moins 300 m au-dessus du sabot casing shoe or 150 metres above the base of de tubage ou 150 m au-dessus de la base du the permafrost; and pergélisol; (d) if practicable, rise to a minimum of 25 metres d) dans la mesure du possible, s’élever à au above the shoe of the previous casing. moins 25 m au-dessus du sabot du tubage précédent. Page 50 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 60. Article 60. (5) Production casing must be cemented with sufficient (5) Le tubage de la colonne de production doit être cement to cimenté avec suffisamment de ciment pour : (a) isolate all formations containing oil, gas or a) isoler toutes les formations renfermant du water to a minimum of 60 metres above those pétrole, du gaz ou de l’eau à une profondeur formations; minimale de 60 m au-dessus de ces formations; (b) isolate abnormally-pressured intervals from b) isoler les couches à pression anormale des normally-pressured intervals; and couches à pression normale; (c) ensure that any forces that could result from c) faire en sorte que toute force résultant de injection of fluids into the annulus or from any l’injection de fluides dans l’espace annulaire ou other phenomena will not result in stresses that de tout autre phénomène n’engendrera pas des exceed the design stress limits of the casing. contraintes supérieures à la résistance nominale limite du tubage. (6) If practicable, every casing liner must be cemented (6) Si possible, tout tubage partiel doit être cimenté for its full length. sur toute sa longueur. 60. Waiting on cement time (Prise du ciment) 60. Waiting on cement time 60. Prise du ciment The licensee shall ensure that the cement attains a Après la cimentation d’un tubage, le titulaire de licence minimum compressive strength of 3,500 kPa before the doit veiller à ce que le ciment atteigne une résistance à resumption of drilling after cementation of any casing, la compression d’au moins 3 500 kPa avant la reprise with the waiting time to attain that strength being no du forage et la période d’attente pour le laisser less than 12 hours. atteindre cette résistance ne soit en aucun cas inférieure à douze heures. 61. Pressure tests of casing (Essais sous pression du tubage) 61. Pressure tests of casing 61. Essais sous pression du tubage (1) The licensee shall ensure that casing is (1) Le titulaire de licence doit veiller à ce que le pressure-tested tubage soit vérifié sous pression : (a) after installation and prior to drilling out plugs, a) après sa mise en place et avant le reforage des floats, stage equipment or casing shoes; bouchons, flotteurs, matériel d’étage ou sabots de tubage; (b) immediately after any remedial cementing; b) immédiatement après toute cimentation de reprise; (c) at least once every 1,000 rotating hours or c) au moins une fois toutes les mille heures de more frequently rotation ou plus fréquemment : (i) when industry standards require, or (i) soit lorsque les normes industrielles axées sur la sécurité l’exigent, (ii) when casing wear is detected; and (ii) soit lorsqu’on constate une usure excessive du tubage; (d) immediately prior to perforating or using the d) immédiatement avant de perforer le tubage ou casing for purposes of formation flow testing. de l’utiliser à des fins d’essai d’écoulement de formation. (2) The licensee shall ensure that (2) Le titulaire de licence doit veiller à ce que les conditions suivantes soient respectées : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 51 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 62. Article 62. (a) surface casing, intermediate casing and a) le tubage de surface, le tubage de la colonne intermediate liners are pressure-tested to a technique et les tubages partiels intermédiaires surface pressure that is equal to or greater soient vérifiés sous une pression de surface than the least of égale ou supérieure à la moindre de : (i) the rated working pressure of the blowout (i) la pression de marche nominale des preventers, obturateurs anti-éruption, (ii) 40 % of the maximum formation pressure (ii) 40 % de la pression maximale de formation anticipated during the next phase of the prévue durant la phase suivante des travaux, operation, and (iii) the calculated formation fracture pressure at (iii) la pression calculée de fracturation de la the casing shoe; and formation au niveau du sabot de tubage; (b) production casing and production liners are b) le tubage de la colonne de production et les tested to a surface pressure that is equal to the tubes crépinés soient vérifiés sous une pression maximum formation pressure. de surface égale à la pression maximale de formation. (3) For any casing pressure test to be satisfactory, the (3) Une épreuve de pression de tubage est jugée test pressure prescribed in subsection (2) shall be réussie lorsque la pression d’épreuve prescrite au maintained for five minutes with no pressure decline paragraphe (2) est maintenue intégralement pendant or 15 minutes with a pressure decline of less than 5% cinq minutes ou avec une baisse de moins de 5 % of the test pressure. pendant quinze minutes. (4) The licensee shall notify the Minister when (4) Le titulaire de licence doit informer le ministre dès excessive casing wear is suspected and shall conduct a qu’il soupçonne une usure excessive du tubage et doit pressure test on the request of the Chief Operations soumettre celui-ci à une épreuve de pression sur Officer. demande du délégué aux opérations. (5) When a casing string does not hold the required (5) Lorsque la colonne de tubage ne maintient pas la pressure throughout its length, the Chief Operations pression prescrite sur toute sa longueur, le délégué aux Officer may direct that opérations peut exiger que, selon le cas : (a) drilling or testing operations be suspended; a) le forage ou les essais soient abandonnés provisoirement; (b) drilling be terminated at a particular depth; or b) le forage soit arrêté à une profondeur donnée; (c) precautions or remedial measures be taken c) des précautions ou des mesures correctives before drilling or testing operations are soient prises avant de poursuivre le forage ou continued. les essais. 62. Formation flow testing equipment (Matériel pour essais d’écoulement de formation) 62. Formation flow testing equipment 62. Matériel pour essais d’écoulement de formation (1) Any equipment used in a formation flow test must (1) Il faut que le matériel utilisé dans les essais have the capacity to d’écoulement de formation puisse : (a) reverse circulate the test string; a) inverser la circulation de fluides dans le train de tiges d’essai; (b) conduct the flow from the well through the b) diriger l’écoulement du puits vers un manifold surface control valve to a surface choke d’engorgement en surface en passant par la manifold; and vanne de contrôle de surface; Page 52 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 63. Article 63. (c) treat, store, burn or otherwise dispose of the c) traiter, stocker, brûler ou éliminer d’une autre fluids produced during the testing operation. façon les fluides produits au cours de l’essai. (2) The rated working pressure of formation flow test (2) La pression de marche nominale du matériel pour equipment and related equipment must be equal to or les essais d’écoulement de formation ainsi que du greater than the maximum anticipated shut-in matériel connexe doit être égale ou supérieure à la formation pressure. pression statique maximale prévue de la formation fermée. (3) The formation flow test equipment referred to in (3) Le matériel pour les essais d’écoulement de subsection (1) must include a downhole safety valve formation visé au paragraphe (1) doit comprendre une that permits closure of the test string above the vanne de sécurité de fond qui permet la fermeture du packer. train de tiges d’essai au-dessus de la garniture d’étanchéité. 63. Formation leak-off test (Essai de pression de fuite) 63. Formation leak-off test 63. Essai de pression de fuite (1) The licensee shall conduct a formation leak-off (1) Le titulaire de licence doit mener un essai de test in the well bore to determine the fracture integrity pression de fuite dans le trou de sonde afin de of the formation prior to drilling more than 10 metres déterminer la résistance à la fracturation de la below the shoe of any casing other than the conductor formation avant de forer à une profondeur de plus de casing. dix mètres au-dessous du sabot de tout tubage autre que le tubage initial. (2) The test referred to in subsection (1) must test the (2) L’essai mentionné au paragraphe (1) doit formation to a pressure at which the formation begins soumettre la formation à une pression d’admission de to accept fluid prior to the point of fracturing. fluide dans la formation antérieur au point de fracturation. (3) When the test is made on an exploratory well and (3) Lorsque la pression de fuite dans la formation shows that the formation leak-off gradient is less traversée par un puits d’exploration est inférieure à than 15 kPa/m, the licensee shall notify the Minister of quinze kilopascals par mètre, le titulaire de licence doit the gradient by the end of the day following the day on signaler la valeur mesurée au ministre avant la fin de which the test is completed and must not proceed with la journée qui suit celle où l’essai a été mené, et ne doit the drilling operation until oral approval has been given pas poursuivre les travaux de forage avant que le by the Chief Operations Officer. délégué aux opérations ne lui en donne l’autorisation verbale. 64. Monitoring of drilling (Contrôle du forage) 64. Monitoring of drilling 64. Contrôle du forage (1) The licensee shall ensure that (1) Le titulaire de licence doit veiller à ce que les conditions suivantes soient respectées : (a) the rate of the penetration of the formations a) la vitesse de pénétration des formations through which the well is drilled is recorded traversées par un puits est enregistrée en continuously while drilling or coring by an continu en cours de forage ou de carottage par automatic device located on the drill floor; un dispositif automatique situé sur le plancher de forage; (b) the drilling fluid and the drilling fluid system b) le système de circulation du fluide de forage est are maintained and operated in such a manner entretenu et réglé pour que le fluide de forage as to prevent formation fluids entering or empêche les fluides de formation d’entrer dans leaving the well bore except under controlled le trou de sonde ou d’en sortir, sauf en conditions; conditions contrôlées; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 53 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 4 PARTIE 4 Section 64. Article 64. (c) drilling ceases and remedial measures are c) le forage est interrompu et des mesures undertaken immediately when the hydrostatic correctives sont prises dès que la pression head of the drilling fluid fails to overbalance the hydrostatique du fluide de forage ne suffit plus formation fluid pressure, except when drilling à contenir la pression des fluides de formation, in an underbalanced condition has been sauf lorsque le délégué aux opérations a approved by the Chief Operations Officer; and autorisé le forage en dépression; (d) except while drilling the well bore for the d) sauf au moment du forage du trou de sonde conductor casing, pour la mise en place du tubage initial: (i) drilling ceases immediately when lost (i) le forage est immédiatement interrompu circulation occurs to the extent that the well lorsque la perte de circulation est telle que le bore cannot be kept full of drilling fluid, and trou de sonde ne peut être tenu rempli de fluide de forage, (ii) drilling is not resumed until adequate (ii) le forage n’est relancé qu’au rétablissement circulation has been regained or until d’une circulation appropriée ou après approval has been obtained from the Chief autorisation expresse du délégué aux Operations Officer. opérations. (2) The fluid content and the characteristics of the (2) Le contenu fluide et les caractéristiques lithology of the formations being drilled must be lithologiques des formations forées doivent être continuously monitored during any exploratory drilling constamment surveillés au cours d’un forage and the monitoring techniques must be such that the d’exploration et les techniques de surveillance doivent pressure transition zone between normally and permettre la détection de la zone de transition entre abnormally pressured formations can be detected. une couche à pression normale et une couche à pression anormale. (3) The licensee shall, when a pressure transition zone (3) Le titulaire de licence doit, à la détection d’une is detected, zone de transition : (a) cease drilling; a) interrompre le forage; (b) attempt to verify the presence of the zone; and b) chercher à confirmer la présence de cette zone; (c) take such measures as are necessary to control c) prendre les mesures nécessaires pour contenir the anticipated pressures before drilling is les pressions prévues avant de reprendre le resumed. forage. (4) When, on the basis of seismic or other data and of (4) Lorsque les données sismiques ou autres et le the results observed during the drilling of the well, the résultat des observations en cours de forage d’un puits existence of an over-pressured zone is indicated to be indiquent l’existence d’une zone de surpression dans within the next 100 metres of drilling, the Chief les cent prochains mètres à forer, le délégué aux Operations Officer may, in the interest of safety, opérations peut, par mesure de sécurité, imposer la prescribe the rate of penetration for further drilling. vitesse de pénétration du trépan à adopter pour la suite des travaux. (5) During tripping and except as provided under (5) Durant la descente et la remontée des tiges et sous subsection (3), the licensee shall ensure that the well is réserve du paragraphe (3), le titulaire de licence doit filled with a volume of drilling fluid equivalent to the veiller à ce que le puits soit rempli d’un volume de volume of drill pipe removed after every fifth stand of fluide de forage équivalent au volume de tiges de drill pipe is withdrawn or the volume of drill collars forage retirées, après le retrait soit de chaque after every stand of drill collars is withdrawn, as the ensemble de cinq longueurs de tiges de forage, soit de case requires. chaque longueur de masses-tiges. Page 54 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 5 PARTIE 5 Section 65. Article 65. (6) A record of the theoretical and actual fill-up (6) Un registre de tous les volumes de remplissage volumes of trips must be kept on the well site during théoriques et réels de manœuvre doit être tenu sur le the drilling operation. chantier du puits pour la durée des travaux de forage. 65. Directional and deviation surveys (Etudes de déviation et de direction) 65. Directional and deviation surveys 65. Etudes de déviation et de direction (1) The licensee of a well shall ensure that deviation (1) Le titulaire d’une licence de puits doit veiller à ce surveys are taken at intervals not exceeding 150 que les études de déviation soient réalisées à metres or at the intervals referred to in the conditions intervalles ne dépassant pas 150 m ou à celles of the Well Licence. indiquées comme condition de la licence de puits. (2) Directional surveys must be taken at sufficiently (2) Dans le forage d’un puits vertical, les mesures frequent intervals during the drilling of a vertical well directionnelles doivent être réalisées à intervalles to permit the location of any point in the well bore to suffisamment rapprochés afin de permettre de situer à be calculated within 15 metres of its actual location. quinze mètres près de son emplacement réel, un point quelconque du trou de sonde. (3) Except in the case of a relief well, the licensee shall (3) Sauf dans le cas d’un puits d’intervention, le ensure that a well is drilled in such a manner that it titulaire de licence doit veiller à ce que le puits soit foré does not intersect an existing well. de manière à ne jamais entrecouper un puits existant. (4) The Chief Operations Officer may refuse to approve (4) Le délégué aux opérations peut refuser d’approuver a directional survey program for a deviated or un programme de mesures directionnelles touchant un horizontal well unless the Chief Operations Officer is puits dévié ou horizontal à moins qu’il soit d’avis qu’un satisfied that the program will enable the location of tel programme permettra le calcul de l’emplacement de any point in the well bore to be calculated. quelconque point du trou de sonde. (5) On request of the Chief Operations Officer, the (5) À la demande du délégué aux opérations, le licensee shall ensure that a deviation survey is taken titulaire de licence doit faire en sorte qu’une étude de prior to installing a casing string in the well or before déviation soit menée avant la mise en place d’une placing the well on production. colonne de tubage dans le puits ou la mise en production du puits. PART 5 (PARTIE 5) PART 5 PARTIE 5 ELECTRICAL EQUIPMENT (MATÉRIEL ÉLECTRIQUE) ELECTRICAL EQUIPMENT MATÉRIEL ÉLECTRIQUE 66. Definitions for Part 5 (Définitions) 66. Definitions for Part 5 66. Définitions In this Part, Les définitions qui suivent s’appliquent à la présente partie. “Canadian Electrical Code” means the Canadian « Code canadien de l’électricité » Désigne le Code Electrical Code published by the Standards Council of canadien de l’électricité publié par le Conseil canadien Canada; « Code canadien de l’électricité » des normes. “Canadian Electrical Code” “Code for Electrical Installations at Oil and Gas « Code for Electrical Installations at Oil and Gas Facilities (Alberta)” means the Code for Electrical Facilities (Alberta) » Désigne le Code for Electrical Installations at Oil and Gas Facilities published by the Installations at Oil and Gas Facilities (Alberta) publié Safety Codes Council (Alberta). « Code for Electrical par le Safety Codes Council de l’Alberta. “Code for Installations at Oil and Gas Facilities (Alberta) » Electrical Installations at Oil and Gas Facilities (Alberta)” c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 55 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 5 PARTIE 5 Section 67. Article 67. 67. Electrical installations for drilling and well operations (Installations électriques pour travaux de forage ou exploitation d’un puits) 67. Electrical installations for drilling and well 67. Installations électriques pour travaux de operations forage ou exploitation d’un puits (1) All electrical installations for wells and field (1) Les installations électriques d’un puits ou d’une facilities, including those for drilling operations and installation de champ, y compris celles utilisées pour well operations, must comply with the requirements of les travaux de forage ou l’exploitation d’un puits, the Canadian Electrical Code and the Code for Electrical doivent être conformes aux exigences du Code Installations at Oil and Gas Facilities (Alberta). canadien de l’électricité et du document intitulé Code for Electrical Installations at Oil and Gas Facilities (Alberta). (2) Hazardous location classifications for wells and (2) Les classifications d’emplacements dangereux pour field facilities, including those for drilling operations les puits et installations de champ, y compris celles and well operations, are the classifications prescribed pour les travaux de forage ou l’exploitation d’un puits, by or pursuant to the Canadian Electrical Code and the sont celles indiquées dans le Code canadien de Code for Electrical Installations at Oil and Gas Facilities l’électricité et le document intitulé Code for Electrical (Alberta). Installations at Oil and Gas Facilities (Alberta), ou se font selon ces classifications.
Part document.segment-6
Oil and Gas Drilling and Production Regulations — segment 6
- document.segment-6 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 6
AI-assisted research summary: This part sets safety rules for oil and gas well electrical equipment and well operations, including clearances, grounding, warning signs, blowout prevention equipment, testing, and special safety valves.
(3) Electrical generators must not be placed within 25 (3) Les générateurs électrogènes ne doivent pas être metres of any source of ignitable vapours. placés à moins de 25 m d’une source de gaz inflammables. (4) Motors and motor controls which are provided with (4) Les moteurs et les commandes de moteurs positive pressure air or inert gas purge systems are comportant un système de balayage ou de vidange exempt from subsection (3). automatique à surpression d’air ou de gaz inerte ne sont pas assujettis aux dispositions du paragraphe (3). (5) Purged traction motors must be protected against (5) Les moteurs de traction ayant été purgés de leur entry of any spray of water into the motor. pression doivent être protégés contre toute introduction d’eau sous pression. (6) Every positive pressure purge system must comply (6) Tout système de balayage ou de vidange with the Canadian Electrical Code and must automatique à surpression doit être conforme aux exigences du Code canadien de l’électricité, et doit : (a) be constructed to prevent escape of molten a) être conçus pour empêcher toute fuite de metal particles or sparks; particules métalliques en fusion ou d’étincelles; (b) be provided with a positive pressure of at b) être muni d’une surpression d’au moins 2,54 least 2.54 centimetres of water; centimètres de colonne d’eau; (c) accommodate a mechanical, pneumatic or c) comporter une alarme à commande electric alarm system that is audible or visible mécanique, pneumatique ou électrique sonore or both to announce the failure of purge et visuelle, ou l’un ou l’autre, servant à signaler pressure within the system; toute chute de pression de balayage ou de vidange automatique à l’intérieur du système; (d) if the purge pressure alarm system is electric, d) s’il est doté d’un système d’alarme électrique, bear evidence of meeting the minimum porter le sceau d’approbation d’un organisme standards for hazardous locations as approved d’essai reconnu par le Conseil des normes du by a qualified testing agency accredited by the Canada et accepté par l’inspecteur en chef du Standards Council of Canada and accepted by gouvernement, prouvant qu’il répond aux the chief electrical inspector of the normes minimales relatives aux emplacements Government; dangereux; Page 56 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 5 PARTIE 5 Section 68. Article 68. (e) be constructed to prevent the external surfaces e) être conçu pour empêcher que la température of purged enclosures or motors and the purge des parois extérieures des enceintes ou des egress from exceeding 200° C; and moteurs à balayage de sécurité ainsi que des sorties d’échappement ne dépasse 200 °C; (f) if the system uses air purge, include an air f) s’il est du type à pression d’air, comporter un drying system as part of the purge system and déshydrateur avec prise de compresseur située have its compressor intake located in an area à un endroit qui n’est pas considéré comme other than a hazardous location. dangereux. (7) Wiring of frequently removed equipment, such as (7) Les appareils qui sont fréquemment enlevés, pressure switches, must be connected by means of comme les pressostats, doivent être raccordés au Type S or equivalent flexible cord of as short a length moyen d’un cordon souple de type S ou l’équivalent, de as is practicable, and a ready means of connection and la longueur la plus courte possible, muni d’un disconnection of flexible cords must be provided by the connecteur rapide approuvé pour les emplacements use of cord-connectors or fittings approved for the dangereux pertinents visés au paragraphe (2). relevant hazardous location referred to in subsection (2). 68. Grounding and bonding (Mise à la terre et mise à la masse) 68. Grounding and bonding 68. Mise à la terre et mise à la masse Grounding and bonding must comply with the Canadian La mise à la terre et la mise à la masse doivent être Electrical Code and the Code for Electrical Installations réalisées selon le Code canadien de l’électricité et le at Oil and Gas Facilities (Alberta), subject to the document intitulé Code for Electrical Installations at Oil following additional requirements and Gas Facilities (Alberta) sous réserve des exigences supplémentaires suivantes : (a) the non-current-carrying parts of electrical a) les pièces non conductrices du matériel equipment must be bonded to the main électrique doivent être jointes à la prise de ground; and terre principale du système; (b) the neutral conductor of supply circuits must b) le conducteur neutre des circuits d’alimentation not be used for bonding of non-current- ne doit pas servir à joindre les pièces non carrying metal parts of equipment. conductrices du matériel. 69. Power lines (Lignes d’alimentation électrique) 69. Power lines 69. Lignes d’alimentation électrique (1) If a power line of less than 750 volts between (1) Lorsqu’une ligne d’alimentation électrique de conductors is adjacent to a well, the horizontal moins de 750 volts aux bornes des conducteurs est clearance from the pole line to the well must be attenante à un puits, l’espacement horizontal entre la ligne de poteaux et le puits doit être l’une ou l’autre des valeurs suivantes : (a) a minimum of 10 metres between the dead end a) d’au moins dix mètres entre le support structure and the well if the overhead power d’ancrage et le puits, si la ligne aérienne se line is in line with the well; or trouve alignée avec le puits; (b) a minimum of 25 metres between the line and b) d’au moins 25 m entre la ligne et le puits, the well, measured at a right angle to the line, mesuré à angle droit de la ligne, si la ligne if the overhead line passes by the well, except aérienne passe par le puits, mais cet that this clearance may be reduced to espacement peut être réduit : (i) not less than 10 metres plus the ground (i) jusqu’à au moins dix mètres plus le clearance of the line, if approval is obtained dégagement entre le sol et la ligne, avec from the Chief Operations Officer, or approbation du délégué aux opérations, c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 57 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 5 PARTIE 5 Section 70. Article 70. (ii) not less than 10 metres, if the line is guyed (ii) jusqu’à au moins dix mètres, si la ligne est away from the well and the distance haubanée loin du puits et qu’il est impossible required is not obtainable and if approval is de respecter la distance requise, et qu’une obtained from the Chief Operations Officer; approbation est obtenue du délégué aux opérations. and in all other cases the horizontal clearance between Dans tous les autres cas, l’espacement horizontal entre any part of the well and the power line must be such toute partie du puits et une ligne d’alimentation that if the power line were to fall towards the well, no électrique, doit être telle que si cette dernière tombait energized conductor will fall within 10 metres of the en direction du puits, aucun conducteur sous tension well or of any installation or equipment attached to the ne se retrouverait à moins de dix mètres de celui-ci ou well. de toute installation ou de tout matériel y rattaché. (2) Pole lines must not cross over hazardous locations, (2) Aucune ligne d’alimentation électrique aérienne ne and horizontal clearance of pole lines passing doit passer au-dessus d’un emplacement dangereux, et hazardous locations must be maintained so that if the l’espacement horizontal doit être maintenu entre la pole line were to fall toward the hazardous location, no ligne et l’emplacement dangereux, pour qu’aucun energized conductor will fall or come within 5 metres conducteur sous tension ne se retrouve à moins de cinq of the location limitations. mètres des limites de l’emplacement en question advenant la chute de la ligne d’alimentation électrique en direction de l’emplacement en question. 70. Warning signs (Panonceaux d’avertissement) 70. Warning signs 70. Panonceaux d’avertissement A warning sign must be posted on any electrical Un panonceau d’avertissement portant la même equipment that is automatically controlled, with inscription ou une inscription similaire à celle indiquée wording the same as or similar to the following: ci-après doit être apposé sur tout appareil électrique muni d’une commande automatique : WARNING AVERTISSEMENT This equipment is automatically controlled and the Cet appareil est assujetti à une commande main switch must be disconnected before work is automatique. Il faut couper le courant à done on the equipment. l’interrupteur principal avant de procéder à des travaux sur cet appareil. 71. Well site cabins and trailers (Baraquement de chantier) 71. Well site cabins and trailers 71. Baraquement de chantier (1) Each cabin or trailer at a well site must have a (1) Un interrupteur de branchement et un panneau switch and branch circuit panel approved by a qualified de dérivation approuvé ou un appareillage ou des testing agency accredited by the Standards Council of disjoncteurs équivalents portant le sceau d’approbation Canada or an equivalent approved assembly or circuit d’un organisme d’essai reconnu par le Conseil des breakers. normes du Canada doivent être prévus pour les caravanes et les maisons mobiles aménagées sur le chantier d’un puits. (2) The service conductors must normally be run with (2) Les conducteurs de branchement doivent être Type S cabtire cable terminating in a polarized female acheminés sous cordon en caoutchouc de type S à plug cap of adequate current-carrying capacity for the bouts en fiches polarisées d’une capacité conductrice cabin or trailer load, and at each such receptacle, suffisante pour alimenter les caravanes et les maisons provision must be made to prevent strain on the supply mobiles du chantier, et conçues pour qu’aucune cord from being transmitted to the connection between contrainte imposée aux conducteurs ne soit transmise the plug of the supply cord and the receptacle. aux connexions. Page 58 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 72. Article 72. PART 6 (PARTIE 6) PART 6 PARTIE 6 WELL OPERATIONS, EQUIPMENT AND PROCEDURES (ÉQUIPEMENT DE PUITS) WELL OPERATIONS, EQUIPMENT AND ÉQUIPEMENT DE PUITS PROCEDURES 72. Variation of Part 6 requirements (Variations dans les exigences de la partie 6) 72. Variation of Part 6 requirements 72. Variations dans les exigences de la partie 6 The Chief Operations Officer may, in respect of a Le délégué aux opérations peut, en ce qui concerne un particular well, vary any of the requirements of this puits en particulier, modifier une ou plusieurs des Part or exempt the licensee from compliance with any exigences de la présente partie ou exempter le titulaire of the requirements of this Part pursuant to a request de licence de l’observation de l’une ou plusieurs for the variation or exemption contained in the exigences de la présente partie par suite d’une application for the Well Operation Approval or at any demande de modification ou d’exemption comprise time, if the Chief Operations Officer is satisfied that the dans la demande d’autorisation d’exploitation d’un variation or exemption is necessary or warranted in the puits ou en tout temps, s’il est d’avis que la circumstances. modification ou l’exemption est nécessaire ou justifiée dans les circonstances. 73. Well completion and servicing (Achèvement et entretien de puits) 73. Well completion and servicing 73. Achèvement et entretien de puits When completing or servicing a well, the licensee of the Lorsqu’il procède à l’achèvement ou à l’entretien d’un well shall ensure puits, le titulaire de la licence de puits doit veiller à ce que les conditions suivantes soient respectées : (a) that each formation interval in which the well is a) chaque couche productive visée par les travaux completed is isolated from any other porous or d’achèvement soit isolée de toute autre couche permeable interval penetrated by the well; poreuse ou perméable traversée par le puits; (b) the safe and efficient testing and production of b) toute couche productive visée par les travaux any formation interval in which the well is d’achèvement soit essayée et mise en completed; production de façon efficace et sûre; (c) when open-hole completion techniques are c) dans le cas d’un achèvement non tubé, la used, that production casing is set at a depth colonne de production soit mise en place à une that is not more than 60 metres above the top profondeur ne dépassant pas 60 m au-dessus of the productive interval; du niveau supérieur de la couche productive; (d) when cased-hole completion techniques are d) dans le cas d’un achèvement tubé, la colonne used, that production casing is set at a depth de production soit mise en place à une that provides a sump of at least 15 metres profondeur calculée pour laisser un puisard below the base of the productive interval; d’au moins quinze mètres au dessous du niveau inférieur de la couche productive; (e) that any packer required for the completion is e) toute garniture d’étanchéité exigée pour set as close as practicable to the top of the l’achèvement soit mise en place le plus près interval to be completed and that the packer is possible du niveau supérieur de la couche pressure-tested to a differential pressure that productive visée par les travaux d’achèvement is at least 4,000 kPa greater than the maximum et mise à l’épreuve sous une pression differential pressure anticipated under différentielle dépassant d’au moins 4 000 kPa la production conditions; pression différentielle maximale prévue dans les conditions de production; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 59 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 74. Article 74. (f) when stimulation of productive formations is f) lorsqu’il y a stimulation des couches done, that it is done in a manner that is safe productives, qu’elle se fasse par un procédé and that permits evaluation of production sécuritaire permettant d’évaluer les characteristics; and caractéristiques de production de la couche; (g) on the request of the Chief Operations Officer, g) qu’il y ait mesure et contrôle des entrées de that the amount of sand flowing into the well is sable dans le puits sur demande du délégué measured and controlled. aux opérations. 74. Well classification during well operations (Classification des puits lors de l’exploitation) 74. Well classification during well operations 74. Classification des puits lors de l’exploitation (1) For the purpose of well operation blowout (1) Pour l’application des exigences quant aux prevention system requirements, a well is classified as systèmes d’obturateurs anti-éruption d’exploitation de puits, les puits sont classifiés de la façon suivante : (a) a class I well if it is a gas well with a formation a) un puits est de classe I s’il s’agit d’un puits de pressure of less than 5,500 kPa and the well gaz ayant une pression de formation maximale effluent has no hydrogen sulphide; de 5 500 kPa dont l’effluent ne renferme aucun hydrogène sulfuré; (b) a class II well if the production casing flange b) un puits est de classe II si la pression nominale has a pressure rating of 21 MPa or less and the maximale de la bride de la colonne de well effluent has a hydrogen sulphide production est de 21 MPa et que l’effluent du concentration of less than 10 moles per puits renferme une concentration d’hydrogène kilomole; or sulfuré de moins de dix moles par kilomole; (c) a class III well if the production casing flange c) un puits est de classe III si la pression has a pressure rating of greater than 21 MPa or nominale de la bride de la colonne de the well effluent has a hydrogen sulphide production est supérieure à 21 MPa ou si concentration of 10 moles per kilomole or l’effluent du puits renferme une concentration greater. d’hydrogène sulfuré minimale de dix moles par kilomole (2) The Chief Operations Officer may vary the (2) Le délégué aux opérations peut modifier la classification of any well described in this section upon classification de tout puits visé dans le présent article application by the licensee or at any time if the Chief par suite d’une demande du titulaire de licence ou s’il Operations Officer considers it necessary to do so. est d’avis que cette mesure est nécessaire. (3) The licensee shall ensure that no well flows (3) Le titulaire de licence doit veiller à éviter uncontrolled during any well operation. l’écoulement non contrôlé d’un puits durant l’exploitation de celui-ci. 75. Well control equipment generally (Exigences générales relatives au contrôle des puits) 75. Well control equipment generally 75. Exigences générales relatives au contrôle des puits (1) The licensee of a well shall ensure that all well (1) Le titulaire d’une licence de puits doit veiller à ce control equipment for a well operation and the surface que tout le matériel de contrôle utilisé pendant equipment necessary for well testing l’exploitation d’un puits et le matériel de surface nécessaire aux essais du puits : (a) is installed in such a manner that it can a) soient mis en place de manière à ce qu’ils properly fulfil its function; puissent remplir correctement leurs fonctions; Page 60 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 76. Article 76. (b) is pressure-tested on installation and b) soient soumis à une épreuve de pression au periodically afterwards; moment de leur mise en place et périodiquement par après; (c) has sufficient structural strength to withstand c) possèdent une résistance structurale suffisante normal loading conditions associated with well aux sollicitations normales associées à operations; and l’exploitation d’un puits; (d) is designed to operate under all climatic d) soient conçus pour fonctionner dans toutes les conditions that may reasonably be anticipated conditions météorologiques prévisibles durant l’ to occur during the well operation. l’exploitation du puits. (2) The licensee shall ensure that the tubing hanger (2) Le titulaire de licence doit veiller à ce que l’olive de and all tubing and downhole equipment that is an suspension de la colonne de production et tout le integral part of a tubing string is designed to provide tubage et l’équipement de fond qui fait partie for sufficient resistance to burst, tension, collapse and intégrante de la colonne de production soient conçus buckling that may result from installation and pour offrir une résistance suffisante aux charges operational loads and from pressure and temperature d’éclatement, de traction, d’écrasement et de flambage differentials, so that production and maintenance susceptibles de se produire à la mise en place et en operations can be conducted in a safe and efficient cours d’exploitation ou de résulter des différences de manner. pression et de température, de sorte que les travaux de production et d’entretien puissent se dérouler en sécurité et de façon efficace. (3) Lighting must be adequate to ensure complete (3) L’éclairage doit permettre de voir clairement tout visibility of the well control equipment. le matériel de contrôle du puits. 76. Blowout prevention requirements for well operations (Exigences du bloc d’obturation pour l’exploitation d’un puits) 76. Blowout prevention requirements for well 76. Exigences du bloc d’obturation pour operations l’exploitation d’un puits (1) The licensee of a well shall ensure that a blowout (1) Le titulaire d’une licence de puits doit veiller à ce prevention system is installed during well operations qu’un système d’obturateurs anti-éruptions soit mis en that are carried out on a well that has the wellhead place durant l’exploitation d’un puits dont la tête de completely or partially removed. puits a été enlevée, en tout ou en partie. (2) A blowout prevention system installed pursuant to (2) Le système d’obturateurs anti-éruption mis en subsection (1) must place conformément au paragraphe (1) doit : (a) have a rated working pressure that is equal to a) avoir une pression de marche nominale égale or greater than the formation pressure or the ou supérieure à la moindre des valeurs pressure rating of the production casing flange, suivantes : la pression nominale de la bride du whichever is the lesser; and tubage de la colonne de production ou la pression de la formation; (b) consist of b) être formé : (i) blowout prevention equipment designed in (i) d’un obturateur anti-éruption conçu accordance with Schedule E, conformément aux exigences de l’annexe E, (ii) a control system, (ii) d’un dispositif de commande, (iii) an accumulator system and nitrogen (iii) d’un système d’accumulateur et d’un recharging system, dispositif de recharge à l’azote, (iv) a working spool, (iv) d’une bride d’ancrage en état de fonctionnement,, c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 61 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 77. Article 77. (v) a hydraulically-controlled remote valve, (v) d’un robinet à télécommande hydraulique, (vi) a kill line, (vi) d’une conduite de neutralisation, (vii) a pressure relief line, (vii) d’une conduite de détente de pression, (viii) a choke manifold, and (viii) d’un manifold d’engorgement, (ix) stabbing valves. (ix) de vannes d’intervention d’urgence. (3) Despite paragraph (2)(a), the pressure rating of (3) Malgré l’alinéa (2)a), la pression de marche any annular-type preventer must be greater than 50 % nominale de tous les obturateurs annulaires doit être of the maximum anticipated formation pressure but supérieure à 50 % de la pression maximale de need not exceed 35 MPa. formation prévue, sans dépasser 35 MPa. (4) A hydraulically-operated preventer must be capable (4) Un obturateur à commande hydraulique doit être of being activated from the service rig floor and from en mesure d’être activé à partir du plancher de forage one other physical location remote from the wellhead. de l’appareil d’intervention et à partir d’un autre endroit éloigné de la tête de puits; (5) Shear rams or combination shear/blind rams with (5) Le bloc d’obturation doit comporter des mâchoires a blanking tool are required if coupe-tige ou une combinaison de mâchoires coupantes et à fermeture totale avec outil de découpage si : (a) operations complexity and residential density a) les travaux d’achèvement ou de indicate a high level risk factor during a reconditionnement d’un puits sont assortis d’un completion or workover; or haut niveau de risque en raison de la complexité des travaux et de la proximité d’habitations nombreuses; (b) the Chief Operations Officer so orders. b) le délégué aux opérations l’exige. (6) The licensee shall ensure that (6) Le titulaire de licence doit veiller à ce que soient affichés dans l’abri de chantier: (a) standard well control procedures, and a)la marche à suivre standard pour le contrôle du puits; (b) when shear rams are used, the details of the b) lorsque l’on utilise des mâchoires coupe-tiges, shear ram operation, une description détaillée du fonctionnement de celles-ci. are posted in the doghouse. 77. Control system (Dispositif de commande) 77. Control system 77. Dispositif de commande (1) A control system referred to in (1) Le dispositif de commande mis en place subparagraph 76(2)(b)(ii) must consist of conformément au sous-alinéa 76(2)b)(ii) doit comporter : (a) a control panel whose functions are clearly a) un panneau de commande dont les éléments identified on it and in full view and within easy sont clairement identifiés, parfaitement visibles access of the operator’s station; and et facilement accessibles du poste du foreur; Page 62 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 78. Article 78. (b) a second control panel located in a readily b) b) un second panneau de commande situé dans accessible physical location that is remote from un endroit facilement accessible et protégé de the rig floor and at least 25 metres from the l’écoulement du puits, loin du plancher de wellhead and at which the panel is protected forage et à au moins 25 mètres de la tête de from the flow of the well. puits. (2) If a shear ram is used in addition to a blowout (2) Lorsqu’une mâchoire coupe-tige est utilisée en sus preventer, the control must be solely at the panel d’un obturateur anti-éruption, sa commande doit être referred to in paragraph (1)(a) to avoid accidental assurée exclusivement par le panneau de commande shear ram closure and, if the shear ram replaces the visé à l’alinéa (1)a) afin d’éviter les fermetures blind ram, the remote panel referred to in accidentelles de la mâchoire, et lorsque la mâchoire paragraph (1)(b) must operate the ram. coupe-tige est utilisée en remplacement d’une mâchoire à fermeture totale, sa commande doit être assurée depuis le panneau de commande éloigné visé à l’alinéa (1)b). (3) A service rig pump must not be used as a well (3) Il est interdit d’utiliser la pompe d’un appareil control manifold. d’intervention comme manifold de contrôle de puits. 78. Accumulator and recharging system (Accumulateur et dispositif de recharge) 78. Accumulator and recharging system 78. Accumulateur et dispositif de recharge (1) An accumulator system referred to in (1) Un système d’accumulateur mis en place subparagraph 76(2)(b)(iii) must conformément au sous-alinéa 76(2)b)(iii) doit : (a) be located in a readily accessible and protected a) être situé dans un endroit facilement accessible area at least 25 metres from the well; et protégé se trouvant à au moins 25 mètres du puits; (b) have sufficient useable fluid to effect full b) comporter une réserve de fluide suffisante pour closure of all of the blowout preventers, while fermer tous les obturateurs anti-éruption retaining a pressure of 8,400 kPa on the durant l’exploitation du puits, sans que la accumulator system with the recharge pump pression dans le système d’accumulateur ne off during well operations; chute en-deça de 8 400 kPa, avec la pompe de recharge arrêtée; (c) be connected to the blowout preventer with c) être raccordé à l’obturateur anti-éruption par lines of working pressure equal to the working des lignes de pression de marche égale à la pressure of the accumulator, with any line pression de marche de l’accumulateur, les located under the substructure of the rig being lignes situées sous l’infrastructure de l’appareil made of steel or sheathed with approved fire- de forage étant faites d’acier ou gainées de resistant sleeving; matériel résistant au feu; (d) be recharged by an automatic pressure- d) être rechargé par une pompe automatique à controlled pump that is capable of recovering in pression capable de récupérer en moins de cinq not more than five minutes any drop in the minutes, toute chute de pression dans pressure of the accumulator resulting from full l’accumulateur résultant de la fermeture totale closure of all of the blowout preventers; and de tous les obturateurs anti-éruption; (e) be capable of closing any ram-type blowout e) être en mesure de fermer tous les types preventer in not more than 30 seconds and any d’obturateurs à mâchoires en moins de trente annular-type blowout preventer in not more secondes et tous les types d’obturateurs than 60 seconds, using only the accumulator. annulaires en moins de 60 secondes, en utilisant seulement l’accumulateur. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 63 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 79. Article 79. (2) A nitrogen recharging system installed pursuant to (2) Un dispositif de recharge à l’azote mis en place subparagraph 76(2)(b)(iii) must conformément au sous-alinéa 76(2)b)(iii) doit : (a) be capable of closing all of the blowout a) être en mesure de fermer tous les obturateurs preventers installed on the well; and anti-éruption mis en place sur le puits; (b) be under a pressure of not less than 8,400 kPa. b) b) subir une pression égale ou supérieure à 8 400 kPa. 79. Kill lines and pressure relief lines (Conduites de neutralisation et conduites de détente de pression) 79. Kill lines and pressure relief lines 79. Conduites de neutralisation et conduites de détente de pression (1) A kill line and a pressure relief line referred to in (1) Une conduite de neutralisation visée au sous- subparagraphs 76(2)(b)(vi) and (vii) respectively must alinéa 76(2)b)(vi) ou une conduite de détente de pression visée au sous-alinéa 76(2)b)(vii) doit : (a) be securely tied down; a) être bien ancrée; (b) have a rated working pressure equal to or b) avoir une pression de marche nominale égale greater than the pressure rating of the blowout ou supérieure à celle des obturateurs anti- preventers; éruption; (c) be constructed of steel or flexible hose, and in c) être façonnée d’acier ou de tube flexible, et the case of flexible hose must be dans le cas d’un tube flexible : (i) flanged with factory-installed connections, (i) être bridées par des raccords préinstallés en usine, (ii) fire-resistant, (ii) être à l’épreuve du feu, (iii) of no smaller internal diameter than related (iii) avoir un diamètre intérieur au moins égal au equipment, diamètre intérieur du matériel auquel elle est raccordée, (iv) shop-serviced and shop pressure-tested (iv) être inspectée et éprouvée sous pression en every three years, atelier tous les trois ans, (v) marked so that the manufacturer can be (v) porter clairement la marque du fabricant, readily determined, and (vi) straight or with bends having a radius no (vi) être droite ou courbée avec un rayon au less than the manufacturer’s specified moins égal au rayon minimal de courbe minimum bending radius. suggéré par le fabricant. (2) The licensee shall ensure that all kill lines and (2) Le titulaire de licence doit veiller à ce que toutes les pressure relief lines are designed so that there is a conduites de neutralisation ou de détente de pression minimum number of changes in the direction of flow soient conçues pour qu’elles aient un tracé le plus and, when an abrupt change is necessary, the change rectiligne possible et que les coudes prononcés, s’il y en is protected against erosion. a, comportent une protection adéquate contre l’usure par frottement. Page 64 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 80. Article 80. 80. Choke manifold (Manifold d’engorgement) 80. Choke manifold 80. Manifold d’engorgement (1) A choke manifold referred to in (1) Le manifold d’engorgement mentionné au sous- subparagraph 76(2)(b)(viii) must alinéa 76(2)b)(viii) doit : (a) have a rated working pressure equal to or a) avoir une pression de marche nominale égale greater than the pressure rating of the blowout ou supérieure à celle des obturateurs anti- preventers; éruption; (b) have a check valve to prevent flow from the b) être muni d’un clapet de retenue afin de well to the rig pump; prévenir un écoulement du puits vers la pompe de l’appareil de forage; (c) have a pressure relief valve upstream of the c) être muni d’une soupape de décharge en check valve; and amont de la soupape de retenue; (d) be equipped with a pressure gauge. d) être muni d’un manomètre. (2) The inside diameter of all lines and valves (2) Le diamètre intérieur de toutes les conduites et comprising the choke manifold must be no less than 50 vannes formant le manifold d’engorgement doit être mm. égal ou supérieur à 50 millimètres. (3) The licensee shall ensure that during all well (3) Le titulaire de licence doit veiller à ce que l’on operations gauges sufficient in number to fit all gauge dispose en tout temps, durant l’exploitation d’un puits, outlets on the choke manifold are available for d’un nombre suffisant de manomètres pour équiper immediate installation. toutes les prises de pression du manifold d’engorgement. (4) The choke manifold must be protected against (4) Le manifold d’engorgement doit être protégé freezing. contre le gel. 81. Stabbing valves (Vannes d’intervention d’urgence) 81. Stabbing valves 81. Vannes d’intervention d’urgence (1) A stabbing valve referred to in (1) La vanne d’intervention d’urgence mentionnée au subparagraph 76(2)(b)(ix) must be a full-opening sous-alinéa 76(2)b)(ix) doit être une vanne stabbing valve that can be attached to the tubing or d’intervention d’urgence à passage intégral adaptée à other pipe in the well and must be maintained in the chaque type de raccordement du train de forage et doit open position in a readily accessible location. être maintenue en position ouverte, à un endroit immédiatement accessible depuis le puits de forage. (2) A stabbing valve (2) La vanne d’intervention d’urgence doit être conforme aux exigences suivantes : (a) must have a pressure rating equal to or greater a) elle doit avoir une pression nominale égale ou than the pressure rating of the blowout supérieure à celle des obturateurs anti- preventers; éruption; (b) must not be used as a working valve; and b) elle ne doit pas servir de vanne de manœuvre; (c) must be stored in an area immediately c) elle doit être rangée en position ouverte, accessible to the well bore, left in the open propre, bien entretenue, exempte de glace et position, and kept clean, properly maintained, prête à utiliser, à un endroit immédiatement ice-free and ready for use. accessible depuis le trou de sonde. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 65 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 82. Article 82. 82. Tests, maintenance and drills (Épreuves sous pression, entretien et entraînement ) 82. Tests, maintenance and drills 82. Épreuves sous pression, entretien et entraînement (1) Section 46 applies to the licensee of a well on (1) Les dispositions de l’article 46 s’appliquent au which a blowout preventer is installed for the purpose titulaire de licence d’un puits sur lequel est mis en of a well operation except that place un obturateur anti-éruption en vue de l’exploitation du puits, sauf que: (a) the reference in paragraph 46(1)(b) to the a) la mention à l’alinéa 46(1)b) de la date prévue estimated finished drilling date in the de fin de forage dans la demande de licence de application for the Well Licence shall be read as puits vaut mention de la date prévue a reference to the estimated date of completion d’achèvement des travaux dans la demande of the well operation in the application for the d’autorisation d’exploitation de ce puits; Well Operation Approval; and (b) the reference in paragraph 46(4)(a) to the b) la mention à l’alinéa 46(4)a) de l’entrepreneur drilling contractor shall be read as a reference en forage vaut mention d’entrepreneur to the service rig contractor. d’appareil d’intervention sur puits en production. (2) When a blowout preventer installed on a well for (2) Lorsqu’un obturateur anti-éruption mis en place the purpose of a well operation is pressure-tested, sur un puits en vue de l’exploitation de celui-ci est mis à l’épreuve sous pression: (a) section 47, except paragraph (1)(c), applies to a) les exigences de l’article 47, exception faite de the licensee in respect of the test; and l’alinéa (1)c), s’appliquent au titulaire de licence à l’égard de l’épreuve; (b) the licensee shall ensure that all blowout b) le titulaire de licence doit veiller à ce que tous preventer components are pressure-tested les composants de l’obturateur soient éprouvés to 1,000 kPa and to a minimum of 1.2 times sous une pression de 1 000 kPa et à au the well’s shut-in tubing pressure for 10 moins 1,2 fois la pression statique du tubage minutes each and that the components will pendant dix minutes sans donner lieu à des perform without leakage. fuites. (3) The licensee shall ensure that the christmas tree, (3) Après leur mise en place initiale et, si possible, production casing and tubing string are pressure- après chaque reconditionnement du puits, le titulaire tested after their initial installation and, if practicable, de licence doit veiller à ce que la tête d’éruption, le after every workover, and that the test in each case is tubage de production et la colonne de production soient done to the maximum pressure to which they are likely soumis à l’épreuve sous pression, à la pression to be subjected. maximale à laquelle ils sont susceptibles d’être exposés en cours de production. (4) When a well operation is conducted in respect of a (4) Lorsque se déroule l’exploitation d’un puits, le well, the licensee shall ensure that titulaire de licence doit veiller à ce que: (a) auxiliary equipment that may be used for well a) le matériel accessoire pouvant être utilisé pour control, including the bulk tanks, choke le contrôle du puits, y compris les réservoirs de manifold and degasser is available and stockage, le manifold d’engorgement et le maintained for instant use; dégazeur, soit bien entretenu et disponible en tout temps; (b) all firefighting and safety equipment required b) tous les dispositifs de sécurité et de lutte contre by these Regulations is available and is les incendies exigés par le présent règlement inspected each month to confirm that the soient disponibles et inspectés une fois par Page 66 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 83. Article 83. equipment is serviceable and in its proper mois afin de confirmer qu’ils sont en bon état physical location; and de fonctionnement et situés à l’endroit approprié; (c) all safety cables attached to the tongs, weight c) tous les câbles de sécurité attachés aux clés, au indicator or other suspended equipment are peson ou à tout autre matériel suspendu soient inspected, properly secured and serviceable. inspectés, bien ancrés et en bon état de fonctionnement. (5) When a well operation is conducted in respect of a (5) Lorsque se déroule l’exploitation d’un puits, le well, the licensee shall ensure that, if practical, blowout titulaire de licence doit veiller à ce que, dans la mesure prevention drills and flow check drills are performed by du possible, chaque équipe de forage exécute un the service rig crew during the well operation. exercice de prévention d’éruption et de vérification du régime d’écoulement, au courant de l’exploitation du puits. (6) Section 62 applies to a formation flow test (6) Les dispositions de l’article 62 s’appliquent à un conducted in the course of a well operation. essai d’écoulement de formation mené au courant de travaux relatifs à un puits. 83. Annulus between well tubulars (Espaces annulaires) 83. Annulus between well tubulars 83. Espaces annulaires The licensee of a well shall ensure that (1) Le titulaire d’une licence de puits doit veiller à ce que : (a) all production from and injection into the well, a) toute production d’un puits ou injection dans except production or injection of potable water un puits, exception faite de la production ou de or gas that is not sour gas, shall be through l’injection d’eau potable ou de gaz qui n’est pas tubing; acide, se fasse par le tubage; (b) before any fluid other than potable water is b) soient réunis les facteurs suivants, avant que injected to a subsurface formation through ne soit injecté dans le puits, vers une formation the well, souterraine, tout fluide autre que de l’eau potable : (i) a production packer is set in the well as (i) qu’une garniture d’étanchéité de production closely above the injection interval as is soit mise en place dans le puits, aussi près practicable, and que possible au-dessus de l’espace d’injection, (ii) the space between the tubing and outer steel (ii) que l’espace entre le tubage de production et casing is filled with corrosion inhibited la colonne de production soit rempli d’un liquid; liquide anti-corrosif; (c) if the well is required to have a packer for c) tous les puits dont l’espace annulaire entre le annular isolation, the packer is tested annually tubage de production et la colonne de for hydraulic isolation between the casing and production est isolé au moyen de garnitures tubing by an approved testing procedure; and d’étanchéité soient soumis à des épreuves annuelles d’étanchéité par une méthode approuvée; (d) the annual pressure test data is kept on file for d) les résultats des épreuves annuelles a period of five years from the date of the test d’étanchéité sous pression soient conservés for audit purposes. durant cinq ans de la date de l’épreuve pour fins de vérification. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 67 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 84. Article 84. 84. Subsurface safety valve (Vannes de sécurité de fond) 84. Subsurface safety valve 84. Vannes de sécurité de fond (1) The licensee of a well shall ensure that the well is (1) Le titulaire d’une licence de puits doit veiller à ce equipped with a surface-controlled subsurface safety que le puits soit équipé d’une vanne de sécurité de fond valve if the well is capable of flowing without artificial commandée depuis la surface s’il est en mesure de lift equipment and produire sans l’usage de matériel d’ascension artificielle et, selon le cas : (a) is within such a distance of an occupied a) la distance qui sépare le puits d’un bâtiment dwelling that the dwelling or its occupants habité est telle que, compte tenu du débit et de could be endangered by a blowout, having la pression statique du puits, une éruption regard to the flow rate and shut-in pressure of pourrait vraisemblablement mettre en danger the well; ce bâtiment ou ses occupants; (b) produces gas that has a hydrogen sulphide b) le gaz produit a une teneur en hydrogène content that exceeds 50 moles per kilomole by sulfuré supérieure à 50 moles par kilomole, en volume; or volume; (c) is located in an area in which there is an c) le puits est situé dans une zone où le risque unusually high risk of damage to the well or in qu’il soit endommagé est anormalement élevé, which damage to the environment resulting ou dans une zone où un déversement serait from a spill would be severe. très néfaste à l’environnement. (2) When a surface-controlled subsurface safety valve (2) Lorsqu’une vanne de sécurité de fond commandée is required under subsection (1) and the well is located depuis la surface est exigée en vertu du in an area where permafrost is present in paragraphe (1), et que le puits est situé dans une zone unconsolidated sediments, the licensee shall install a de pergélisol formé de sédiments non consolidés, le surface-controlled subsurface safety valve in the tubing titulaire de licence doit mettre en place, dans la at least 30 metres below the base of the permafrost. colonne de production, une vanne de sécurité de fond commandée depuis la surface, à une profondeur égale ou supérieure à 30 m sous la base du pergélisol. (3) The licensee of a well shall not operate the well (3) Le titulaire d’une licence de puits ne peut exploiter unless the specifications, design, installation, operation un puits que si les spécifications, la conception, la mise and testing of each surface-controlled subsurface safety en place, la mise en service et la mise à l’épreuve de valve installed on the well are in accordance with the chaque vanne de sécurité de fond commandée depuis American Petroleum Institute’s Specification for la surface dont est équipé le puits sont conformes à la Subsurface Safety Valve Equipment (API norme intitulée Specification for Subsurface Safety Specification 14A) and Design, Installation, Repair and Valve Equipment (dite API Specification 14A), et à la Operation of Subsurface Safety Valve Systems (API norme API RP 14B intitulée Design, Installation, Repair Recommended Practice 14B). and Operation of Subsurface Safety Valve Systems de l’American Petroleum Institute. (4) The licensee of a well shall ensure that every (4) Le titulaire d’une licence de puits doit veiller à ce surface-controlled subsurface safety valve installed in que toute vanne de sécurité de fond commandée the well is depuis la surface, installée dans un puits, soit : (a) pressure-tested immediately after installation; a) soumise à une épreuve de pression dès sa mise and en place; (b) function-tested at least once every six months b) soumise à un essai de fonctionnement au after the test referred to in paragraph (a). moins tous les six mois après la tenue de l’épreuve visée à l’alinéa a). Page 68 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 85. Article 85. (5) The licensee of a completed well shall, at the (5) À la demande du délégué aux opérations, le request of the Chief Operations Officer, install a titulaire d’une licence de puits doit mettre en place une surface-controlled subsurface safety valve in the well. vanne de sécurité de fond commandée depuis la surface dans tout puits achevé. 85. Wellhead and christmas tree (Têtes de puits et têtes d’éruption) 85. Wellhead and christmas tree 85. Têtes de puits et têtes d’éruption (1) The licensee of a well that is not abandoned shall (1) Le titulaire de licence d’un puits qui n’est pas ensure that the wellhead of the well is abandonné doit veiller à ce que la tête de puits soit : (a) protected against damage; and a) protégée contre tout dommage; (b) identified by a suitable sign. b) identifiée de façon convenable. (2) The licensee shall ensure that the wellhead and (2) Le titulaire de licence doit faire en sorte que la tête christmas tree on a completed well have a working de puits et la tête d’éruption mises en place dans un pressure that is greater than the maximum anticipated puits achevé soient conçus pour fonctionner à une pressure the wellhead is expected to encounter during pression de marche supérieure à la pression maximale the life of the well and in no case less that 21.0 MPa. prévue durant la vie du puits, et en aucun cas inférieure à 21 MPa. (3) The licensee of a well exposed to sour gas shall (3) Le titulaire de licence d’un puits exposé au gaz ensure that the wellhead and christmas tree are acide doit veiller à ce que la tête de puits et la tête designed and constructed in accordance with National d’éruption soient conçues et façonnées conformément à Association of Corrosion Engineers’ Sulfide Stress la norme NACE MR0175-2001 de la National Association Cracking Resistant Metallic Materials for Oilfield of Corrosion Engineers, intitulée Sulfide Stress Cracking Equipment (NACE Standard MR0175-2001). Resistant Metallic Materials for Oilfield Equipment.
Part document.segment-7
Oil and Gas Drilling and Production Regulations — segment 7
- document.segment-7 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 7
AI-assisted research summary: This segment requires well licensees to meet detailed safety, testing, evaluation, suspension, and abandonment rules, and gives the Chief Operations Officer some approval and information-gathering powers.
(4) The licensee of a well that has produced or is (4) Le titulaire de licence d’un puits ayant produit ou expected to produce fluids with a hydrogen sulphide susceptible de produire un effluent dont la teneur en concentration of 50 moles per kilomole or greater or hydrogène sulfuré s’élève à 50 moles par kilomole ou has a shut-in pressure greater than 21.0 MPa, must dont la pression statique est supérieure à 21 MPa, doit ensure that the well is equipped with two master veiller à ce que le puits soit équipé de deux vannes valves. maîtresses. (5) The licensee shall ensure that all production (5) Le titulaire de licence doit veiller à ce que tous les equipment end connections and valves comply with the connecteurs d’extrémités et les vannes du matériel de American Petroleum Institute’s production soient conformes aux normes suivantes de l’American Petroleum Institute : (a) API Specification for Fire Test for End a) la partie II de la norme API Spec 6FB, intitulée Connections (API Specification 6FB); and Specification for Fire Test for End Connections; (b) Specification for Fire Test for Valves (API b) la norme API Spec 6FA, intitulée Specification Specification 6FA). for Fire Test for Valves. (6) The licensee shall ensure that the wellhead and (6) Le titulaire de licence doit veiller à ce que la tête de christmas tree conform to the American Petroleum puits et la tête d’éruption soient conformes à la norme Institute’s Specification for Wellhead and Christmas API Specification 6A de l’American Petroleum Institute, Tree Equipment (API Specification 6A). intitulée Specification for Wellhead and Christmas Tree Equipment. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 69 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 86. Article 86. (7) The licensee of a producing well shall configure the (7) Le titulaire de licence doit aménager l’accès à annulus access on the well to allow monitoring and l’espace annulaire entre le tubage et la colonne de venting of pressure in the annulus between the production d’un puits en production de manière à production casing and tubing. permettre le contrôle et la détente de la pression dans l’espace annulaire. (8) The wellhead and christmas tree for a completed (8) La tête de puits et la tête d’éruption d’un puits well must be designed to have a means of determining achevé doivent être conçues pour permettre la lecture the pressure at the tubing-head and all annuli. de la pression en tête du tubage et dans tous les espaces ann. (9) The wellhead and christmas tree for a well must be (9) La tête de puits et la tête d’éruption d’un puits equipped with flanged connections. doivent être équipées de raccords à brides. 86. Surface casing vents and flows (Events et écoulement du tubage de surface) 86. Surface casing vents and flows 86. Events et écoulement du tubage de surface (1) Every well must have the annulus between the (1) L’espace annulaire entre la deuxième colonne et le second casing string and the surface casing open to the tubage de surface doit être relié à l’atmosphère par atmosphere and vented by a surface casing vent that une canalisation : (a) is a minimum 50 mm in diameter; a) ayant un diamètre minimal de 50 mm; (b) extends 60 cm above ground level; b) s’élevant à 60 cm au-dessus de la surface du sol; (c) is configured so that any flow is directed either c) configurée de manière à diriger l’effluent soit in a downward direction or parallel to the vers le bas, soit parallèlement au sol; ground; (d) is equipped with a valve when the hydrogen d) équipée d’une vanne lorsque la concentration sulphide concentration in a representative en hydrogène sulfuré du gaz produit, mesurée sample of gas from the well is found to dans un échantillon représentatif, est exceed 50 moles per kilomole; and supérieure à 50 moles par kilomole; (e) has all parts with a working pressure rating in e) où la pression de marche nominale, exprimée kilopascals of at least 25 times the numerical en kilopascals, de toutes les parties equivalent of the surface casing depth in constitutives de la mise à l’air libre de la metres. colonne de surface est d’au moins 25 fois la valeur numérique de la profondeur du tubage de surface, en mètres. (2) The licensee of a well shall ensure that the surface (2) Le titulaire d’une licence de puits doit veiller à ce casing vent is tested for any flow by an approved que la mise à l’air libre du tubage de surface soit method soumise à des essais d’échappement par une méthode approuvée: (a) within 90 days after the rig release date; a) dans les 90 jours de la date de retrait de l’appareil de forage; (b) prior to any workover or re-completion; b) antérieurement à tout reconditionnement ou remise en production; (c) yearly for five years once a flow is detected c) annuellement pendant cinq ans, une fois that does not fall within one of the categories constaté un écoulement qui n’est pas de ceux described in subsection (3); and visés au paragraphe (3); Page 70 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 86. Article 86. (d) prior to suspension or abandonment. d) antérieurement à l’abandon provisoire ou à l’abandon définitif du puits. (3) The licensee of a well shall repair a surface casing (3) Le titulaire de licence d’un puits doit réparer dans vent flow as soon as possible, and not later than 12 les plus brefs délais, et de toute façon dans les 12 mois months after discovery of the flow, if it exhibits de sa découverte, la mise à l’air libre du tubage de surface s’il y constate: (a) any gas flow that exceeds a stabilized gas flow a) un écoulement de gaz dépassant l’échappement in excess of 300 m3/d; stabilisé de plus de 300 m3 par jour; (b) a shut-in pressure b) une pression statique, selon le cas : (i) greater than one-half the formation leak-off (i) supérieure à la moitié de la pression de fuite pressure at the surface casing shoe, or au niveau du sabot du tubage de surface, (ii) greater than 11 kPa/m times the surface (ii) supérieure à onze kilopascals par mètre de casing setting depth; profondeur de la colonne de surface; (c) any flow when any usable water-bearing c) tout écoulement d’une formation aquifère non formation is not covered by cemented surface recouverte d’une colonne de surface cimentée casing or by the cement of the next casing ou par le ciment de la prochaine colonne de string; tubage; (d) any flow with hydrogen sulphide present; d) tout écoulement renfermant une concentration d’hydrogène sulfuré; (e) any oil or water flow when the water has total e) tout écoulement de pétrole ou d’eau dissolved solids greater than 4000 mg/l; renfermant une quantité totale de matières dissoutes supérieure à 4000 mg/l; (f) any vent flow due to wellhead seal failures or f) tout écoulement attribuable à un manque casing failure; or d’étanchéité de la tête de puits ou du tubage; (g) any vent flow that constitutes a fire, public g) tout écoulement présentant un risque safety or environmental hazard. d’incendie ou une menace pour la sécurité humaine ou l’environnement. (4) The licensee shall repair a gas migration problem (4) Le titulaire de licence doit réparer tout problème de as soon as possible, and not later than 12 months after migration de gaz dans les plus brefs délais et de toute discovery of the flow, if it exhibits a fire hazard, a façon dans les 12 mois de sa découverte, s’il pose un public safety hazard or off-site environmental damage risque d’incendie, menace la sécurité humaine ou peut such as adverse groundwater contamination. être néfaste pour l’environnement, par exemple en menaçant de polluer la nappe phréatique. (5) The licensee shall submit a remedial program to (5) Le titulaire de licence doit présenter pour the Chief Operations Officer for approval when repair of approbation, un programme d’intervention au délégué the surface casing vent or gas migration problem aux opérations lorsqu’est exigé la réparation d’un described respectively in subsections (3) and (4) is problème soit d’écoulement tel que décrit au required. paragraphe (3) soit de migration de gaz tel que décrit au paragraphe (4), dans le tubage de surface. (6) The Chief Operations Officer may refuse to approve (6) Le délégué aux opérations peut approuver le a remedial program for a surface casing vent flow programme d’intervention du titulaire de licence visé pursuant to subsection (5) unless the Chief Operations au paragraphe (5) s’il est d’avis que ce programme Officer is satisfied that the program will provide assure une protection adéquate de l’environnement. adequately for the protection of the environment. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 71 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 6 PARTIE 6 Section 87. Article 87. 87. Testing requirements for valves and sensors (Essais des vannes et des capteurs) 87. Testing requirements for valves and 87. Essais des vannes et des capteurs sensors (1) The licensee of a well or field facility shall (1) Le titulaire de licence d’un puits ou d’une installation de champ doit : (a) subject every fail-close emergency shutdown a) faire l’essai au moins une fois tous les six mois valve for the well or field facility to an des vannes d’arrêt d’urgence dont sont munies operating and pressure-holding test at least les têtes de puits ou installations de champ afin once every six months and shall immediately d’en vérifier le fonctionnement et la résistance replace defective valves; à la pression, et remplacer sans délai les vannes défectueuses; (b) test every relief valve on a pressure vessel that b) faire l’essai au moins une fois tous les douze is located at the well or field facility at least mois des soupapes de détente des réservoirs once every 12 months; sous pression se trouvant sur les lieux d’un puits ou d’une installation de champ; (c) test every pressure sensor of the well or field c) faire l’essai au moins une fois tous les trois facility at least once every three months; mois des capteurs de pression des puits ou des installations de champ; (d) test every liquid level control device of the well d) faire l’essai au moins une fois par mois des or field facility at least once every month by dispositifs de réglage de niveau de fluide du activating the sensor for the device; and puits ou de l’installation de champ en actionnant le capteur du dispositif; (e) test every automatic shut-off valve associated e) faire l’essai au moins une fois par mois des with a compressor, pump or vessel inlet of the robinets de fermeture automatique des field facility and every automatic low-level- compresseurs, pompes et réservoirs de activated shut-off valve on a flowline of the l’installation de champ ainsi que des robinets field facility at least once every month. de fermeture automatique commandés par capteur de niveau bas des conduites d’écoulement. (2) On application by the licensee, the Chief Operations (2) À la demande du titulaire de licence, le délégué aux Officer may approve a variation of the frequency of any opérations peut approuver une fréquence d’essai testing under subsection (1) if the Chief Operations différente de celle prescrite au paragraphe (1) s’il est Officer is satisfied that the variation is d’avis que la fréquence proposée : (a) consistent with the design of the safety system a) est appropriée, compte tenu de la conception et and the conditions for which the safety system du principe de fonctionnement du dispositif de was designed; and sécurité; (b) is justified by the maintenance record and b) est raisonnable, compte tenu du dossier de experience with a particular component. service et d’entretien de l’élément considéré. (3) Computerized operational logs may be used to (3) Le fonctionnement des dispositifs de sécurité peut confirm the proper operation of the safety system but se faire au moyen d’un enregistrement informatisé, any logs used must be verified against the actual mais tout enregistrement doit être contre-vérifié operation of logged devices on a regular basis. régulièrement par une observation directe. Page 72 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 88. Article 88. (4) The licensee shall report to the Minister every (4) Le titulaire de licence doit signaler au ministre, failure or unsuccessful test of the safety system of a toute défaillance ou tout échec aux essais ou contrôles well or field facility or of any component of the safety de fonctionnement d’un dispositif de sécurité ou system before the end of the day following the day on élément de dispositif de sécurité utilisé dans un puits which the failure or unsuccessful test occurred. ou une installation de champ, avant la fin de la journée suivant celle où l’échec s’est produit. 88. Inspections and tests of equipment (Inspection et essai des matériels) 88. Inspections and tests of equipment 88. Inspection et essai des matériels The licensee of a well shall ensure Le titulaire de licence d’un puits doit veiller à ce que: (a) that every piece of equipment used in a drilling a) a) chaque pièce du matériel utilisé pour le operation or well operation forage ou l’exploitation d’un puits : (i) is maintained in good working condition at (i) soit toujours maintenue en bon état de all times, fonctionnement, (ii) is inspected in accordance with the (ii) soit inspectée conformément aux manufacturer’s specifications, and prescriptions du fabricant, (iii) has all necessary fire fighting and safety (iii) comporte tous les dispositifs de sécurité et equipment and is inspected once each month de lutte contre les incendies et que ceux-ci to confirm that the equipment is serviceable soient inspectés une fois par mois afin de and in its proper physical location; and confirmer qu’ils sont en bon état de fonctionnement et placés au bon endroit; (b) that each air-intake shut-off valve or engine b) l’état de bon fonctionnement des robinets de flooding system is tested to confirm that it is coupure d’admission d’air ou des systèmes de serviceable noyage de moteurs soit vérifié : (i) before drilling out the cement plug at the (i) avant de pénétrer le bouchon de ciment au shoe of any casing string, and niveau du sabot de toute colonne de tubage, (ii) before each formation flow test or series of (ii) avant chaque essai ou série d’essais tests. d’écoulement. PART 7 (PARTIE 7) PART 7 PARTIE 7 WELL SUSPENSION AND ABANDONMENT ABANDON PROVISOIRE OU DÉFINITIF 89. Well suspension or abandonment requirement (Exigences) 89. Well suspension or abandonment 89. Exigences requirement The licensee of a well that has never been completed, Le titulaire de licence d’un puits n’ayant jamais été or of a well or portion of a well that has not produced achevé, ou d’un puits ou d’une partie d’un puits n’ayant or been used for injection purposes in a 12-month pas produit ou n’ayant pas été utilisé comme puits period, shall ensure that the well or the portion of the d’injection pendant douze mois, doit veiller à ce que le well, as the case may be, is suspended or abandoned in puits ou la partie de celui-ci, selon le cas, soit accordance with these Regulations. abandonné provisoirement ou définitivement, conformément aux dispositions du présent règlement. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 73 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 90. Article 90. 90. Approval to suspend or abandon a well (Autorisation d’abandonner un puits) 90. Approval to suspend or abandon a well 90. Autorisation d’abandonner un puits (1) A Well Operation Approval for the suspension or (1) Le délégué aux opérations peut accorder abandonment of a well may be given orally initially and oralement une autorisation d’exploitation d’un puits issued later in writing whenever the Chief Operations portant sur l’abandon provisoire ou définitif de celui-ci Officer considers doing so is warranted in the et délivrer plus tard le document d’autorisation, s’il est circumstances. d’avis que les circonstances le justifient. (2) An application for a Well Operation Approval for the (2) La demande d’autorisation d’exploitation d’un puits suspension or abandonment of a well must portant sur l’abandon provisoire ou définitif de celui-ci doit comporter les éléments suivants: (a) include sufficient information to evaluate the a) inclure tous les renseignements nécessaires effectiveness of the proposed suspension or pour permettre l’évaluation de l’efficacité du abandonment program; and programme d’abandon proposé; (b) when required by the Chief Operations Officer, b) à la demande du délégué aux opérations, provide a summary of formation flow tests for présenter un sommaire des résultats des essais the well and a copy of the logs run in the well d’écoulement de formation ainsi qu’une copie with proper geological interpretation. des diagraphies effectuées dans le puits accompagnées d’une interprétation géologique appropriée. (3) When the Chief Operations Officer orders that a (3) Lorsque le délégué aux opérations ordonne well be abandoned at Government expense and l’abandon d’un puits aux frais du gouvernement et engages a contractor pursuant to subsection 92(2) of retient, en vertu du paragraphe 92(2) de la Loi, les the Act to carry out the abandonment operation, the services d’un entrepreneur pour exécuter les travaux contractor is exempt from the requirement to be the d’abandon, cet entrepreneur n’est tenu de détenir holder of aucun des documents suivants : (a) a Well Licence in respect of the well; or a) une licence de puits à l’égard de ce puits; (b) a Well Operation Approval in respect of the b) une autorisation d’exploitation d’un puits abandonment operation. portant sur les travaux visés d’abandon de puits. 91. Suspended wells (Abandon provisoire d’un puits) 91. Suspended wells 91. Abandon provisoire d’un puits (1) The licensee of a well shall ensure that, in (1) Lorsqu’il effectue les travaux d’abandon provisoire carrying out the suspension of the well, the well is left dans un puits, le titulaire de licence du puits doit veiller in such a condition that à ce que les conditions suivantes y soient présentes : (a) any formation fluid is prevented from flowing a) aucun fluide de formation ne puisse s’écouler through or escaping from the well bore; and du trou de sonde; (b) no pressure is detected at the surface on any b) les capteurs de surface n’indiquent aucune casing string or annuli. pression dans les colonnes de tubage et dans les espaces annulaires. (2) The licensee of a well that is not abandoned shall (2) Le titulaire de licence d’un puits qui n’est pas ensure that the well is equipped with a christmas tree. abandonné doit veiller à ce qu’il soit équipé d’une tête d’éruption. (3) The licensee of a completed well that is suspended (3) Lorsque les travaux sont abandonnés dans un puits shall ensure achevé, le titulaire de licence doit veiller à ce que : Page 74 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 92. Article 92. (a) that the well a) le puits soit : (i) has tubing landed in the well bore, (i) tubé, (ii) is equipped with a down-hole mechanical (ii) muni d’un bouchon mécanique de fond, plug, and (iii) is equipped with a tubing plug at the (iii) muni d’un bouchon de tubage en surface; surface; and (b) that the tubing and mechanical plug are b) le bouchon mécanique de fond et le bouchon de pressure-tested to a minimum of 7,000 kPa or surface soient éprouvés à la plus grande d’une to the maximum anticipated differential pression minimale de 7 000 kPa ou de la pressure, whichever is greater, to ensure that pression différentielle maximale prévue afin de they are properly installed. vérifier qu’ils sont mis en place correctement. (4) On the request of the Chief Operations Officer, the (4) À la demande du délégué aux opérations, le licensee shall conduct an inflow test in respect of the titulaire de licence doit effectuer un essai de venues well. dans le puits. (5) A well that is suspended must be (5) Tout puits abandonné provisoirement doit être : (a) inspected once every 12 months; and a) inspecté une fois par an; (b) put back into operation or abandoned within a b) remis en production ou abandonné period of three years from the date of définitivement dans les trois ans suivant la date suspension or any longer period specified by d’abandon provisoire, ou dans un délai précisé the Chief Operations Officer. par le délégué aux opérations.. 92. Information on suspended well (Renseignements requis) 92. Information on suspended well 92. Renseignements requis The Chief Operations Officer, when information Lorsque les renseignments indiquent qu’il y a un indicates that a problem exists, or at any time, may problème, ou en tout temps, le délégué aux opérations require the licensee of a suspended well to submit peut exiger du titulaire de licence d’un puits abandonné information sufficient to ensure the ongoing integrity of provisoirement, qu’il lui fournisse les renseignements the well as required by section 91, and the required nécessaires pour confirmer l’intégrité du puits, information may include conformément aux exigences de l’article 91, et notamment : (a) results of pressure tests of casings and the a) les résultats des épreuves de pression du wellhead; tubage et de la tête de puits; (b) results of casing integrity inspection or logging; b) les résultats de l’inspection ou des diagraphies visant à vérifier l’intégrité du tubage; (c) evidence of physical inspection; and c) une preuve d’inspection matérielle; (d) any other survey, test or inspection as directed d) les résultats d’autres mesures, essais ou from time to time by the Chief Operations inspections exigés ponctuellement par le Officer. délégué aux opérations. 93. Order to abandon well (Arrêté d’abandon) 93. Order to abandon well 93. Arrêté d’abandon (1) Neither the issuance of a Well Operation Approval (1) Ni la délivrance d’une autorisation d’exploitation for the abandonment of a well nor an d’un puits portant sur l’abandon de celui-ci, ni un acknowledgement by the Chief Operations Officer of the accusé de réception de la part du délégué aux receipt of the well termination records submitted opérations concernant un rapport de cessation des pursuant to section 187 with respect to the well travaux dans un puits présenté en application de c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 75 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 94. Article 94. relieves the licensee of the well or any other person of l’article 187, ne libèrent le titulaire de la licence de the responsibility for the proper abandonment of the puits ou autre intéressé de sa responsabilité quant à well if, at a later date, the abandonment of the well is l’abandon définitif d’un puits, s’il est découvert à une found not to be in accordance with these Regulations. date ultérieure que le puits n’a pas été abandonné conformément aux exigences du présent règlement. (2) When the Chief Operations Officer makes an order (2) Lorsque le délégué aux opérations prend un arrêté under subsection 91(2) of the Act directing the en vertu du paragraphe 91(2) de la Loi pour ordonner abandonment of a well by the owners of the working aux détenteurs d’intérêts économiques directs interests in the well, the order is sufficiently served on d’abandonner un puits, la signification de cet arrêté est those working interest owners if a copy of the order is valable si une copie en est envoyée par la poste à sent by mail to each of the persons who are then chacune des personnes inscrites dans les registres du shown in the records of the Department as the owners ministère comme étant détentrice au moment où est of the working interests in the well. signifié l’arrêté. 94. Removal of casing (Retrait du tubage) 94. Removal of casing 94. Retrait du tubage (1) The licensee of a well shall not remove any casing (1) Le titulaire de licence d’un puits ne doit enlever while abandoning the well unless the removal is aucun tubage lorsqu’il abandonne le puits, sauf sur permitted by the Well Operation Approval and is autorisation expresse du document d’autorisation carried out in accordance with subsection (2). d’exploitation du puits, auquel cas le retrait doit être effectué conformément au paragraphe (2). (2) When the removal of casing is permitted pursuant (2) Au moment du retrait d’un tubage en application to subsection (1), du paragraphe (1) : (a) a bridge plug must be set in the casing not a) un bouchon de support doit être mis en place more than 15 metres below the cut-off point dans le tubage avant que celui-ci ne soit prior to cutting the casing and the plug shall be sectionné, à une profondeur maximale de pressure-tested to 7,000 kPa; quinze mètres sous le point de sectionnement, puis éprouvé à une pression de 7 000 kPa; (b) a minimum 30-metre cement plug must be b) un bouchon de ciment d’une épaisseur placed across the casing stub and as close to 15 minimale de 30 m doit être mis en place sur le metres below the casing stub as practicable; tubage sectionné et le plus près possible de 15 m au-dessous de celui-ci; (c) the cement plug referred to in paragraph (b) c) le bouchon de ciment mentionné à l’alinéa b) must either be doit être, soit: (i) felt by the drill pipe or tubing, or (i) palpé par la tige ou le train de forage, (ii) logged by an approved plug-logging (ii) vérifié au moyen d’une méthode de technique if the cement plug is not diagraphie approuvée s’il ne repose pas sur supported by the bridge plug; and un bouchon de support; (d) that portion of the well above the cut-off point d) la partie du puits située au-dessus du point de must be abandoned in accordance with this sectionnement du tubage doit être abandonnée Part. conformément à la présente partie. Page 76 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 95. Article 95. 95. Location of abandonment plugs (Emplacement des bouchons) 95. Location of abandonment plugs 95. Emplacement des bouchons (1) When a well or a portion of a well is being (1) Lorsqu’il abandonne définitivement un puits ou abandoned, the licensee shall ensure that une partie d’un puits, le titulaire de licence doit : (a) if practicable, a cement plug is set at the a) veiller à ce qu’un bouchon de ciment soit, si bottom of the well except when possible, mis en place au fond du puits, sauf lorsque, selon le cas : (i) the formation at the bottom of the well is (i) la formation au fond du puits est une salt, in which case the bottom cement plug formation de sel, auquel cas le bouchon de may be set immediately above the top of the ciment peut être placé immédiatement au- salt formation, or dessus de la formation, (ii) conditions in the well bore of the well are (ii) les conditions du trou de sonde sont telles such that it is not practicable to set a cement qu’il n’est pas possible de placer un bouchon plug at the bottom of the well, in which case au fond du puits, auquel cas le bouchon est the bottom cement plug shall be set as deep placé aussi profondément que possible dans in the well as is practicable; le puits; (b) cement plugs and bridge plugs are set in b) veiller à ce que les bouchons de ciment et les accordance with the Well Operation Approval bouchons de support soient placés and are designed so that they conformément aux termes de l’autorisation d’exploitation du puits et soient conçus pour : (i) isolate formations or groups of formations (i) isoler les formations ou les groupes de that appear to have abnormal pressures, formations qui semblent présenter des pressions anormales, (ii) separate porous permeable formations that (ii) séparer les formations perméables et contain formation fluids that are significantly poreuses qui renferment des fluides de different in nature from each other, nature sensiblement différente, (iii) separate porous permeable formations from (iii) séparer les formations perméables et other porous permeable formations that are poreuses des formations analogues dont significantly different in age, l’âge diffère sensiblement, (iv) separate lost circulation intervals in the well (iv) séparer les parties du puits où il se produit from other porous permeable formations, une perte de circulation des autres and formations perméables et poreuses, (v) prevent formation fluid from flowing or (v) empêcher les fluides de formation de escaping from the well bore; s’échapper ou de s’écouler du trou de sonde; (c) in the case of a well equipped with a liner, the c) veiller, dans le cas d’un puits équipé d’un liner shall be isolated upon abandonment by tubage partiel, à ce que celui-ci soit isolé, selon le cas, au moyen : (i) placing a 30-metre cement plug across the (i) d’un bouchon de ciment de 30 m placé sur la liner hanger, or suspension du tubage partiel, c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 77 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 96. Article 96. (ii) by placing a bridge plug not more than 8 (ii) d’un bouchon de support placé dans le metres above the liner hanger, pressure- tubage à une profondeur maximale de huit testing the bridge plug to 7,000 kPa, and mètres au-dessus de la suspension du placing a minimum 8 linear metres of tubage partiel, éprouvé à une pression de 7 cement on the bridge plug; 000 kPa puis recouvert d’au moins huit mètres linéaires de ciment; (d) despite paragraph (a), unless at least 10 d) malgré l’alinéa a), sauf si on laisse en metres of cement is left in the bottom of the permanence au moins dix mètres de ciment deepest casing string during cementation dans la dernière colonne de tubage au cours de referred to in section 60 and the cement is not la cimentation visée à l’article 60, et que ce drilled out, ciment n’est pas traversé par la colonne de forage, veiller à ce que : (i) the well is plugged with (i) le puits soit bouché, selon le cas, au moyen : (A) a cement plug that is at least 30 metres in (A) d’un bouchon de ciment d’une longueur length and extends at least 15 metres minimale de 30 m s’étendant à au moins below and 15 metres above the shoe of quinze mètres au-dessous et au moins the deepest casing string, or quinze mètres au-dessus du sabot de la dernière colonne de tubage, (B) a bridge plug that is set in the casing (B) d’un bouchon de support placé dans le within 100 metres of the bottom of the tubage à moins de cent mètres de deepest casing string, and l’extrémité inférieure de la dernière colonne de tubage, (ii) the plug is tested to a pressure equal to the (ii) ce bouchon soit éprouvé à une pression formation leak-off test pressure described in égale à la pression de fuite déterminée selon subsection 63(2) plus 3,500 kPa; l’essai visé au paragraphe 63(2), majorée de 3 500 kPa; (e) when a leak exists or is suspected in the e) lorsqu’une fuite est constatée ou présumée innermost casing string, a cement plug is set at dans la colonne de tubage la plus profonde, the time of abandonment to seal the leak; and veiller à ce qu’un bouchon de ciment soit mis en place, au moment de l’abandon, pour la colmater; (f) when any annulus is open to a formation, a f) lorsqu’un espace annulaire est ouvert à une cement plug is set at the casing shoe to seal formation, veiller à ce qu’un bouchon de ciment that annulus. soit mis en place pour le fermer. (2) The licensee of a well shall perforate any casing (2) Le titulaire de licence d’un puits doit perforer tout installed in the well in order to place cement between tubage installé dans le puits afin de mettre en place du porous permeable formations if the formations would ciment entre les zones perméables poreuses qui ont not otherwise be isolated. besoin d’être isolées. 96. Surface abandonment (Abandon de surface) 96. Surface abandonment 96. Abandon de surface When a well is abandoned, the licensee shall ensure Lorsqu’il abandonne définitivement un puits, le titulaire that surface abandonment is completed within 12 de licence doit veiller à ce que l’abandon en surface soit months of the subsurface abandonment in accordance complété dans les douze mois de l’abandon souterrain with the following: en conformité avec les exigences suivantes : (a) all casing must be cut at least one metre below a) tous les tubages doivent être sectionnés à au ground level and either a minimum of eight moins un mètre au-dessous du niveau du sol et Page 78 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 97. Article 97. linear metres of cement is placed on a wiper soit qu’un bouchon de cimentation d’une plug or a steel plate is welded across the épaisseur minimale de huit mètres soit placé innermost casing; and dans le tubage interne, soit qu’une plaque en acier y soit soudée en travers; (b) steel plates must be welded over the top of b) des plaques d’acier doivent être soudées sur le each casing string other than the innermost dessus de chaque colonne de tubage autre que casing referred to in paragraph (a) in a manner le tubage interne visé à l’alinéa a), de façon à that completely closes off the well bore and the obturer complètement le trou de sonde et tous annuli between all strings of casing. les espaces annulaires entre les colonnes de tubage. 97. Plugging perforated interval (Obturation du tubage perforé) 97. Plugging perforated interval 97. Obturation du tubage perforé (1) The licensee of a well shall ensure that every (1) Sauf autorisation contraire du délégué aux interval in a casing string that has been perforated is opérations, le titulaire de licence d’un puits doit veiller plugged prior to perforating any other interval in the à obturer toute partie de tubage perforé avant de casing string unless otherwise approved by the Chief procéder à la perforation d’une autre partie du tubage. Operations Officer. (2) The perforated intervals referred to in (2) Les parties de tubage perforé visées au subsection (1) must be plugged paragraphe (1) doivent être obturées de l’une ou l’autre des façons suivantes : (a) by setting a bridge plug not more than 8 a) en plaçant un bouchon de support à une metres above the top perforation and by distance maximale de huit mètres au-dessus placing not less than 8 linear metres of cement des perforations supérieures et en recouvrant on the bridge plug; le bouchon de support d’une épaisseur minimale de huit mètres de ciment; (b) by squeezing cement into the perforations and b) en injectant du ciment dans les perforations then testing the plug to a pressure of not less puis en éprouvant le bouchon à une pression than 7,000 kPa above the formation fluid minimale de 7 000 kPa de plus que la pression pressure in the interval; or du fluide de formation au niveau de cette partie du tubage; (c) by setting a cement plug not more than 30 c) en plaçant un bouchon de ciment d’une metres above the top perforation and not less épaisseur minimale de 30 m à une distance than 30 metres in length. maximale de 30 m au-dessus des perforations supérieures. (3) Despite subsection (2), if a licensee proposes to (3) Malgré le paragraphe (2), si un titulaire de licence plug a perforated interval pursuant to subsection (1) se propose d’obturer une partie de tubage perforé before perforating another interval in the casing string avant de procéder à la perforation d’une autre partie and the interval to be plugged is the uppermost du tubage en application du paragraphe (1), et qu’il perforated interval in the well, the interval must be s’agit de la plus élevée des parties de tubage perforé plugged du puits, celle-ci doit être obturée conformément à l’une des méthodes suivantes: (a) in accordance with paragraph (2)(b) but a) la méthode donnée à l’alinéa (2)b), mais en ensuring that the cement is drilled out of the veillant à ce que le ciment soit enlevé du trou well bore before the pressure test, if the other de sonde avant de procéder à l’épreuve sous perforation interval is to be placed below that pression, si l’autre partie de tubage perforé uppermost perforated interval, or doit être placée au-dessous de cette partie la plus élevée; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 79 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 98. Article 98. (b) in accordance with paragraph (2)(c), if the b) la méthode donnée à l’alinéa (2)c), si l’autre other perforation interval is to be placed above partie de tubage perforé doit être placée au- that uppermost perforated interval. dessous de cette partie la plus élevée. 98. Length and quality of cement plugs (Longueur et qualité des bouchons de ciment) 98. Length and quality of cement plugs 98. Longueur et qualité des bouchons de ciment (1) The licensee of a well shall ensure that the cement (1) Le titulaire de licence doit veiller à ce que, sauf plugs referred to in section 95, unless otherwise indication contraire de l’autorisation d’exploitation du permitted in the Well Operation Approval, are not less puits, les bouchons de ciment visés à l’article 95 ne than soient pas inférieurs à : (a) 100 metres in length, when they are set in a a) cent mètres de longueur lorsqu’ils sont placés portion of the well that is not protected by dans une partie non tubée du puits; casing; and (b) 30 metres in length, when they are set in a b) 30 mètres de longueur lorsqu’ils sont placés portion of the well that is protected by casing. dans une partie tubée du puits. (2) The licensee shall ensure that the cement used for (2) Le titulaire de licence doit veiller à ce que le ciment any cement plugs is designed to have a minimum utilisé pour les bouchons de puits soit prévu pour avoir compressive strength of 3,500 kPa after it has cured une résistance minimale à la compression de 3 500 kPa for at least 12 hours. après au moins douze heures de durcissement. 99. Fluid in abandoned or suspended wells (Fluide dans les puits abandonnés définitivement ou provisoirement) 99. Fluid in abandoned or suspended wells 99. Fluide dans les puits abandonnés définitivement ou provisoirement The licensee of a well that is suspended or abandoned Le titulaire de licence d’un puits devant être abandonné shall ensure that the well is filled with fluid that provisoirement ou définitivement doit veiller à que le fluide à injecter dans ce puits réponde aux exigences suivantes : (a) will not freeze under the conditions to which it a) qu’il résiste au gel dans les conditions will be subjected; and auxquelles il sera assujetti; (b) is treated to minimize corrosion of the casing b) qu’il soit traité afin de minimiser la corrosion and tubing. du tubage et de la colonne de production. 100. Cement top and plug location (Vérification des bouchons) 100. Cement top and plug location 100. Vérification des bouchons (1) The licensee of a well shall (1) Le titulaire de licence doit, selon le cas : (a) log the cement top using an approved plug- a) mesurer la masse volumique du ciment à la logging technique and ensure that the logging partie supérieure du bouchon par une méthode tool is calibrated at least once per job; or approuvée de mesure directe au moyen d’un instrument étalonné à chaque opération; (b) wait for at least 12 hours for the cement used b) attendre que le ciment des bouchons ait durci for plugs to set and then confirm with a pendant au moins douze heures puis vérifier, minimum force of 90 kN or the full weight of avec une force d’au moins 90 kN ou avec le the cementing string, whichever is the lesser, plein poids de la colonne de cimentation, selon the position of any cement plug that is not la moindre des deux valeurs, la position de tout supported by the bottom of the well or by a bouchon de ciment ne reposant ni sur un autre plug bouchon, ni au fond du puits, soit : Page 80 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 7 PARTIE 7 Section 101. Article 101. (i) at the shoe of the deepest casing string, (i) au niveau du sabot de la colonne de tubage la plus profonde, (ii) above an abnormally pressured formation, (ii) au-dessus d’une zone de pression anormale, or (iii) above a hydrocarbon-bearing formation. (iii) au-dessus d’une zone renfermant des hydrocarbures. (2) When a plug is found to be so displaced from its (2) Lorsqu’il est constaté qu’un bouchon est si dévié de intended position as to render it inadequate for the la position prévue qu’il ne remplit pas la fonction à purpose for which it was intended, a supplementary laquelle il est destiné, il doit être remplacé par un autre plug must be set to replace it and the position of it bouchon et la position de celui-ci vérifiée confirmed in accordance with subsection (1). conformément au paragraphe (1). 101. Surface marking (Repères en surface) 101. Surface marking 101. Repères en surface The licensee of an abandoned well shall ensure that the Le titulaire de licence d’un puits abandonné doit veiller surface location of the well is marked by a steel marker à ce que l’emplacement du puits soit marqué par un painted iridescent orange that extends 1.5 metres repère en acier de couleur orange iridescent s’élevant à above ground level and is comprised of 1,5 mètre au-dessus de la surface du sol et constitué : (a) a length of pipe that is either welded to the a) d’un bout de tube qui est soit soudé à la plaque cover on the cut-off casing or is set in cement; d’obturation du tubage sectionné, soit ancré and dans le ciment; (b) steel plates that are at least 5 mm thick and b) de plaques en acier d’une épaisseur minimale measure 500 mm by 300 mm on which the well de cinq millimètres mesurant 500 mm par 300 name and well surface location coordinates are mm, portant la désignation du puits et ses bead-welded. coordonnées de surface inscrites au cordon de soudure. 102. Clean-up (Nettoyage du chantier) 102. Clean-up 102. Nettoyage du chantier The licensee of a well shall ensure that on the Lorsqu’un puits est abandonné définitivement, le abandonment of the well titulaire de licence doit veiller à ce que : (a) all solid waste is cleared from the site and the a) le chantier soit débarrassé de tous les déchets surface of the site is cleaned up to the solides et sa surface remise en état à la satisfaction of the Chief Operations Officer; satisfaction du délégué aux opérations; (b) the rat and mouse hole are plugged in such a b) le trou de rat et le trou de manoeuvre soient manner that a safety hazard is not created; bouchés de façon à éliminer tout danger; (c) waste oil is removed; c) l’huile usée soit éliminée; (d) unused concrete bases, machinery and d) les ouvrages en béton, machines et matériaux materials are removed; and non utilisés soient enlevés; (e) excavations are drained and filled. e) les excavations soient drainées et remblayées. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 81 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 103. Article 103. PART 8 (PARTIE 8) PART 8 PARTIE 8 EVALUATION (ÉVALUATIONS) EVALUATION ÉVALUATIONS 103. Well evaluation (Évaluation de puits) 103. Well evaluation 103. Évaluation de puits (1) The licensee of a well shall obtain sufficient well (1) Le titulaire de licence d’un puits doit effectuer un tests, formation flow tests, wireline logs, analyses, nombre suffisant d’essais de puits, d’essais surveys, conventional cores, cuttings and samples d’écoulement de formation, de diagraphies par câble, during the drilling of the well to ensure that a d’analyses, de mesures, de carottages classiques,et de comprehensive geological and reservoir evaluation can prélèvements de déblais et d’échantillons au cours du be made. forage d’un puits pour permettre un levé géologique et une évaluation du réservoir complets. (2) The licensee shall prepare an evaluation report in (2) Le titulaire de licence doit remettre au ministre, en respect of the well containing an analysis and application de l’alinéa 183a), un rapport d’évaluation interpretation of the evaluation data referred to in contenant les analyses et interprétations de toutes les subsection (1) for submission to the Minister pursuant données d’évaluation d’un puits visées au to paragraph 183(a). paragraphe (1). 104. Gas content of drilling fluid (Teneur en gaz du fluide de forage) 104. Gas content of drilling fluid 104. Teneur en gaz du fluide de forage (1) The licensee of a well shall, when detection and (1) Lorsqu’un détecteur de gaz est exigé en vertu de recording devices are required under l’alinéa 31(5)e), le titulaire de licence doit prélever des paragraph 31(5)(e), sample and test all drilling fluid échantillons du fluide de forage qui remonte à la returning to the surface to determine the total surface et les analyser afin de déterminer leur teneur hydrocarbon gas content and, if the devices have the totale en hydrocarbures gazeux et, si l’appareil possède capability, the relative amounts of any hydrogen cette capacité de discrimination, déterminer les sulphide, methane, ethane, propane and butane gas in quantités relatives d’hydrogène sulfuré, de méthane, a gaseous state. d’éthane, de propane et de butane à l’état gazeux. (2) The licensee shall record the results of the (2) Le titulaire de licence doit noter les résultats de sampling and testing referred to in subsection (1). l’échantillonnage et des analyses visés au paragraphe (1). 105. Drill cuttings (Déblais de forage) 105. Drill cuttings 105. Déblais de forage Unless otherwise directed by the Chief Operations À moins de directives contraires du délégué aux Officer, the licensee of a well shall ensure that opérations, le titulaire de licence d’un puits doit veiller à ce que : (a) a series of drill cutting samples are taken at a) une part de chacun d’une série d’échantillons interval depths of five metres and that a de déblais de forage prélevés à cinq mètres portion of each sample is washed and dried d’intervalle de profondeur soit lavée et séchée de manière à : (i) to remove any drilling fluid or other (i) éliminer toutes traces de fluide de forage ou contaminants, and autre agent de contamination, (ii) in a manner that minimizes any change in (ii) modifier le moins possible l’aspect naturel et the natural appearance or lithologic les caractéristiques lithologiques des déblais; characteristics of the cuttings; Page 82 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 106. Article 106.
Part document.segment-8
Oil and Gas Drilling and Production Regulations — segment 8
- document.segment-8 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 8
AI-assisted research summary: This part requires well licensees to core, log, test, sample, transport, store, and report drilling and reservoir data in specified ways, and it limits some actions unless approval is obtained.
(b) the portion referred to in paragraph (a) is of b) la part d’échantillon visée à l’alinéa a) soit sufficient volume to fill two standard geological suffisante pour remplir deux fioles à sample vial containers; and échantillons géologiques standard; (c) the vials referred to in paragraph (b) are c) les fioles visées à l’alinéa b) portent une accurately and durably labelled with the name étiquette durable sur laquelle sont indiqués of the well and the depth interval from which précisément la désignation du puits et the drill cuttings were obtained. l’intervalle de profondeur d’où provient l’échantillon. 106. Conventional cores (Carottage classique) 106. Conventional cores 106. Carottage classique (1) The licensee of a well shall core each of the (1) Le titulaire d’une licence de puits doit carotter formations or parts of formations specified in the toute formation ou partie de formation spécifiée dans conditions of the Well Licence. les conditions de la licence de puits. (2) The licensee shall ensure that (2) Le titulaire de licence doit veiller à ce que : (a) every conventional core is analyzed to a) chacune des carottes prélevées par carottage determine the basic reservoir characteristics of classique soit analysée en vue de déterminer all potential formation intervals in the core; les principales caractéristiques des réservoirs potentiels traversés par la carotteuse; (b) the analysis referred to in paragraph (a) b) l’analyse visée à l’alinéa a) porte au moins sur includes the measurement of at least the les caractéristiques suivantes : following characteristics (i) porosity, (i) la porosité, (ii) permeability, in the vertical direction and in (ii) la perméabilité dans la direction verticale, the direction of maximum horizontal dans la direction de la perméabilité permeability and in the direction normal to horizontale maximale et dans la direction the direction of maximum horizontal perpendiculaire à la direction de la permeability, and perméabilité horizontale maximale, (iii) fluid saturation; and (iii) le degré de saturation; (c) all the cores, except the portions of core c) lorsque les échantillons nécessaires à l’analyse necessary for the analysis referred to in visée à l’alinéa a) ont été prélevés, les restes paragraph (a), and not less than one-half of the des carottes ou des tranches prises dans le cross-sectional area of the cores, are, when sens longitudinal et correspondant à au moins submitted to the Minister pursuant to la moitié de la section transversale de ces paragraph 183(c), contained in standard carottes soient remis au ministre, en cardboard boxes crated in proper stratigraphic application de l’alinéa 183c), dans des boîtes de order. carton standard, emballés dans l’ordre stratigraphique voulu. (3) The licensee shall store every core or portion of a (3) Le titulaire de licence doit conserver toutes les core not submitted to the Chief Operations Officer carottes ou restes de carottes qui n’ont pas été remis pursuant to paragraph (2)(c), for a period of not less au délégué aux opérations en application de than two years after the date of abandonment of the l’alinéa (2)c) durant une période d’au moins deux ans à well from which the core was taken. compter de la date d’abandon définitif du puits d’où proviennent les carottes. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 83 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 107. Article 107. (4) The licensee shall, before disposing of a core or a (4) Avant d’éliminer les carottes ou parties de carottes portion of a core referred to in subsection (2), notify visées au paragraphe (2), le titulaire de licence doit en the Chief Operations Officer in writing and give the aviser par écrit le délégué aux opérations et lui laisser Chief Operations Officer an opportunity to request la possibilité de les réclamer. delivery to the Chief Operations Officer of that core or portion. 107. Sidewall cores (Carottage latéral) 107. Sidewall cores 107. Carottage latéral (1) No person shall extract a sidewall core from a (1) Il est interdit d’extraire une carotte du carottier core gun before the firing head of the core gun has latéral avant que le dispositif d’amorçage de la charge been removed. explosive n’ait été retiré. (2) The licensee of a well shall ensure that any sidewall (2) Le titulaire de licence d’un puits doit veiller à ce core obtained in the course of drilling the well is que toute carotte prélevée par carottage latéral au analysed immediately, in accordance with good cours du forage du puits soit analysée immédiatement geological practice, and is placed in a suitable container selon les pratiques géologiques reconnues puis placée that is accurately and durably labelled with the name of dans un contenant convenable portant une étiquette the well and the depth interval from which the core durable sur laquelle sont inscrits la désignation du was obtained. puits et l’intervalle de profondeur d’où provient la carotte. (3) The licensee shall store in containers that are (3) Le titulaire de licence doit stocker tout reste de durably labelled with the name of the well and the carotte après les analyses pétrographiques, de depth from which the core was obtained any sidewall réservoir, paléontologiques, palynologiques ou autres, core material remaining after petrographic, reservoir, dans des contenants portant une étiquette durable sur paleontological, palynological or other analyses have laquelle sont inscrits la désignation du puits et been conducted. l’intervalle de profondeur d’où provient la carotte. 108. Wireline logs (Diagraphies au câble) 108. Wireline logs 108. Diagraphies au câble (1) The licensee of a well shall, for the proper (1) Afin d’assurer une bonne évaluation d’un puits, le evaluation of the well, take sufficient wireline logs to titulaire de licence du puits doit prendre un nombre suffisant de diagraphies au câble pour : (a) properly evaluate all uncased intervals in the a) évaluer correctement toutes les parties non well; tubées du puits; (b) permit an accurate calculation of the porosity, b) permettre un calcul précis de la porosité, de la fluid saturation and fluid contact for all saturation et des niveaux de contact entre potential pools; fluides de tous les gisements potentiels; (c) measure the size of the well bore and the c) déterminer le diamètre du trou de sonde ainsi spontaneous potential and natural radioactivity que le potentiel spontané et la radioactivité of any formation; and naturelle de toute formation; (d) assist in determining the lithology of any d) aider à déterminer la lithologie de toute formation. formation. (2) The licensee shall ensure that the wireline logs (2) Le titulaire de licence doit s’assurer que les referred to in subsection (1) yield data of good quality diagraphies au câble visées au paragraphe (1) by having them taken fournissent des données de bonne qualité, en veillant à ce qu’elles soient prises : Page 84 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 108. Article 108. (a) as soon as practicable after penetrating a a) dès que possible après la pénétration d’un potential pool; gisement potentiel; (b) before altering the nature of the drilling fluid in b) avant de modifier la nature du fluide de forage a manner that would affect the quality of the d’une façon qui affecterait leur qualité; wireline logs; (c) before enlarging the diameter of the well bore c) avant d’augmenter le diamètre du trou de for the purpose of installing casing; sonde pour installer le tubage; (d) at sufficiently frequent time intervals during d) à des intervalles assez fréquents au cours du the drilling of the well so that the nature of the forage du puits pour que la nature des fluides formation fluids adjacent to the well bore is not de formation aux abords de la paroi du trou de significantly altered by an invasion of the sonde ne soit pas notablement modifiée par le drilling fluid; and fluide de forage; (e) at a rate that yields good quality data and does e) à une vitesse qui permet d’obtenir des données not cause formation fluids to be swabbed into de bonne qualité et ne provoque pas le the well. pistonnage des fluides de formation dans le puits. (3) When permafrost exists in a well, the licensee shall, (3) Lorsqu’un puits traverse une zone de pergélisol, le unless exempted by the Chief Operations Officer, titulaire de licence, sauf s’il en est exempté par le determine the approximate depth of the base of the délégué aux opérations, doit déterminer de façon permafrost by running a temperature survey or other approximative, la profondeur de la base du pergélisol, wireline log or by such other method as may be par des mesures de température, des diagraphies au approved by the Chief Operations Officer. câble ou toute autre méthode approuvée par le délégué aux opérations. (4) For the purposes of subsection (1), the licensee (4) Pour l’application du paragraphe (1), le titulaire de shall take a sufficient number of types of porosity- licence doit réaliser un nombre suffisant de types measuring wireline logs in the well so that any effect of différents de diagraphies de porosité dans un puits shaliness, hydrocarbons, complex lithology and the pour que tout effet attribuable à la présence d’argile, walls of the well bore can be compensated for in aux hydrocarbures, à une lithologie complexe ou aux determining the porosity of any formation. parois du trou de sonde puisse être corrigé lors du calcul de la porosité de la formation. (5) Unless otherwise permitted in the Well Licence, the (5) Sauf indication contraire de la licence de puits, le licensee shall take at least two types of porosity- titulaire de licence doit réaliser au moins deux types measuring wireline logs if significant reservoir différents de diagraphies de porosité s’il y a lieu de development is indicated in the portion of the well bore croire que le réservoir est très étendu au niveau de la in which the wireline logs are to be taken. partie du trou de sonde concernée. (6) For the purposes of subsection (1), the licensee (6) Pour l’application du paragraphe (1), le titulaire de shall begin by taking a sufficient number of types of licence doit d’abord réaliser un nombre suffisant de resistivity-measuring wireline logs in the well so that types de diagraphies de résistivité dans un puits pour the distortion caused by filtrate invasion, thin beds, the que toute distortion attribuable à l’invasion de filtrat, à drilling fluid and the walls of the well bore can be des couches minces, au fluide de forage ou aux parois compensated for in calculating the formation du trou de sonde puisse être corrigée lors du calcul de resistivity. la résistivité de la formation. (7) The licensee shall take wireline logs in the well bore (7) Le titulaire de licence doit réaliser les diagraphies drilled for the surface casing when the requirement to au câble dans le trou de sonde foré pour le tubage de do so is stated in the Well Licence. surface lorsque l’exige la licence de puits. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 85 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 109. Article 109. (8) The licensee shall ensure that for every wireline log (8) Lorsqu’il effectue une diagraphie au câble, le titulaire de licence doit veiller à ce que : (a) the maximum bottom-hole temperature is a) la température maximale au fond du trou soit measured with at least two maximum- mesurée avec au moins deux thermomètres à recording thermometers; and maximum; (b) the formation temperature, the time that the b) la température de la formation, l’heure d’arrêt circulation of the drilling fluid stopped and the de la circulation du fluide de forage et l’heure à time that the wireline log instrument left the laquelle l’instrument de diagraphie au câble a bottom of the well bore is recorded on the été retiré du fond du trou de sonde soient wireline log. inscrits sur la diagraphie. 109. Deferment of wireline log (Report de la diagraphie au câble) 109. Deferment of wireline log 109. Report de la diagraphie au câble (1) When conditions in a well are such that the taking (1) Lorsque les conditions d’un puits sont telles que la of any wireline log would endanger the safety of any prise d’une diagraphie au câble compromettrait la person, the well or the drilling rig, the licensee of the sécurité du personnel ou l’intégrité du puits ou de well shall defer the taking of that wireline log until the l’appareil de forage, le titulaire de licence du puits conditions are such that the taking of the wireline log reporte la diagraphie jusqu’à ce que les conditions can be done in safety. soient favorables. (2) When the taking of a wireline log is deferred under (2) Lorsque la prise d’une diagraphie au câble est subsection (1), the licensee shall reportée en vertu du paragraphe (1), le titulaire de licence doit : (a) notify the Minister of the deferment before the a) en aviser le ministre avant la fin de la journée end of the day following the day on which the qui suit la date du report; deferment occurred; (b) submit to the Minister a program for approval b) remettre au ministre, pour approbation par le by the Chief Operations Officer detailing the délégué aux opérations, un programme procedures to be used to obtain the décrivant les procédures envisagées pour information that would have been obtained obtenir les informations qu’aurait données la from the deferred wireline log; and diagraphie; (c) follow the procedures referred to in paragraph c) suivre les procédures visées à l’alinéa b), si (b), if approved. celles-ci sont approuvées. 110. Cased hole logs (Diagraphies en trous tubés) 110. Cased hole logs 110. Diagraphies en trous tubés (1) The licensee of a well shall run a cased hole log on (1) Le titulaire d’une licence de puits doit effectuer the well if, in the opinion of the Chief Operations une diagraphie en trou tubé dans le puits si le délégué Officer, the cased hole log would significantly aux opérations est d’avis que cette diagraphie contribute to the evaluation of the pool in which the fournirait des renseignements utiles pour l’évaluation well is located. du gisement sur lequel se situe le puits. (2) When, pursuant to subsection (1), the licensee runs (2) Le titulaire de licence qui effectue une diagraphie a cased hole log, the licensee shall submit a copy of the en trou tubé en application du paragraphe (1) doit cased hole log to the Minister before the end of the day remettre une copie de celle-ci au ministre avant la fin following the day on which the log was completed. de la journée qui suit son achèvement. Page 86 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 111. Article 111. 111. Wireline log quality (Qualité de la diagraphie au câble) 111. Wireline log quality 111. Qualité de la diagraphie au câble The licensee of a well shall ensure that every wireline Le titulaire d’une licence de puits doit veiller à ce que log or other survey made in the well toute diagraphie au câble ou autre levé mené dans un puits : (a) is recorded at a scale that provides a degree of a) soit enregistrée à une échelle donnant un degré sensitivity appropriate to the measurements de précision opportun; being taken; and (b) has recorded on it a description of any tool b) soit assortie d’une description de l’étalonnage calibration or other data that is necessary in de l’instrument ou de tout autre the interpretation of the wireline log or other renseignement nécessaire à l’interprétation des survey. résultats. 112. Formation flow tests and wireline tests generally (Essais d’écoulement de formation et essais au câble) 112. Formation flow tests and wireline tests 112. Essais d’écoulement de formation et generally essais au câble (1) The licensee of a well shall not conduct a wireline (1) Il est interdit au titulaire d’une licence de puits de test or formation flow test on the well unless the Chief mener un essai d’écoulement de formation et un essai Operations Officer has approved a wireline testing au câble dans un puits à moins que le délégué aux program or formation flow testing program, as the opérations n’ait approuvé le programme de l’un ou case may be, in respect of the well. l’autre de ces essais visant le puits. (2) The licensee shall ensure that, in the course of (2) Le titulaire de licence doit veiller à ce que des conducting a wireline test or formation flow test, every prélèvements d’échantillons et des essais soient formation in the well is sampled or tested to obtain éffectués dans chaque formation traversée au cours fluid flow and formation pressure data from the des essais d’écoulement de formation et des essais au formation when there is an indication that the result of câble afin de déterminer le débit d’écoulement des such a sample or test will contribute substantially to fluides de formation et la pression de la formation the evaluation of the formation. lorsqu’il y a lieu de croire que les données obtenues de ces essais et échantillonnages seraient utiles pour l’évaluation de la formation. (3) For the purposes of subsection (2), the licensee (3) Pour l’application du paragraphe (2), le titulaire de shall ensure that licence doit veiller à ce que s’éffectuent les essais suivants : (a) a wireline test is conducted in the open hole a) un essai au câble dans les parties non tubées sections of the well where porous reservoir d’un puits traversant un réservoir poreux pour exists for the purpose of recording pore déterminer la pression interstitielle et la pressure and reservoir permeability; and perméabilité du réservoir; (b) a formation flow test is conducted for the b) un essai d’écoulement de formation afin de purpose of obtaining fluid samples and prélever des échantillons de fluides et faire la productivity data when such action is collecte de données de productivité lorsque les warranted by the positive indication of wireline résultats d’un essai au câble ou d’autres tests or other well bore data. données recueillies concernant le trou de sonde en indiquent l’utilité. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 87 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 113. Article 113. (4) When a wireline test is employed to obtain a (4) Lorsqu’il effectue un essai au câble pour obtenir un reservoir fluid sample, the licensee shall ensure that échantillon de fluides de formation, le titulaire de the test is designed to obtain the maximum amount of licence doit s’assurer que l’essai est conçu pour fluid practicable and that information in respect of the permettre de prélever la plus grande quantité de fluide test is recorded in accordance with the directions of the possible et que les données de l’essai sont enregistrées Chief Operations Officer. conformément aux directives du délégué aux opérations. 113. Formation flow test requirements (Exigences des essais d’écoulement de formation) 113. Formation flow test requirements 113. Exigences des essais d’écoulement de formation (1) The licensee of a well shall ensure that during any (1) Le titulaire d’une licence de puits doit veiller à ce formation flow test no formation fluids are allowed to qu’aucun fluide de formation ne remonte ou ne circule flow to the surface or are circulated to the surface à la surface au cours d’un essai d’écoulement de unless there is adequate illumination in the vicinity of formation à moins que les abords de la tête d’essai, the test tree, flow lines and test tanks. des conduites d’écoulement et des réservoirs de jaugeage ne soient convenablement éclairés. (2) The licensee shall comply with the Canadian (2) Le titulaire de licence doit se conformer aux Petroleum Safety Council’s Industry Recommended procédures et spécifications du matériel pour les essais Practice (IRP), Volume 4, Well Testing and Fluid d’écoulement de formation, qui se trouvent dans le Handling for procedures and equipment specifications document intitulé Industry Recommended Practice for formation flow testing when they do not conflict (IRP), Volume 4, Well Testing and Fluid Handling du with these Regulations. Canadian Petroleum Safety Council. (3) The licensee shall ensure that before starting any (3) Avant d’entreprendre un essai d’écoulement de formation flow test formation, le titulaire de licence doit veiller à ce que les conditions suivantes soient respectées : (a) all safety equipment and fire protection a) tout le matériel de sécurité et de lutte contre equipment are inspected and found ready for les incendies a été inspecté et jugé en état immediate use; d’être utilisé; (b) if the test is to be conducted in an interval of a b) si l’essai doit être effectué dans une partie well that is protected by casing, the annulus tubée du puits, l’espace annulaire entre les between the test string and the casing is tiges d’essai et le tubage est soumis à une pressure-tested to confirm that the packer will épreuve de pression afin de vérifier que la withstand pressure from above the packer; and garniture d’étanchéité peut résister à la pression à laquelle elle est susceptible d’être exposée au cours de l’essai; (c) all pieces of the test equipment are pressure- c) tous les éléments du matériel d’essai sont tested to at least the maximum pressure to éprouvés à une pression atteignant au moins la which that equipment may reasonably be pression maximale à laquelle ils seront expected to be subjected during the test. vraisemblablement exposés au cours de l’essai. (4) The licensee shall ensure that (4) Le titulaire de licence doit veiller à ce que les conditions suivantes soient respectées : (a) during any formation flow test, all flow rates a) au cours d’un essai d’écoulement de formation, and pressures are measured and controlled; les débits et la pression des écoulements sont mesurés et contrôlés; (b) any well fluid produced during a formation flow b) au cours d’un essai d’écoulement de formation, test is tout fluide prélevé dans le puits est : Page 88 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 113. Article 113. (i) sampled to determine if it contains hydrogen (i) analysé afin de déterminer s’il contient de sulphide gas, l’hydrogène sulfuré, (ii) monitored to determine if it contains a (ii) contrôlé afin de déterminer s’il contient une significant amount of sand, and quantité importante de sable, (iii) stored and disposed of in accordance with (iii) recueilli et éliminé conformément aux these Regulations; exigences du présent règlement; (c) unless precautions have been taken to ensure c) sauf si des précautions ont été prises afin the safety of personnel and the control of the d’assurer la sécurité du personnel et le contrôle well, any formation flow test is stopped du puits, tout essai d’écoulement de formation immediately when est interrompu dès que l’on constate : (i) hydrogen sulphide gas is present, or (i) la présence d’hydrogène sulfuré, (ii) significant sand erosion is occurring ; and (ii) la survenance de l’érosion d’une quantité importante de sable; (d) after the completion of a formation flow test d) après l’achèvemement d’un essai d’écoulement and prior to pulling the test string used to de formation et avant le retrait des tiges conduct the test out of the well, any formation d’essai du puits, le fluide de formation se fluid in the test string is circulated to the trouvant dans les tiges d’essai est remonté à la surface or is otherwise recovered. surface ou récupéré d’une autre façon. (5) The licensee shall ensure (5) Le titulaire de licence doit veiller à ce que : (a) that all relevant information in respect of any a) toutes les données pertinentes concernant un formation flow test is properly recorded; and essai d’écoulement de formation soient consignées; (b) that the information referred to in paragraph b) les données visées à l’alinéa a) comprennent, (a) includes, if available, selon le cas : (i) the initial shut-in pressure, (i) la pression initiale de fond, (ii) all flow rates and pressures and the time at (ii) les débits et la pression mesurés en fonction which each measurement was taken, du temps, (iii) sufficient build-up pressure and flowing (iii) les données de remontée de pression et de pressure data to calculate the permeability pression d’écoulement nécessaires pour and the static reservoir pressure, pouvoir calculer la perméabilité et la pression statique du réservoir, (iv) the total volume of fluid recovered and the (iv) le volume total et le volume de chaque type volume of each type of fluid produced, and de fluide récupéré, (v) the temperature and pressure in the well at (v) la température et la pression du puits en the point and at the time any fluid sample fonction de la profondeur et du temps de was taken. prélèvement des échantillons de fluides. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 89 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 114. Article 114. 114. Extended flow test programs (Programme d’essais d’écoulement prolongés) 114. Extended flow test programs 114. Programme d’essais d’écoulement prolongés (1) The Chief Operations Officer may approve an (1) Le délégué aux opérations peut approuver, pour extended formation flow testing program for a well on un puits, un programme d’essais d’écoulement de being satisfied that the program will enable the formation prolongés s’il est d’avis que ce programme licensee of the well to permettra au titulaire de licence du puits : (a) obtain data on the deliverability or productivity a) de recueillir des données sur le débit soutirable of the well; ou la productivité du puits; (b) establish the characteristics of the reservoir; b) de déterminer les caractéristiques du réservoir. and (c) obtain representative samples of the formation fluids. (2) The licensee shall comply with the Canadian (2) Le titulaire de licence doit respecter les exigences Petroleum Safety Council’s Industry Recommended relatives aux dispositifs et aux procédures d’essais Practices (IRP), Volume 4, Well Testing and Fluid d’écoulement de formation prolongés stipulées au Handling for procedures and equipment specifications volume 4 (IRP) intitulé Well Testing and Fluid Handling, for extended formation flow testing except to the d’une série de publications intitulée Industry extent that they are inconsistent with or in conflict with Recommended Practices publiées par le Canadian these Regulations. Petroleum Safety Council, dans la mesure où ces exigences ne sont pas en contradiction avec les normes du présent règlement. (3) When an extended flow test is carried out on a (3) Le titulaire de licence doit présenter sur une base development well or exploratory well on any day, the quotidienne au ministre, les résultats des essais licensee shall prepare a report of the results of the test d’écoulement prolongés qu’il effectue dans un puits on that day and submit it to the Minister by the end of d’exploration ou un puits de développement, avant la the next day. fin de la journée suivant la date de l’essai. 115. Well testing completed wells (Essais de puits achevés) 115. Well testing completed wells 115. Essais de puits achevés (1) The licensee of a well shall not conduct a well test (1) Il est interdit au titulaire de licence d’un puits de on the well unless the Chief Operations Officer has mener des essais dans un puits à moins que le délégué approved, pursuant to subsection (2), a well testing aux opérations n’ait approuvé un programme d’essai program in respect of the well. du puits en application du paragraphe (2). (2) The Chief Operations Officer may approve a well (2) Le délégué aux opérations peut approuver un testing program on being satisfied that the program programme d’essai de puits s’il est d’avis que ce will enable the licensee to programme permettra au titulaire de licence : (a) obtain data on the deliverability or productivity a) de recueillir des données sur le débit soutirable of the well; ou la productivité du puits; (b) establish the characteristics of the reservoir; b) de déterminer les caractéristiques du réservoir; and (c) obtain representative samples of the formation c) d’obtenir des échantillons représentatifs des fluids. fluides de formation. (3) When a well is subjected to a well operation that (3) Lorsqu’un puits fait l’objet d’une exploitation could change the deliverability, productivity or susceptible d’en changer le débit soutirable, la injectivity of the well, the licensee shall, immediately productivité ou l’injectivité, le titulaire de licence doit, Page 90 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 116. Article 116. after the well operation is completed, perform a well dès que cesse l’exploitation du puits, mener un essai de test approved by the Chief Operations Officer to puits approuvé par le délégué aux opérationsafin de determine the effects of the well operation on the déterminer les effets de cette exploitation sur les deliverability, productivity or injectivity of the well. caractéristiques ci-dessus mentionnées. (4) The licensee shall conduct every well test and (4) Le titulaire de licence qui essaie ou évalue un puits evaluation of the well in accordance with the well doit le faire conformément au programme d’essai testing program approved pursuant to subsection (2). approuvé en application du paragraphe (2). (5) If the Chief Operations Officer requests to be (5) À la demande du délégué aux opérations, le informed by the licensee of the licensee’s intention to titulaire de licence doit l’informer de son intention de conduct a well test on a well, the licensee shall inform mener un essai dans un puits, et ce au moins 48 the Chief Operations Officer at least 48 hours before heures avant le début de l’essai. the licensee conducts the test. (6) The licensee shall comply with the procedures and (6) Le titulaire de licence doit respecter les exigences equipment specifications for well testing in the relatives aux dispositifs et aux procédures d’essais de Canadian Petroleum Safety Council’s Industry puits stipulées au volume 4 (IRP) intitulé Well Testing Recommended Practices (IRP), Volume 4, Well Testing and Fluid Handling, d’une série de publications intitulée and Fluid Handling except to the extent that they are Industry Recommended Practices publiées par le inconsistent with or in conflict with these Regulations. Canadian Petroleum Safety Council, dans la mesure où ces exigences ne sont pas en contradiction avec les normes du présent règlement. (7) When a well test is carried out on a well, the (7) Le titulaire de licence doit présenter au ministre, licensee shall record the results of the well test and une copie du contrôle de chantier des résultats de submit a field copy of those results to the Minister chaque essai qu’il mène dans un puits, avant la fin de before the end of the day following the day on which la journée qui suit la date d’achèvement de l’essai. the well test was completed. 116. Well sample transportation (Manutention des échantillons) 116. Well sample transportation 116. Manutention des échantillons (1) The licensee of a well shall ensure that every core (1) Le titulaire d’une licence de puits doit veiller à ce and every sample of drill cuttings or well fluid that is que les échantillons de déblais de forage, les carottes et taken from the well in compliance with these les échantillons de fluides prélevés dans un puits Regulations is transported and stored in a manner that conformément au présent règlement soient prevents any loss or deterioration of the core or manutentionnés de façon à éviter la perte de la matière sample. ou sa détérioration. (2) The licensee must not transport (2) Il est interdit au titulaire de licence de transporter : (a) any sample of well fluid that is collected for a) un échantillon de fluides prélevé dans un puits purposes of analysis in a plastic container or in pour fin d’analyse, dans un contenant en any other container that may cause or permit plastique ou tout autre contenant d’une nature the chemical properties of the sample to be à pouvoir causer ou permettre une modification significantly altered; or notable des propriétés chimiques de l’échantillon; (b) any sample of gas the pressure of which is b) un échantillon de gaz sous une pression greater than the pressure rating of the gas supérieure à la pression nominale du container. contenant. (3) The licensee shall ensure that the container with (3) Le titulaire de licence doit veiller à ce que le which any sample of well fluid is taken is contenant servant au prélèvement de l’échantillon de fluides prélevé dans un puits soit : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 91 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 117. Article 117. (a) constructed of a material that ensures that the a) constitué d’un matériel permettant sa sample can be safely transported; and manutention en sécurité; (b) numbered, properly labelled and accompanied b) numéroté, étiqueté et accompagné des by information setting out renseignements suivants : (i) the name of the well and the depth at which (i) la désignation du puits et la profondeur à the sample was taken, laquelle l’échantillon a été prélevé, (ii) the date and the means by which the sample (ii) la date et le mode de prélèvement de was obtained, and l’échantillon, (iii) if applicable, the type and the number of the (iii) s’il y a lieu, le type et le numéro de l’essai wireline test. d’écoulement au câble. 117. Analysis of fluid samples (Analyse des échantillons de fluides) 117. Analysis of fluid samples 117. Analyse des échantillons de fluides Unless otherwise permitted by the Chief Operations Sauf autorisation contraire du délégué aux opérations, Officer, the licensee of an exploratory well or le titulaire d’une licence de puits d’exploration ou de development well shall ensure that puits de développement doit veiller à ce que les conditions suivantes soient respectées : (a) for every formation that is tested by a a) pour chaque formation faisant l’objet d’un essai formation flow test, wireline test or well test, a d’écoulement de formation, d’un essai au câble sample of gas, condensate, oil and water is ou d’un essai de puits, un échantillon de gaz, obtained from the well; de condensat, de pétrole et d’eau sont prélevés du puits; (b) each sample of oil referred to in paragraph (a) b) chaque échantillon de pétrole visé à l’alinéa a) is analyzed to determine est analysé afin de déterminer: (i) its constituent compounds and the relative (i) ses constituants et leur proportion dans le proportion of each of the compounds, mélange, (ii) its water-free and sediment-free density in (ii) sa densité anhydre et sans sédiments, en kg/m3 at 15°C, kg/m3 à 15°C, (iii) its viscosity measured at two different (iii) sa viscosité à deux températures ayant un temperatures with a variance of at écart minimal de 20°C, least 20°C, and (iv) its water-free and sediment-free sulphur (iv) sa teneur en soufre après élimination de content in weight percent; l’eau et des sédiments, en pourcentage du poids; (c) each sample of gas referred to in paragraph (a) c) chaque échantillon de gaz visé à l’alinéa a) est is analyzed to determine analysé afin de déterminer : (i) its constituent compounds and the relative (i) ses constituants et leur proportion dans le proportion of each of the compounds in mélange, mesurés en moles/mole, y inclus moles/mole, including hydrogen sulphide and l’hydrogène sulfuré et le dioxyde de carbone, carbon dioxide, (ii) its density in kg/m3, (ii) sa densité en kg/m3, (iii) its gross heating value in its dry acid-gas (iii) son pouvoir calorifique brut, à l’état sec et free condition at standard atmospheric exempt de gaz acide, aux conditions pressure and temperature, and normales de référence, Page 92 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 118. Article 118. (iv) its pseudo-critical temperature and (iv) sa pression et sa température pressure; pseudocritiques; (d) each sample of water referred to in paragraph d) chaque échantillon d’eau visé à l’alinéa a) est (a) is analyzed to determine analysé afin de déterminer : (i) its chloride content in g/m3, (i) son contenu de chlorure en g/m3, (ii) its resistivity in ohm-m at 25°C, (ii) sa résistivité en ohm-m à 25°C, (iii) its total solids content at ignition in g/m3; (iii) sa teneur totale en solides à l’allumage en g/m3; (e) each sample of condensate referred to in e) chaque échantillon de condensats visé à l’alinéa paragraph (a) is analyzed to determine its a) est analysé afin de déterminer sa densité water-free and sediment-free density in kg/m3 anhydre et sans sédiments, en kg/m3 à 15°C; at 15°C; and (f) if the well produces more than one fluid phase, f) si le puits produit plus d’une phase fluide, un the analysis of a recombined sample is made to échantillon reconstitué est analysé afin de determine the physical and chemical factors déterminer les facteurs physiques et chimiques that affect the performance of the reservoir of qui influent sur le rendement du réservoir. the well. 118. Fluid samples from completed well (Échantillons de fluides de puits achevés) 118. Fluid samples from completed well 118. Échantillons de fluides de puits achevés (1) When a well is completed in a pool, the licensee of (1) Lorsqu’il achève un puits dans un gisement, le the well shall, if it would contribute to the evaluation of titulaire de la licence du puits, si cela est utile pour the pool or the field in which the pool is located, l’évaluation du gisement ou du champ, doit prendre l’une ou l’autre des mesures suivantes : (a) take a bottom hole sample of reservoir fluids a) il prélève un échantillon de fluides du réservoir from the well; or au fond du puits; (b) if it is not practicable to take a bottom hole b) s’il n’est pas possible de prélever un échantillon sample of reservoir fluids from the well, collect de fluides au fond du puits, il prélève un a sample of the produced fluids at the surface échantillon de fluides à la surface et le of the well and recombine them at the initial reconstitue d’après les conditions initiales du reservoir conditions. réservoir. (2) The licensee shall obtain and analyze samples of (2) Le titulaire de licence doit recueillir et analyser des oil, gas and water collected at the surface of a échantillons de pétrole, de gaz et d’eau à la surface sufficient number of wells to determine the d’un nombre suffisant de puits pour pouvoir composition of the fluids in the pool déterminer la composition des fluides du gisement : (a) at least once every 12 months; and a) au moins une fois par année; (b) whenever there is reason to believe that the b) chaque fois qu’il y a lieu de croire que la composition of a fluid produced from a pool has composition d’un fluide produit a changé. changed. (3) The licensee shall collect the samples of oil or gas (3) Le titulaire de licence prélève les échantillons de referred to in subsection (1) or (2) in accordance with pétrole ou de gaz visés au paragraphe (1) ou (2) the Chief Operations Officer’s directions. conformément aux directives du délégué aux opérations. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 93 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 118. Article 118. (4) When water is produced from a well, the licensee (4) Lorsque de l’eau est extraite d’un puits, le titulaire shall de licence doit : (a) determine in accordance with good production a) déterminer selon une saine méthode de practice whether formation water is being production, s’il s’agit de l’eau de formation; produced from the well; and (b) collect samples from the well and analyze them b) prélèver des échantillons dans le puits et les to determine the probable source of the water. analyser afin de déterminer l’origine probable de l’eau. (5) The licensee shall analyze water samples collected (5) Les échantillons d’eau visés aux paragraphes (1), under subsection (1), (2) or (4) in accordance with the (2) et (4) sont analysés conformément à la norme API American Petroleum Institute’s Recommended Practice RP 45 intitulée Recommended Practice for Analysis of for Analysis of Oilfield Waters (API Recommended Oilfield Waters, publiée par le American Petroleum Practice 45). Institute. (6) The licensee shall prepare a compositional analysis (6) Le titulaire de licence doit présenter au délégué aux of representative fluid from the pool and a description opérations les résultats d’analyse de la composition du of the general physical properties of the gas and liquid fluide représentatif du gisement et une description des components of the fluid as determined in accordance propriétés physiques générales de ses constituants with the following in addition to the requirements of liquides et gazeux, déterminées selon les normes paragraphs 117(b) to (e) mentionnées aux alinéas 117b) à e), et les normes suivantes : (a) for gas, the composition in moles/mole shall be a) pour le gaz, la composition en moles/mole doit converted to litres/1,000m3 at standard être convertie en litres/1 000 m3 aux conditions atmospheric pressure and temperature; normales de référence; (b) for water, the following shall be determined b) pour l’eau, les propriétés suivantes doivent être données: (i) the percentage of each of the solids, (i) le pourcentage de chaque solide, y inclus le including chloride, bromide iodide, chlorure, le bromure, l’iodure, le carbonate, carbonate, bicarbonate, hydroxide, sulphate, le bicarbonate, l’hydroxide, le sulphate, le calcium, magnesium and sodium, calcium, le magnésium et le sodium, (ii) the total solid content, by evaporation (ii) la teneur totale de matières solides, at 110∞C and 180∞C, obtenues par évaporation à 1100C et à 1800C, (iii) the density in kg/m3, (iii) la densité en kg/m3, (iv) the pH, (iv) la valeur de son pH, (v) the hydrogen sulphide content in g/m3, and (v) la teneur d’hydrogène sulfuré en g/m3, (vi) the refractive index at 250C; (vi) l’indice de réfraction à 250C; (c) for condensate, the mole fractions and liquid c) pour le condensat, les fractions molaires et la composition in moles/mole and the molecular composition liquide en moles/mole et le poids weight of the heptanes plus fraction in g/mole moléculaire de la fraction heptane plus en shall be determined; g/mole doivent être données; (d) for combined gas and condensate, the following d) pour les gaz et le condensat combinés, les shall be determined propriétés suivantes doivent être données: Page 94 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 8 PARTIE 8 Section 119. Article 119. (i) the mole fractions and gas composition in (i) leurs fractions molaires et leur composition moles/mole, gazeuse en moles/mole, (ii) the molecular weight in g/mole of the (ii) leurs poids moléculaire de la fraction heptanes plus fraction, heptane plus en g/mole, (iii) the density in kg/m3 measured or calculated (iii) leur densité en kg/m3 mesurée ou calculée à from the recombined analysis, partir de l’analyse recombiné, (iv) the pseudocritical pressure and temperature (iv) leur pression et température pseudocritiques calculated from the recombined analysis, calculées à partir de l’analyse recombiné, (v) the molecular weight and density in kg/m3 (v) le poides moléculaire et la densité en in of liquid hydrocarbons, and kg/m3 des hydrocarbures liquides, (vi) the liquid to gas ratio in m3/m3. (vi) le rapport liquide-gaz en m3/m3. 119. Pool pressure surveys and measurements (Détermination de la pression dans un gisement) 119. Pool pressure surveys and measurements 119. Détermination de la pression dans un gisement (1) Before the licensee of a well begins production (1) Avant de mettre en production une intervalle from a completion interval of the well, the licensee shall d’achèvement d’un puits, le titulaire de licence du puits determine the static pressure of the pool at the doit déterminer la pression statique du gisement au completion interval. niveau de la partie achevée. (2) The licensee shall conduct a pool pressure survey (2) Le titulaire de licence doit mener un essai de to determine the pool’s static pressure 12 months after pression dans un gisement afin d’en déterminer la the pool is initially put into production and at least once pression statique douze mois après la mise en every 12 months thereafter. production initiale du gisement et au moins une fois tous les douze mois par après. (3) The licensee shall, at least 60 days before carrying (3) Au moins 60 jours avant de mener l’essai de out a pool pressure survey referred to in pression visé au paragraphe (2), le titulaire de licence subsection (2), submit to the Minister for the approval doit présenter au ministre, en vue d’obtenir of the Chief Operations Officer a pressure survey l’approbation du délégué aux opérations, un program that indicates the method of surveying and, if programme précisant la méthode envisagée pour applicable, the physical location of a sufficient number mener l’essai en question et, s’il y a lieu, les of wells to be shut in so as to allow for an accurate coordonnées d’un nombre suffisant de puits à fermer determination of the pool’s static pressure. pour permettre une détermination précise de la pression statique du gisement. (4) The Chief Operations Officer may approve (4) Le délégué aux opérations peut approuver les mesures suivantes : (a) a pool pressure survey program submitted a) le programme d’essai de pression présenté en pursuant to subsection (3) if the application du paragraphe (3) s’il est d’avis que implementation of the program will produce an ce programme permettra de déterminer avec accurate determination of the static pressure of précision la pression statique du gisement; the pool; and (b) a schedule for conducting a pool pressure b) un horaire pour l’essai de pression différent de survey other than at the times described in celui décrit au paragraphe (2), s’il est d’avis subsection (2) if the schedule is justified by que les besoins opérationnels le justifient. operational factors. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 95 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 120. Article 120. (5) When wells completed in the same pool have (5) Lorsque plusieurs puits achevés dans le même different licensees, those licensees are collectively gisement relèvent de plusieurs titulaires de licences, responsible for complying with subsections (2) and (3).
Part document.segment-9
Oil and Gas Drilling and Production Regulations — segment 9
- document.segment-9 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 9
AI-assisted research summary: Licensees of wells must keep operating manuals, notify the Minister of production changes, follow production and testing rules, and comply with strict limits on flaring, venting, and commingled production unless approved by the Chief Operations Officer.
ceux-ci sont solidairement responsables de se conformer aux exigences des paragraphes (2) et (3). PART 9 (PARTIE 9) PART 9 PARTIE 9 PRODUCTION OPERATIONS (ACTIVITÉS DE PRODUCTION) PRODUCTION OPERATIONS ACTIVITÉS DE PRODUCTION 120. Operating manuals (Manuels d’utilisation) 120. Operating manuals 120. Manuels d’utilisation (1) The licensee of a well shall prepare an operating (1) Le titulaire d’une licence de puits doit élaborer un manual for all normal production operations carried manuel d’utilisation pour toutes les activités de out by the licensee and for all abnormal conditions or production effectuées par le titulaire de licence, et pour situations that can be reasonably anticipated during toutes les conditions ou les situations inhabituelles those operations. raisonnablement prévisibles dans le cadre de ces activités. (2) The licensee shall ensure that a copy of the (2) Le titulaire de licence doit veiller à ce qu’un operating manual referred to in subsection (1) is exemplaire de chaque manuel d’utilisation visé au paragraphe (1) : (a) kept at the well site or the site of any field a) soit conservé sur place en chantier ou dans facility associated with the well; and l’installation de champ y reliée; (b) available for examination on request by any b) puisse être consulté sur demande par tout person at the well site or the field facility site, membre du personnel sur le chantier ou dans as the case may be. l’installation de champ, selon le cas. 121. Notice of beginning or discontinuance of production (Avis de mise en production ou d’interruption de la production) 121. Notice of beginning or discontinuance of 121. Avis de mise en production ou production d’interruption de la production A notice of the beginning or discontinuance of Le titulaire de licence doit aviser le ministre par écrit production from a well must be submitted by the d’une mise en production ou d’une interruption de la licensee of the well to the Minister within seven days production dans les sept jours suivant la date de mise following the date on which the well is placed on en production continue du puits, ou d’interruption de la continuous production or discontinues production, as production, selon le cas. the case may be. 122. Maximizing recovery (Récupération maximale) 122. Maximizing recovery 122. Récupération maximale (1) The licensee of a well shall, if practicable, correct (1) Dans la mesure du possible, le titulaire de licence immediately any mechanical well condition that may d’un puits doit corriger sans tarder tout problème have a negative effect on production of oil and gas mécanique susceptible de nuire à la production de from or injection of fluids into the well. pétrole ou de gaz d’un puits ou à l’injection de fluide dans un puits. (2) The licensee shall improve the injection or (2) Le titulaire de licence doit améliorer le programme production profile of the well or alter the completion d’injection ou de production ou modifier l’intervalle interval of the well when it is necessary to do so to d’achèvement d’un puits lorsque cela s’avère nécessaire avoid significant loss in ultimate recovery of oil and afin d’éviter une réduction importante de la quantité gas. totale de pétrole ou de gaz récupérée. Page 96 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 123. Article 123. 123. Reservoir management (Gestion du réservoir) 123. Reservoir management 123. Gestion du réservoir (1) Subject to these Regulations, the licensee shall (1) Sous réserve du présent règlement, le titulaire de locate wells so as to provide, to the extent possible, for licence doit, dans la mesure du possible, disposer les maximum recovery of oil or gas from a pool. puits de façon à permettre la récupération maximale du pétrole et du gaz du gisement. (2) The licensee shall carry out and, on the request of (2) Le titulaire de licence doit étudier l’intérêt du the Chief Operations Officer, submit to the Minister, forage intercalaire et de la récupération assistée et infill drilling studies and enhanced recovery studies if présenter les résultats au ministre sur demande du the licensee or Chief Operations Officer has reason to délégué aux opérations, si lui-même ou le délégué aux believe that infill drilling or implementation of an opérations a des raisons de croire que l’une ou l’autre enhanced recovery scheme could result in economically de ces méthodes permettrait une récupération plus increased recovery of oil or gas from a pool. rentable du pétrole ou du gaz d’un gisement. (3) Production must not be taken from a gas well (3) Il est interdit de produire à partir d’un puits de gaz completed in a gas cap associated with an oil achevé dans un chapeau de gaz avec accumulation de accumulation except in accordance with a scheme pétrole afférente, sauf en conformité avec un plan, respecting production from that gas cap approved by approuvé par le délégué aux opérations, portant sur la the Chief Operations Officer. production à partir de ce chapeau de gaz. 124. Voidage replacement (Désaturation évitée) 124. Voidage replacement 124. Désaturation évitée (1) When a licensee carries out an enhanced recovery (1) Le titulaire de licence qui exécute un plan de scheme in an oil pool that involves pressure récupération assistée dans un gisement de pétrole maintenance, the licensee shall not nécessitant le maintien de la pression du gisement, ne doit pas : (a) inject fluid into the pool on a basis other than a a) injecter du fluide dans le gisement, que selon le well-pattern basis or pool basis; schéma d’implantation du puits ou du gisement; (b) inject fluid into the pool at a volume greater or b) injecter dans le gisement un volume de fluide less than that being withdrawn except in inférieur ou supérieur à celui qui est extrait du accordance with the Scheme Approval; or gisement, sauf en conformité avec l’approbation de plan; (c) permit a rate of production from the pool that c) autoriser un taux de production qui results in a lower pool pressure than the pool engendrerait dans le gisement une pression pressure set out in the Field Facility Licence or moindre que celle qui est indiquée dans la the Scheme Approval. licence d’installation de champ ou l’approbation de plan. (2) The Scheme Approval may provide for an (2) L’approbation de plan peut prévoir un déséquilibre imbalance of volumes or a different rate of production des volumes ou un taux de production différent si la if the ultimate recovery from the pool will not be récupération totale de pétrole ou de gaz du gisement reduced. ne s’en trouvera pas réduite. (3) The licensee shall maintain the volumes or rate (3) Le titulaire de licence doit s’en tenir aux volumes et specified in the Scheme Approval. aux taux visés dans l’approbation de plan. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 97 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 125. Article 125. 125. Multi-pool wells (Puits de gisements multiples) 125. Multi-pool wells 125. Puits de gisements multiples (1) When different pressure and inflow characteristics (1) Lorsqu’un puits traverse deux ou plusieurs of two or more pools could negatively affect recovery of gisements dont les différences de pression et de débit oil and gas from any of those pools, the licensee of a risque d’être préjudiciable à la récupération du pétrole well that penetrates any of those pools shall operate et du gaz de l’un quelconque de ces gisements, le the well titulaire de la licence pour ce puits doit l’exploiter de l’une des façons suivantes : (a) as a single pool well; a) comme un puits d’un gisement simple; (b) as a segregated multi-pool well; or b) comme un puits de gisements séparés multiples; (c) in any other manner that minimizes, to the c) de toute autre façon permettant de réduire au greatest possible degree, the interflow between minimum la circulation de fluide entre les the pools. différents gisements. (2) The licensee of a segregated multi-pool well shall (2) Dans le cas d’un puits de gisements séparés multiples, le titulaire de licence doit : (a) after the well is completed, conduct a a) après que le puits est achevé, effectuer un essai segregation test to confirm that segregation d’isolement afin de vérifier que l’étanchéité a has been established within and outside the été réalisée à l’intérieur comme à l’extérieur du well casing; tubage; (b) conduct a segregation test immediately if the b) effectuer un essai d’isolement dès qu’il licensee has reason to doubt that segregation is soupçonne une communication entre les being maintained; and gisements; (c) separately measure production from or c) mesurer la production de, ou l’injection dans injection into each pool in accordance with chaque gisement séparément, en conformité Part 11. avec la partie 11 du présent règlement. 126. Commingled production (Production mélangée) 126. Commingled production 126. Production mélangée (1) The licensee of a well must not produce oil or gas (1) Il est interdit au titulaire d’une licence de puits from more than one pool in a commingled flow through d’exploiter par un seul trou de sonde ou une seule a common well bore or flowline without separate conduite d’écoulement, plusieurs gisements en measurement of the oil or gas except in accordance production mélangée, sans mesurer le pétrole et le gaz with a scheme approved by the Chief Operations séparément, sauf aux termes d’un plan approuvé par le Officer. délégué aux opérations. (2) The Chief Operations Officer may refuse to issue a (2) Le délégué aux opérations peut refuser de délivrer Scheme Approval under subsection (1) with respect to une approbation de plan en vertu du paragraphe (1) à commingled production from more than one pool l’égard de la production mélangée à partir de plusieurs unless the Chief Operations Officer is satisfied that the gisements, sauf s’il est d’avis que la récupération totale production will not reduce the ultimate recovery of oil de pétrole ou de gaz des gisements ne s’en trouvera or gas from the pools. pas réduite. (3) A licensee engaging in commingled production (3) Le titulaire de licence qui exploite des gisements en from more than one pool shall estimate the total production mélangée doit estimer le volume total et le volume and the rate of production of each fluid taux de production de chaque fluide produit dans produced from each pool. chacun des gisements. Page 98 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 127. Article 127. 127. Flaring and venting of gas (Brûlage à la torche et aération de gaz) 127. Flaring and venting of gas 127. Brûlage à la torche et aération de gaz (1) The licensee of a well or field facility must not (1) Il est interdit au titulaire d’une licence de puits ou permit the discharge into the atmosphere from the well d’installation de champ de permettre le rejet de gaz or field facility of any gas produced except by flaring or dans l’atmosphère, sauf par le brûlage à la torche ou venting and then only if the flaring or venting is l’aération et seulement lorsque ces mesures sont authorized by or pursuant to this section. autorisées en vertu du présent article, et en application avec celui-ci. (2) Subject to this section, the licensee of a well or (2) Sous réserve du présent article, le titulaire d’une field facility may discharge gas to the atmosphere from licence de puits ou d’installation de champ peut rejeter the well or field facility by flaring or venting dans l’atmosphère, du gaz émanant du puits ou de l’installation de champ, par le brûlage à la torche ou l’aération dans l’un quelconque des cas suivants : (a) if the flaring or venting is authorized by a) si le brûlage à la torche ou l’aération est subsection (3); autorisé par les dispositions du paragraphe (3); (b) during a production operation, if authorization b) si, au cours des activités de production, to do so is contained a Well Operation Approval, l’autorisation de le faire relève du document Field Facility Licence or Scheme Approval, as d’autorisation d’exploitation du puits, de la the case may be, and then only at the rate and licence d’installation de champ ou de volume, and for the period, specified in the l’approbation de plan, selon le cas, et Approval or Licence; or seulement au taux, au volume, et pour la durée précisés dans le document d’autorisation ou la licence; (c) if the flaring or venting is authorized by the c) si le brûlage à la torche ou l’aération est Chief Operations Officer on application, autorisé par le délégué aux opérations, sur whether the authorization is contained in an demande, que l’autorisation elle-même relève approval issued under these Regulations or in a d’un document d’approbation délivré en vertu separate document, and then only at the rate du présent règlement ou d’un autre document, and volume, and for the period, specified in the et seulement au taux, au volume, et pour la approval. durée précisés dans le document d’approbation. (2) Subject to this section, the licensee of a well or (2) Sous réserve du présent article, le titulaire d’une field facility may discharge gas to the atmosphere from licence de puits ou d’installation de champ peut rejeter the well or field facility by flaring or venting dans l’atmosphère, du gaz émanant du puits ou de l’installation de champ, par le brûlage à la torche ou l’aération, dans l’un quelconque des cas suivants : (a) if the flaring or venting is authorized by a) si le brûlage à la torche ou l’aération est subsection (3); autorisé par les dispositions du paragraphe (3); (b) during a production operation, if authorization b) si, au cours des activités de production, to do so is contained a Well Operation Approval, l’autorisation de le faire relève du document Field Facility Licence or Scheme Approval, as d’autorisation d’exploitation du puits, de la the case may be, and then only at the rate and licence d’installation de champ ou de volume, and for the period, specified in the l’approbation de plan, selon le cas, et Approval or Licence; or seulement au taux et au volume, et pour la durée précisés dans le document d’autorisation ou la licence; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 99 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 127. Article 127. (c) if the flaring or venting is authorized by the c) si le brûlage à la torche ou l’aération est Chief Operations Officer on application, autorisé par le délégué aux opérations, sur whether the authorization is contained in an demande, que l’autorisation elle-même relève approval issued under these Regulations or in a d’un document d’approbation délivré en vertu separate document, and then only at the rate du présent règlement ou d’un autre document, and volume, and for the period, specified in the et seulement au taux et au volume, et pour la approval. durée précisés dans le document d’approbation. (3) Subject to any requirements prescribed in the (3) Sous réserve de toute exigence stipulée dans les directions of the Chief Operations Officer, the licensee directives du délégué aux opérations, le titulaire d’une of a well may flare or vent gas during licence de puits peut effectuer le brûlage à la torche ou l’aération de gaz dans l’un des deux cas suivants : (a) a drilling operation or well operation over a a) au cours des travaux de forage ou de period not exceeding 24 hours at rates and l’exploitation du puits, pour une période volumes not greater than those necessary to s’étendant jusqu’à 24 heures, à des taux et à unload and clean up the well; or des volumes n’excédant pas ceux qui sont nécessaires au déchargement et au nettoyage du puits; (b) a production operation to relieve abnormal b) au cours des activités de production, afin de pressure or, if necessary, to deal with an décharger une pression anormale ou, si emergency. nécessaire, afin de traiter d’une situation d’urgence. (4) In an application for an authorization under (4) Dans sa demande d’autorisation en vertu de paragraph (2)(c), the licensee shall, in accordance with l’alinéa (2)c), le titulaire de licence doit, selon les the Chief Operations Officer’s directions, show that the directives du délégué aux opérations, démontrer qu’il a licensee has evaluated the following options for évalué, comme alternative au brûlage à la torche ou à disposing of produced gas as an alternative to flaring l’aération du gaz, les mesures suivantes pour or venting the gas l’élimination du gaz produit : (a) collection of the gas into a gas gathering a) la collecte du gaz dans un gazoduc de collecte; pipeline system; (b) clustering or bringing the gas from several b) la concentration du gaz de plusieurs puits ou wells or several field facilities to a common installations de champ en un point commun, y point, including collaboration with other inclus par le biais d’une collaboration avec licensees to enhance the economical disposal of d’autres titulaires de licences afin d’augmenter the gas by those means; la rentabilité de l’élimination du gaz par ces moyens; (c) using the gas to generate electricity; c) l’utilisation du gaz pour produire de l’électricité; (d) re-injection of the gas into the same pool or d) la ré-injection du gaz dans le même gisement into another formation pursuant to a scheme; ou dans une autre formation, selon un plan; (e) any other options described in the directions of e) toute autre mesure décrite dans les directives the Chief Operations Officer. du délégué aux opérations. Page 100 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 128. Article 128. (5) The Chief Operations Officer may refuse an (5) Le délégué aux opérations peut rejeter une application for an authorization under paragraph (2)(c) demande d’autorisation en vertu de l’alinéa (2)c), à for flaring or venting gas unless the Chief Operations moins qu’il soit d’avis que : Officer is satisfied that (a) the flaring or venting does not constitute waste a) le brûlage à la torche ou l’aération du gaz ne or an undue safety hazard; constitue ni des déchets ni un danger excessif; (b) all alternatives to flaring or venting the gas b) toutes les mesures alternatives au brûlage à la have been evaluated in accordance with torche ou à l’aération du gaz ont été évaluées subsection (4) and have been found to be en application du paragraphe (4) et ont été uneconomic; and trouvées non-rentables; (c) the application for the authorization contains all c) la demande d’autorisation contient tous les the information required by the Chief renseignements exigés dans les directives du Operations Officer’s directions. délégué aux opérations. (6) Despite anything in subsections (2) and (3), the (6) Malgré les dispositions des paragraphes (2) et (3), licensee of a well or field facility le titulaire d’une licence de puits ou d’installation de champ ne doit pas permettre : (a) must not permit the venting of any sour gas a) l’aération de gaz acide d’un puits ou d’un from a well or from an inflammable liquids réservoir de liquides inflammables à moins que storage tank unless the venting is expressly le procédé d’aération soit expressément authorized pursuant to paragraph (2)(c); and autorisé en vertu de l’alinéa (2)c); (b) must not permit the flaring of sour gas b) l’aération de gaz acide contenant plus de 50 containing more than 50 mol/kmol of hydrogen mol/kmol d’hydrogène sulfuré par volume à sulphide by volume unless the flaring is moins que le procédé d’aération soit autorisé permitted by the Well Licence or a Well par la licence de puits, l’autorisation Operation Approval, Scheme Approval or Field d’exploitation d’un puits, l’approbation de plan Facility Licence. ou la licence d’installation de champ. (7) Visible emissions of smoke from a site must not (7) Aucune émission visible de fumées provenant d’un occur except in emergency situations or with the chantier ne doit être tolérée, sauf dans une situation authorization of the Chief Operations Officer. d’urgence ou avec l’autorisation du délégué aux opérations. 128. Flare requirements (Exigences pour le brûlage à la torche) 128. Flare requirements 128. Exigences pour le brûlage à la torche Unless otherwise approved or directed by the Chief Sauf indication contraire du délégué aux opérations, les Operations Officer, any gas that is flared must be gaz devant être brûlés doivent être évacués par une discharged from a flare stack that cheminée à torche de brûlage conforme aux exigences suivantes : (a) is at least a) elle doit être placée à une distance minimale de : (i) 50 metres from any well, treater, separator, (i) 50 mètres de tout puits, purificateur compressor, crude oil storage tank or any d’hydrocarbures, séparateur compresseur, other unprotected source of ignitable réservoir de stockage de pétrole brut ou de vapours, and tout autre source vulnérable de vapeurs inflammables; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 101 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 9 PARTIE 9 Section 128. Article 128. (ii) 80 metres from any right-of-way, easement, (ii) 80 mètres de toute emprise, servitude, road, public utility, building, installation, route, installation, ou aire réservée à la works, place of public concourse or any défense nationale ou encore, de tout reservation for national defence, except only ouvrage, service public, édifice ou endroit when there may exist special circumstances public, sauf s’il existe des circonstances that, in the opinion of the Chief Operations spéciales qui, de l’avis du délégué aux Officer, justify the positioning of the stack at opérations, justifient l’emplacement de la a greater or lesser distance; cheminée à torche à plus grande ou courte distance; (b) is adequately anchored and suitably protected b) elle doit être bien ancrée et adéquatement against freezing; protégée contre le gel; (c) is designed to ensure flame stability and c) elle doit être conçue pour assurer la stabilité de efficient combustion; la flamme et une combustion efficace; (d) is of sufficient height and diameter to ensure d) elle doit être d’une hauteur et d’un diamètre suffisants pour: (i) that the average concentrations of hydrogen (i) assurer que les concentrations moyennes sulphide and sulphur dioxide in the ambient d’hydrogène sulfuré et d’anhydride sulfureux air do not exceed limits specified under the dans l’air ambiant ne dépassent pas les Workers’ Safety and Compensation Act, limites prescrites en vertu de la Loi sur la sécurité et l’indemnisation des travailleurs, [Subparagraph 128(d)(i) amended by O.I.C. 2022/119] [Sous-alinéa 128d)(i) modifié par Décret 2022/119] (ii) that vegetation combustion is prevented by (ii) prévenir l’incinération de la végétation maintaining an area free of vegetation and environnante, en maintenant une aire autour combustible debris around the base of the de sa base ou au bout de sa conduite, libre flare stack or the end of the flare line to the de toute végétation et de tous débris following minimum distances combustibles, jusqu’aux distances minimales suivantes: (A) 10 metres or 1.5 times the stack height, (A) dans les régions agricoles, à 10 mètres whichever is greater, in cultivated areas, ou 1,5 fois la hauteur de la torche, selon la plus grande distance, (B) 30 metres or 2.5 times the stack height, (B) dans les régions boisées, à 30 mètres whichever is greater, in forested areas, ou 2,5 fois la hauteur de la torche, selon la and plus grande distance, (C) 1.5 times the stack height, in any other (C) dans toute autre région, à 1,5 fois la area, hauteur de la torche, (iii) that a minimum stack height of 2.5 times (iii) faire en sorte qu’elle est toujours 2,5 fois la the height of the highest third party building hauteur de tout édifice d’une tierce partie, located within a distance equal to five times situé à une distance égale à cinq fois la the height of the building is maintained, and hauteur de l’édifice, (iv) that any heat generated around the base of (iv) assurer que toute chaleur produite autour de the stack does not exceed the sa base ne dépasse pas les spécifications du manufacturer’s specifications for any fabricant pour le matériel y situé, jusqu’à equipment situated there, to a maximum of une chaleur maximale de 4,73 kW/m m2; 4.73 kW/m2; Page 102 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 129. Article 129. (e) has a sufficient exit velocity and is provided e) sa vitesse d’échappement doit être suffisante et with guards or other features to prevent elle doit être munie de protecteurs et d’autres extinction of the flame; and dispositifs afin d’empêcher l’extinction de la flamme; (f) if the gas flow is intermittent, is provided with f) si l’écoulement de gaz est intermittent, la an ignition device to ensure continuous ignition torche doit être équipée d’un dispositif of any gases. d’allumage fonctionnant de façon continue. 129. Variation of regulations for unitized pool (Modification du règlement dans le cas d’un gisement faisant l’objet d’un accord d’union) 129. Variation of regulations for unitized pool 129. Modification du règlement dans le cas d’un gisement faisant l’objet d’un accord d’union When a pool or part of a pool is subject to a unit Lorsqu’un gisement ou une partie d’un gisement fait agreement, the Chief Operations Officer, on application, l’objet d’un accord d’union, le délégué aux opérations may order that any provision of the Act or these peut, si le titulaire de licence en fait la demande, exiger Regulations regarding the development and production que toute disposition de la Loi ou du présent règlement of the oil and gas resources be varied or suspended in visant le développement et l’exploitation des ressources the pool or part of the pool for the duration of gazières et pétrolières soit modifiée ou mise en operations under the unit agreement. veilleuse pour ce gisement ou cette partie de gisement, pour toute la durée des travaux effectués aux termes de l’accord d’union. PART 10 (PARTIE 10) PART 10 PARTIE 10 PRODUCTION RATES (TAUX DE PRODUCTION) PRODUCTION RATES TAUX DE PRODUCTION 130. Good production practices (Saines méthodes de production) 130. Good production practices 130. Saines méthodes de production The licensee of a well must not produce oil or gas from Le titulaire d’une licence de puits ne peut produire du a pool except in accordance with good production pétrole ou du gaz d’un gisement qu’en se conformant à practices to achieve maximum recovery of oil or gas de saines méthodes de production qui permettront de from the pool and at the applicable rates determined réaliser une récupération maximale de pétrole et de under this Part. gaz à partir de ce gisement, selon le taux applicable qui est précisé dans la présente partie. OIL PRODUCTION (PRODUCTION DE PÉTROLE) OIL PRODUCTION PRODUCTION DE PÉTROLE 131. Restriction of oil production (Restriction de la production) 131. Restriction of oil production 131. Restriction de la production (1) Production must not be taken from an oil well (1) Il est interdit d’extraire du pétrole d’un puits until a DOA or interim DOA application has been avant qu’une demande de production quotidienne approved by the Chief Operations Officer in accordance autorisée (PQAP) ou qu’une demande de production with subsection 132(1), except in such amounts as may quotidienne autorisée provisoire n’ait été approuvée be required for initial production or evaluation tests. par le délégué aux opérations conformément aux dispositions du paragraphe 132(1), sauf pour ce qui concerne les essais de production initiale et les essais d’évaluation. (2) Production from an oil well in any one day must (2) La production quotidienne de pétrole d’un puits ne not exceed the daily production limit for that well doit pas dépasser le contingent de production unless otherwise approved by the Chief Operations quotidienne pour ce puits, sauf approbation contraire Officer. du délégué aux opérations. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 103 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 132. Article 132. 132. Daily oil allowable (Production quotidienne autorisée de gaz) 132. Daily oil allowable 132. Production quotidienne autorisée de pétrole (1) An application for a DOA must be submitted to the (1) Une demande concernant la PQAP doit être Chief Operations Officer for the spacing area of each oil présentée au délégué aux opérations, pour l’unité well not subject to a unit agreement or scheme, and an d’espacement de chaque puits de pétrole ne faisant pas interim DOA may be approved by the Chief Operations l’objet d’une exploitation unitaire ou non visé par un Officer pending final approval of the DOA. plan, et une PQAP provisoire peut être approuvée par le délégué aux opérations en attendant son approbation finale de la PQAP. (2) For the purposes of this Part and Schedule C, the (2) Sauf en ce qui concerne les puits produisant unadjusted daily oil allowable or UDOA for an oil well is simultanément du pétrole et du gaz pour lesquels seul the greater of le volume de pétrole déterminé à partir des caractéristiques du réservoir pourrait s’appliquer, pour les besoins de la présente partie et de l’annexe C, la production quotidienne autorisée de pétrole avant ajustement ou PQAPAA pour un puits quelconque est le plus élevé des volumes suivants : (a) the volume of oil calculated in accordance with a) soit le volume de pétrole calculé en application Schedule C; and de l’annexe C; (b) the volume of oil determined from reservoir b) soit le volume déterminé à partir des parameters and approved by the Chief caractéristiques du réservoir et dont le délégué Operations Officer; aux opérations approuve. except for concurrent producers when the volume of oil determined from reservoir parameters may apply. (3) When approving an application for a DOA for an oil (3) Lorsqu’il approuve une demande de PQAP pour un well under subsection (1), the Chief Operations Officer puits de pétrole en vertu du paragraphe (1), le délégué shall direct whether the DOA is to be calculated aux opérations doit en prescrire la méthode de calcul, qui peut être : (a) by multiplying the UDOA for the well by a) soit de trouver le produit de la PQAPAA par l’une des valeurs suivantes : (i) the off-target penalty factor referred to in (i) le coefficient de pénalité pour zone hors cible subsection 18(5), and visé au paragraphe 18(5), (ii) the gas-oil ratio adjustment factor (ii) le facteur de correction du rapport gaz- determined in accordance with Schedule B; pétrole déterminé à partir des formules or visées à l’annexe B; (b) by a procedure approved or directed by the b) soit d’adopter une méthode qu’il a approuvée Chief Operations Officer. ou prescrite. (4) The DOA for a well may be amended by the Chief (4) La PQAP pour un puits peut être modifiée par le Operations Officer at any time délégué aux opérations à tout moment où survient l’une des situations suivantes : (a) when it appears to the Chief Operations Officer a) lorsqu’il est d’avis qu’un facteur utilisé pour that a factor used in the calculation of the DOA calculer la PQAP a été mal évalué; was wrongly evaluated; Page 104 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 132. Article 132. (b) when new information requires that the DOA b) lorsque l’apport de nouvelles données exige la be amended; or modification de la PQAP; (c) if an oil well completed in the same pool is c) lorsqu’un puits de pétrole achevé dans le même abandoned, altered or replaced. gisement est abandonné, modifié ou remplacé. (5) The Chief Operations Officer may establish (5) Le délégué aux opérations peut établir une marche procedures for periodic reviews of DOAs. à suivre pour la révision périodique de la PQAP. (6) For gas reinjection schemes, the gas-oil ratio (6) Dans le cas de plans de réinjection de gaz, le adjustment factor may be applied on the basis of net facteur de correction du rapport gaz-pétrole peut être gas offtakes. appliqué en fonction de la quantité nette de gaz dégagée. (7) For the purpose of applying Schedule C, (7) Pour l’application de l’annexe C : (a) the data used to calculate a gas-oil ratio a) les données utilisées pour calculer un facteur de adjustment factor must be data obtained for correction du rapport gaz-pétrole doivent avoir the last calendar month in which the oil well été obtenues pour le mois civil durant lequel le produced prior to the month for which the gas- puits était en production précédant celui pour oil ratio adjustment factor is required; lequel le facteur de correction du rapport gaz- pétrole est exigé; (b) the separator pressure for a single well is the b) dans le cas d’un puits unique, la pression au average separator pressure for the month in séparateur correspond à la pression moyenne kilopascals; relevée à l’appareil au cours d’un mois, et elle est exprimée en kilopascals; (c) if stage separation is used, the separator c) si la séparation se fait par phases, la pression pressure is that of the lowest pressure stage; au séparateur correspond à celle de la phase basse pression; (d) for a group of wells within a unit operation, the d) dans le cas d’un groupe de puits en exploitation separator pressure is the average separator unitaire, la pression au séparateur correspond pressure of the group of wells weighted by à la pression moyenne aux séparateurs des volume of oil produced; and différents puits, pondérée par le volume de pétrole produit; (e) if no separator pressure is reported, 400 kPa is e) si aucune pression au séparateur n’est considered to be the average separator enregistrée, la valeur à utiliser est de 400 kPa. pressure. (8) When the Chief Operations Officer has approved a (8) Dès que le délégué aux opérations a approuvé une unit agreement or scheme, exploitation unitaire ou un plan, : (a) the Chief Operations Officer may, on a) celui-ci peut, sur demande, approuver une application, approve a single DOA for all oil seule PQAP pour tous les puits de pétrole wells subject to the unit agreement or scheme; faisant l’objet de l’exploitation unitaire ou du and plan; (b) on an approval being granted under paragraph b) une fois l’approbation donnée en vertu de (a), this Part applies to all the wells subject to l’alinéa a), la présente partie s’applique à tous the unit agreement or scheme as though they les puits de pétrole faisant l’objet de were a single oil well. l’exploitation unitaire ou du plan, comme s’il s’agissait d’un puits unique. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 105 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 133. Article 133. (9) If, in the opinion of the Chief Operations Officer, (9) Si, de l’avis du délégué aux opérations, l’application the application of this section to a group of wells is des dispositions du présent article à un groupe de puits affecting adversely or would affect adversely the a ou pourrait avoir des répercussions néfastes sur la recovery of oil or gas from wells other than those in the récupération du pétrole ou du gaz sur des terres autres group, the Chief Operations Officer may limit the que celles où se trouvent les puits faisant partie du production of one or more wells in the group to its groupe, ce dernier peut limiter la production d’un ou de individual well DOA. plusieurs puits du groupe à la production individuelle quotidienne autorisée. 133. Test period allowable (Production autorisée pour une période d’essai) 133. Test period allowable 133. Production autorisée pour une période d’essai (1) During the test period for an oil well, the test (1) Au cours de la période d’essai d’un puits de period allowable is a volume of oil measured in cubic pétrole, la production autorisée correspond à un metres equal to the product of 90 days and the DOA for volume de pétrole mesuré en mètres cubes égal au the oil well, plus 500 cubic metres, and for that test produit de 90 jours par la PQAP, plus 500 m3, sans period a daily production limit does not apply and the contingent de production quotidienne ni facteur de gas-oil ratio adjustment factor determined under correction du rapport gaz-pétrole tel que visé au paragraph 132(2)(b) in respect of the DOA for that oil paragraphe 132(2)b). well is unity. (2) Subsection (1) does not apply to an oil well (2) Le paragraphe (1) ne s’applique pas aux puits de completed in a pool or part of a pool that is subject to a pétrole forés dans un gisement ou une partie d’un unit agreement or scheme, if a single DOA has been gisement faisant l’objet d’une exploitation unitaire ou approved for all oil wells subject to the unit agreement d’un plan, si une PQAP unique a été approuvée pour or scheme, as the case may be. tous ces puits, sous réserve de l’exploitation unitaire ou du plan, selon le cas. 134. Well test of oil wells (Essai de production de puits de pétrole) 134. Well test of oil wells 134. Essai de production de puits de pétrole (1) The licensee shall conduct at least two well tests (1) Un titulaire de licence doit réaliser au moins deux per month on each of the licensee’s oil wells the essais de puits par mois dans le cas de chaque puits production of which is delivered to a proration battery. dont la production est acheminée à une batterie de proration. (2) In conducting the tests under subsection (1), the (2) Au cours des essais réalisés en application du licensee shall measure the volumes of oil, water and paragraphe (1), le titulaire de licence doit mesurer les gas produced, and the tests must be of a duration volumes de pétrole, d’eau et de gaz produits; ces essais similar to the normal daily producing period and must doivent être d’une durée correspondant à la période de be adequately spaced throughout the month. production quotidienne normale et ils doivent être exécutés à intervalles convenables au cours du mois. (3) The licensee shall make a record of each test (3) Le titulaire de licence doit tenir un registre de conducted under subsection (1) and, if applicable, the chaque essai réalisé en application du paragraphe (1), record must consist of information required by the dans lequel il doit, le cas échéant, consigner les directions of the Chief Operations Officer in addition to renseignements exigés par les directives du délégué the following aux opérations, en plus des renseignements suivants : (a) the test date; a) la date de l’essai; (b) the duration of the test in hours; b) la durée de l’essai en heures; (c) the opening and closing meter readings; c) les lectures du compteur au début et à la fin de l’essai; Page 106 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 135. Article 135. (d) the oil and water meter factor; d) l’indice du compteur de pétrole et du compteur d’eau; (e) the percentage of sediment and water; e) le pourcentage de sédiments et d’eau; (f) the volumes of oil, water and gas produced f) les volumes de pétrole, d’eau et de gaz produits during the test; and au cours de l’essai; (g) the average separator pressure. g) la pression moyenne au séparateur. (4) The licensee shall keep the records made under (4) Le titulaire de licence doit conserver les subsection (3) for one year from the date they are renseignements consignés en application du made and must make them available to the Chief paragraphe (3) pendant une période d’un an à compter Operations Officer upon request. de la date où les essais sont réalisés, et les mettre à la disposition du délégué aux opérations lorsque celui-ci en fait la demande. (5) The Chief Operations Officer may, by order, in (5) Dans le cas d’un chantier particulier, le délégué aux relation to a particular site, exempt a licensee from all opérations peut, par arrêté et moyennant certaines or any of the provisions of this section. restrictions, exempter un titulaire de licence de se conformer aux prescriptions du présent article ou d’une partie du présent article. 135. Adjustment of oil production (Ajustement de la production de pétrole) 135. Adjustment of oil production 135. Ajustement de la production de pétrole (1) The overproduction or underproduction of each oil (1) La surproduction ou la sous-production d’un puits well or approved group of oil wells must be determined ou d’un groupe de puits approuvé doit être déterminée at the end of every month and the subsequent à la fin de chaque mois et, selon qu’elle est production of each oil well or group of oil wells must be excédentaire ou déficitaire par rapport à la production adjusted in accordance with these Regulations. autorisée, toute production subséquente doit être ajustée conformément aux dispositions du présent règlement. (2) At the end of every month, the production target (2) La production cible ainsi que la surproduction ou la and the overproduction or underproduction for each oil sous-production d’un puits ou d’un groupe de puits de well or group of oil wells must be calculated, except for pétrole doivent être calculées à la fin de chaque mois, those wells suspended with the approval of the Chief sauf en ce qui concerne les puits dont l’abandon Operations Officer, and a production allowable report provisoire a été approuvé par le délégué aux must be submitted by the licensee to the Minister in opérations, et un rapport sur la production autorisée time for it to be received on or before the 18th day of doit être remis par le titulaire de licence au ministre, the next month, which shall be the due date for the dans un délai permettant à celui-ci de le recevoir le ou report. avant le 18e jour du mois, lequel correspond à la date de remise du rapport. (3) If the report required by subsection (2) is not (3) Si le rapport mentionné au paragraphe (2) n’a pas received by the due date, the Chief Operations Officer été reçu à la date prévue, le délégué aux opérations may order the oil well or group of oil wells shut in until peut ordonner que le puits ou le groupe de puits de the report is received, at which time, subject to pétrole soit fermé jusqu’au moment de la réception du section 137, the well or group of wells may resume rapport, où la production pourra reprendre, sous production. réserve des dispositions de l’article 137. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 107 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 136. Article 136. 136. Underproduction of oil (Sous-production - Pétrole) 136. Underproduction of oil 136. Sous-production - Pétrole Underproduction of oil may be made up at any time Toute sous-production de pétrole peut être rattrapée within a production period at a rate not exceeding the en tout temps à l’intérieur d’une période de production daily production limit. donnée, à un rythme ne dépassant pas le contingent de production quotidienne. 137. Overproduction of oil (Surproduction - Pétrole) 137. Overproduction of oil 137. Surproduction - Pétrole If overproduction of oil at the beginning of any month Si la surproduction calculée en début de mois dépasse exceeds the monthly oil allowable, the licensee shall la production mensuelle autorisée de pétrole, le shut in the oil well on or before the 18th day of the titulaire de licence doit fermer le puits le ou avant month, and keep it shut in until the overproduction of le 18e jour du mois, et doit le garder fermé jusqu’à ce oil is completely retired. que la surproduction soit éliminée. GAS PRODUCTION (PRODUCTION DE GAZ) GAS PRODUCTION PRODUCTION DE GAZ 138. Gas well tests (Essais des puits de gaz) 138. Gas well tests 138. Essais des puits de gaz (1) The absolute open flow potential of a gas well (1) Le débit potentiel maximal absolu d’un puits de shall be determined by a method approved by the Chief gaz doit être déterminé selon une méthode approuvée Operations Officer. par le délégué aux opérations. (2) Unless otherwise approved by the Chief Operations (2) À moins que le délégué aux opérations n’en décide Officer, each gas well must be tested and the absolute autrement, c’est au titulaire de licence qu’il revient de open flow potential determined by the licensee and soumettre chaque puits de gaz à des essais et d’en approved by the Chief Operations Officer déterminer le débit potentiel maximal, puis d’obtenir l’approbation du délégué aux opérations : (a) before six months have elapsed after the well a) dans les six mois suivant la mise en production has been placed on production; du puits; (b) immediately after each workover performed on b) immédiatement après tout reconditionnement the well; and pratiqué sur le puits; (c) when requested by the Chief Operations c) au moment exigé par le délégué aux Officer. opérations. (3) A deliverability test, satisfactory to the Chief (3) Chaque puits de gaz producteur doit être soumis Operations Officer, must be conducted annually on annuellement à un essai de productivité conforme aux every producing gas well and a detailed report exigences du délégué aux opérations, et un rapport submitted to the Chief Operations Officer within 60 détaillé à cet égard doit lui être remis dans les 60 jours days of the date on which the test was completed. suivant la date d’exécution de l’essai. (4) If the Chief Operations Officer is satisfied that (4) Si le délégué aux opérations est d’avis que la sufficient deliverability history has been accumulated, productivité du puits en question a été suffisamment the Chief Operations Officer may, on application from démontrée, il peut, sur demande de l’ensemble des all licensees of gas wells in the pool, approve a request titulaires de licences des puits de gaz dans le gisement, for less frequent testing of those wells. approuver une réduction de la fréquence de mise à l’essai de ces puits. (5) A detailed report of any test made under these (5) Un rapport détaillé de tout essai réalisé en Regulations must be submitted within 60 days of the application du présent règlement doit être remis dans date on which the test was completed. les 60 jours suivant la date d’exécution de l’essai. Page 108 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 139. Article 139. 139. Restriction of gas production (Restrictions quant à la production de gaz) 139. Restriction of gas production 139.
Part document.segment-10
Oil and Gas Drilling and Production Regulations — segment 10
- document.segment-10 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 10
AI-assisted research summary: This provision limits gas production unless a DGA or interim DGA is approved, requires reporting of overproduction, and sets measurement, testing, calibration, and safety-plan rules for oil and gas operations.
Restrictions quant à la production de gaz (1) Production must not be taken from a gas well (1) Il est interdit d’extraire du gaz d’un puits pour requiring a DGA under subsection 140(1) until a DGA or lequel est exigée une PQAG en vertu du interim DGA application has been approved by the paragraphe 140(1), avant qu’une demande portant sur Chief Operations Officer in accordance with la PQAG ou la PQAG provisoire n’ait été approuvée par section 140, except in such amounts as may be le délégué aux opérations conformément aux required for initial production or evaluation tests. dispositions de l’article 140, sauf pour ce qui concerne les essais de production initiale et les essais d’évaluation. (2) Production from a gas well in any one day must (2) La production quotidienne de gaz d’un puits ne doit not exceed the daily production limit for that well pas excéder le contingent de production quotidienne unless otherwise approved by the Chief Operations prévu, sauf avec l’autorisation du délégué aux Officer. opérations. (3) The Chief Operations Officer, in the event of a gas (3) Dans le cas d’une situation d’urgence, le délégué supply emergency, may adjust or remove restrictions aux opérations peut provisoirement alléger ou lever les on gas production from any well for a temporary restrictions quant à la production de gaz. period. 140. Daily gas allowable (Production quotidienne autorisée de gaz) 140. Daily gas allowable 140. Production quotidienne autorisée de gaz (1) An application for a DGA must be submitted to the (1) Une demande portant sur la PQAG doit être Chief Operations Officer and an interim DGA may be présentée au délégué aux opérations, qui peut approved by the Chief Operations Officer pending final approuver une PQAG provisoire en attendant son approval of the DGA, for a gas well that is determined approbation finale de la PQAG, pour un puits de gaz by the Chief Operations Officer to be qu’il considère comme étant un puits : (a) completed off-target when correlative rights a) achevé hors zone, lorsque les droits corrélatifs are an issue; sont en litige; (b) producing under a concurrent production b) assujetti à un plan de production simultanée de scheme or gas cap production scheme; gaz et de pétrole ou à un plan de production à partir d’un chapeau de gaz; (c) producing from a retrograde condensate gas c) dont la production provient d’un réservoir de reservoir; gaz à condensation rétrograde; (d) producing from a pool with suspected water d) dont la production provient d’un gisement où drive; or l’on soupçonne un déplacement par expansion d’aquifère; (e) in any category when waste is an issue. e) de toute catégorie, où l’élimination des déchets est en cause. (2) For the purposes of this Part, the unadjusted daily (2) Sauf en ce qui concerne les puits produisant gas allowable or UDGA for a gas well is the greater of simultanément du pétrole et du gaz pour lesquels seul le volume de gaz déterminé à partir des caractéristiques du réservoir pourrait s’appliquer, pour les besoins de la présente partie, la production quotidienne autorisée de gaz avant ajustement ou PQAGAA pour un puits quelconque est le plus élevé des volumes suivants : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 109 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 10 PARTIE 10 Section 140. Article 140. (a) 60.0 x 103m3; and a) 60,0 x 103 m3; (b) the volume of gas determined from reservoir b) le volume de gaz déterminé à partir des parameters and approved by the Chief caractéristiques du réservoir et approuvé par le Operations Officer; délégué aux opérations. except for concurrent producers when the volume of gas determined from reservoir parameters may apply. (3) When approving an application for a DGA for a gas (3) Lorsqu’il approuve une demande de PQAG pour un well under subsection (1), the Chief Operations Officer puits de gaz en vertu du paragraphe (1), le délégué aux shall direct whether the DGA is to be calculated opérations doit en prescrire la méthode de calcul, qui peut être : (a) by multiplying the UDGA for the well by the off- a) soit en trouvant le produit de la PQAGAA par le target penalty factor referred to in coefficient de pénalité pour zone hors cible visé subsection 19(5); or au paragraphe 19(5); (b) by a procedure approved or directed by the b) soit d’adopter une méthode qu’il a approuvée Chief Operations Officer. ou prescrite. (4) The DGA for a well may be amended by the Chief (4) Le délégué aux opérations peut modifier la PQAG Operations Officer at any time pour un puits à tout moment où survient l’une des situations suivantes: (a) when it appears to the Chief Operations Officer a) lorsqu’il est d’avis que l’un des facteurs utilisés that a factor used in the calculation of the DGA pour calculer la PQAG a été mal évalué; was wrongly evaluated; (b) when new information requires that the DGA be b) lorsque l’apport de nouvelles données exige la amended; or modification de la PQAG; (c) if a gas well completed in the same pool is c) si un puits de gaz achevé dans le même abandoned, altered or replaced. gisement est abandonné, modifié ou remplacé. (5) The Chief Operations Officer may establish (5) Le délégué aux opérations peut élaborer une procedures for periodic reviews of DGAs. marche à suivre pour la révision périodique de la PQAG. (6) When the Chief Operations Officer has approved a (6) Dès que le délégué aux opérations a approuvé une unit agreement or scheme, exploitation unitaire ou un plan, : (a) the Chief Operations Officer may, on a) celui-ci peut, sur demande, approuver une application, approve a single DGA for all gas seule PQAG pour tous les puits de gaz faisant wells subject to the unit agreement or scheme; l’objet de l’exploitation unitaire ou du plan; and (b) on an approval being granted under paragraph b) une fois l’approbation donnée en vertu de (a), this Part applies to all the gas wells subject l’alinéa a), la présente partie s’applique à tous to the unit agreement or scheme as though les puits de gaz faisant l’objet de l’exploitation they were a single gas well. unitaire ou du plan, comme s’il s’agissait d’un puits unique. (7) If, in the opinion of the Chief Operations Officer, (7) Si, de l’avis du délégué aux opérations, l’application the application of this section to a unit operation is du présent article à une exploitation unitaire a ou affecting adversely or would affect adversely the pourrait avoir des répercussions néfastes sur la recovery of gas from wells other than those in the unit récupération du gaz sur des terres autres que celles où operation, the Chief Operations Officer may limit the se trouvent les puits faisant partie de l’exploitation Page 110 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 141. Article 141. production of one or more wells in the unit operation to unitaire, ce dernier peut limiter la production d’un ou its individual well DGA. de plusieurs puits du groupe à la production individuelle quotidienne autorisée. (8) On reviewing the evidence submitted by the (8) Après examen des preuves présentées par le licensee of a gas well referred to in subsection (1), the titulaire de licence d’un puits de gaz visé au Chief Operations Officer may exempt the gas well from paragraphe (1), le délégué aux opérations peut the requirement for a DGA under subsection (1). exempter le puits de l’exigence d’une PQAG en vertu du paragraphe (1). 141. Overproduction of gas (Surproduction de Gaz) 141. Overproduction of gas 141. Surproduction de Gaz (1) For those wells requiring a DGA, the (1) Dans le cas des puits exigeant une PQAG, le overproduction of gas for a production period must be titulaire de licence doit déterminer la surproduction de determined by the licensee for each gas well or group gaz pour la période de production, pour chaque puits of gas wells and, during the subsequent three months, ou chaque groupe de puits de gaz et, au cours des trois without notification from the Chief Operations Officer, mois subséquents, sans avoir reçu d’avis du délégué the production rate must be adjusted so that all aux opérations, il doit rajuster la production de overproduction is retired by January 31 following the manière que l’excédent soit éliminé au 31 janvier end of the production period. suivant la fin de la période de production. (2) A report of any overproduction of gas for a (2) Le titulaire de licence doit remettre au ministre, un production period must be submitted by the licensee to rapport de la surproduction de gaz pour une période de the Minister in time for it to be received on or before production, dans un délai permettant à celui-ci de le December 18 following the end of the production recevoir le ou avant le 18 décembre suivant la fin de la period for each gas well or group of gas wells in a unit période de production pour chaque puits de gaz ou area with a single DGA. groupe de puits dans un secteur unitaire assujettis à une seule PQAG. (3) If overproduction is not corrected in accordance (3) Si aucun ajustement de la surproduction n’a été with subsection (1), the Chief Operations Officer may apporté en conformité avec le paragraphe (1), le order that the well be shut in for a period specified in délégué aux opérations peut ordonner que le puits soit the direction. fermé pour une période précisée dans la directive. PART 11 (PARTIE 11) PART 11 PARTIE 11 MEASUREMENT AND TESTING (MESURAGE ET ESSAIS) MEASUREMENT AND TESTING MESURAGE ET ESSAIS 142. Water produced at oil wells (Production d’eau dans les puits de gaz) 142. Water produced at oil wells 142. Production d’eau dans les puits de pétrole (1) If the water production for a month from an oil (1) Lorsque la quantité d’eau produite dans un mois well is 0.01 m3/ m3 or more of the total liquid par un puits de pétrole est égale ou supérieure à 0,01 production and no test treater facilities are available, m3/ m3 de la quantité totale de liquides produits et que the water content of the oil may be determined by l’installation ne comporte pas d’épurateur d’essai, la teneur en eau du pétrole peut être déterminée : (a) continuous proportional sampling of the a) soit par échantillonnage proportionnel en produced liquids and accurate analysis of the continu des liquides produits et analyse sample; or approfondie des échantillons; (b) a product analyzer approved by the Chief b) soit au moyen d’un analyseur approuvé par le Operations Officer. délégué aux opérations. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 111 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 142. Article 142. (2) If the water production for a month from an oil (2) Lorsque la quantité d’eau produite dans un mois well is less than 0.01 m3/m3 of the total liquid par un puits de pétrole est inférieure à 0,01 m3/ m3 de production and no test treater facilities are available, la quantité totale de liquides produits et que the water content of the oil may be determined by l’installation ne comporte pas d’épurateur d’essai, la centrifuging two samples taken at adequately spaced teneur en eau du pétrole peut être déterminée par intervals during each test and averaging the results or centrifugation de deux échantillons prélevés à by either of the methods described in subsection (1). intervalles bien espacés et établissement d’une moyenne des résultats, ou par une des méthodes décrites au paragraphe (1). (3) If the total water production at an oil well or (3) Si la quantité totale d’eau produite par un puits ou battery exceeds 50 m3 for a month and the water-oil un groupe de puits de pétrole dans un mois est ratio is in excess of 0.05 m3/m3 of the total liquid supérieure à 50 m3 cubes et que le rapport eau-pétrole production for the month, the water must be separated est supérieur à 0,05 m3/ m3 de liquides produits pour from the oil and accurately gauged or metered at the le mois, l’eau doit être séparée du pétrole et la quantité well or battery or at a central treating facility. doit être mesurée précisément au puits, au groupe de puits ou à une installation centrale de traitement. (4) If the total water production from a multi-well (4) Si la quantité totale d’eau produite par un groupe battery is less than 50 m3 for a month, the water de puits dans un mois est inférieure à 50 m3, celle-ci production for the month may be determined by peut être déterminée pour le mois, par addition de la totalling the calculated water production for the month production d’eau calculée pour chaque puits pour le for each well based on its individual test rate as mois et basée sur le taux d’essai de chacun, déterminé determined in accordance with subsection (2). conformément aux dispositions du paragraphe (2). (5) If the total water production from an oil well not (5) Si la quantité totale d’eau produite par un puits grouped with others delivering oil to the same battery individuel ne faisant pas partie d’un groupe de puits is less than 50 m3 for a month, the water production dans un mois est inférieure à 50 m3, celle-ci peut être for the month may be determined by centrifuging 3- déterminée pour le mois, par centrifugation de trois spot or proportional samples taken at adequately échantillons ponctuels ou proportionnels prélevés à spaced intervals during the month and averaging the intervalles bien espacés au cours du mois, et results. établissement de la moyenne des résultats.. (6) If a proportional sampler is used to determine (6) Si un échantillonneur proportionnel est utilisé pour water production, déterminer la quantité d’eau produite par un puits : (a) a representative sample must be obtained; and a) un échantillon représentatif doit être prélevé; (b) the percentage water content must be b) le pourcentage de teneur en eau doit être determined by an accurate analysis of the fluid déterminé au moyen d’une analyse précise de sample according to the methods provided for l’échantillon prélevé, selon une méthode in the directions of the Chief Operations Officer. prescrite dans les directives du délégué aux opérations. (7) If a product analyzer is used to determine water (7) Si un analyseur de fluide est utilisé pour production, it must be maintained in accurate déterminer la quantité d’eau produite par un puits, il calibration. faut veiller à la précision d’étalonnage de l’appareil. Page 112 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 143. Article 143. 143. Water produced at gas wells (Production d’eau dans les puits de gaz) 143. Water produced at gas wells 143. Production d’eau dans les puits de gaz (1) Water production that is separated at a gas well (1) La quantité d’eau produite par un puits de gaz, or central field facility must be measured by a means qui est séparée au puits même ou à l’installation de approved by the Chief Operations Officer. champ centrale, doit être mesurée par un moyen approuvé par le délégué aux opérations. (2) Water production from each gas well must be (2) La quantité d’eau produite par chaque puits de gaz measured monthly or as otherwise approved by the doit être mesurée tous les mois ou à une autre Chief Operations Officer. fréquence approuvée par le délégué aux opérations. 144. Flow system (Système d’écoulement) 144. Flow system 144. Système d’écoulement (1) The licensee of wells in a pool shall measure and (1) Le titulaire de licences de puits multiples dans un allocate oil, gas and water produced from the wells in seul gisement doit mesurer et répartir la production accordance with an approved flow system and flow regroupée de pétrole, de gaz et d’eau des puits calculation procedure and an approved allocation conformément à un système d’écoulement approuvé, à procedure and shall not make any changes to any of une méthode de calcul du débit approuvée et à une them without the approval of the Chief Operations méthode de répartition approuvée et n’y apporter Officer. aucune modification sans l’approbation du délégué aux opérations. (2) The licensee shall apply to the Chief Operations (2) Le titulaire de licence doit demander l’approbation Officer for approval of du délégué aux opérations pour : (a) a flow system and flow calculation procedure to a) un système d’écoulement et une méthode de measure quantities of oil, gas and water calcul du débit destinés à mesurer les quantités produced from or injected into each well in the de pétrole, de gaz et d’eau produites par pool; and chacun des puits d’un gisement ou injectées dans ceux-ci; (b) an allocation procedure to allocate total b) une méthode de répartition destinée à répartir measured quantities of oil, gas and water entre les différents puits d’un gisement les produced from or injected into the pool during quantités totales mesurées de pétrole, de gaz a reporting period back to individual wells in et d’eau produites par l’ensemble des puits ou the pool when individual well production or injectées dans ceux-ci au cours d’une période injection is not measured separately. de référence, lorsque ces quantités ne sont pas mesurées individuellement. (3) An application for approval of a flow system (3) La demande d’approbation d’un système submitted pursuant to subsection (2) must include d’écoulement présentée en application du paragraphe (2) doit comprendre ou indiquer ce qui suit : (a) metering schematics showing the physical a) un schéma du circuit de mesurage montrant location of all meters used in the flow system l’emplacement de tous les compteurs utilisés and all streams which will be estimated rather aux fins de mesure et de répartition et than directly measured; indiquant les débits qui seront estimés plutôt que directement mesurés; (b) the type, configuration and dimension of any b) le type, la configuration et la dimension des meters and meter runs, meter proving instruments et des sections de mesure, les equipment and procedures, sampling devices détails du matériel et des méthodes used to obtain fluid samples for determination d’étalonnage des compteurs, les détails des of sediment and water content, devices to dispositifs utilisés pour prélever des c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 113 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 144. Article 144. correct measured quantities of oil or gas for échantillons de fluides dans le but de temperature and pressure effects and devices déterminer la teneur en sédiments et en eau de for measuring temperature or pressure to be ces derniers, des dispositifs de compensation used in the flow calculation procedure; de la température et de la pression, ainsi que des dispositifs de mesure de la température ou de la pression qui seront utilisées aux fins de calcul du débit; (c) a description of each type of meter, including c) une description de chaque type de compteur, comprenant les renseignements suivants : (i) the flow rate range and the operating (i) la plage de débits ainsi que la température temperature and pressure of the meter, et la pression de service du compteur, (ii) any measuring, sampling, monitoring or (ii) les détails de tout dispositif de mesure, compensation device to be used in d’échantillonnage, de contrôle ou de conjunction with the meter, compensation associé au compteur, (iii) details of the operating conditions to which (iii) les conditions de service auxquelles seront each meter will be subject, including the assujettis chacun des compteurs, y compris range of flow rates, intermittent or la plage de débits, les caractéristiques du continuous, the temperature and the débit (intermittent ou continu), la maximum pressure drop across the meter, température et la perte de charge à la and traversée du compteur, (iv) details of the meter accuracy, required (iv) le degré de précision du compteur, les calibration equipment and calibration détails du matériel et des méthodes procedures; and d’étalonnage exigés; (d) a description of the well test facilities and the d) les détails concernant les installations servant basis for selecting the number of test aux essais de puits et les critères de separators. détermination du nombre de séparateurs d’essai. (4) An application for the approval of a flow calculation (4) La demande d’approbation d’une méthode de calcul procedure submitted pursuant to subsection (2) must du débit présentée en application du paragraphe (2) include doit comprendre ou indiquer ce qui suit : (a) a description of the equipment, computer a) une description du matériel, du logiciel software and mathematical formulae to be informatique et des formules mathématiques used to convert raw meter output to a utilisés pour transformer les données brutes measured quantity of oil, gas or water; enregistrées par le compteur en une quantité mesurée de pétrole, de gaz ou d’eau; (b) a description of the equipment, computer b) une description du matériel, du logiciel software and mathematical formulae and informatique, des formules mathématiques et correlations of pressure, volume and des corrélations de pression, de volume et de temperature to be used to convert quantities of température utilisés pour transformer des oil, gas or water at measured conditions to an quantités mesurées de pétrole, de gaz ou d’eau equivalent volume at standard atmospheric en volumes équivalents aux conditions pressure and temperature for reporting normales de référence aux fins de préparation purposes, or to estimate quantities of oil, gas de rapports, ou pour estimer des quantités de and water in streams not directly measured; pétrole, de gaz et d’eau qui ne sont pas and directement mesurées; Page 114 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 145. Article 145. (c) the frequency at which calculations will be c) la fréquence d’exécution des calculs et une made and an assessment of accuracy of the évaluation de la précision de l’algorithme de calculation algorithm, including the effects of calcul, y compris les effets des erreurs unintentional rounding errors for each d’arrondissement non intentionnelles dans le metering physical location. cas de chaque point de mesure. (5) An application for approval of an allocation (5) La demande d’approbation d’une méthode de procedure submitted pursuant to subsection (2) must répartition présentée en application du paragraphe (2) include doit comprendre ou indiquer ce qui suit : (a) proposed well testing procedures, duration and a) les détails des méthodes d’essai proposées, y frequencies; compris leur durée et fréquence; (b) a description of the equipment, computer b) une description du matériel, du logiciel software and mathematical formulae used in informatique et des formules mathématiques the allocation procedure; utilisés dans la méthode de répartition; (c) the accuracy capability of the allocation c) le degré de précision de la méthode, y compris procedure, including an analysis of the system une analyse de la précision de mesure du measurement accuracy using the procedures système, effectuée conformément aux provided for in the directions of the Chief indications prescrites dans les directives du Operations Officer; délégué aux opérations; (d) a description of the pool concerned; and d) une description du gisement concerné; (e) details of the procedure for allocating e) les détails concernant la façon d’attribuer une production to a typical well including a sample production donnée à un puits typique, y calculation with an explanation of each compris un exemple de calcul avec explications procedure used and a schematic flow diagram et un schéma de principe montrant les showing the points at which the measurements différents points de mesure. were made. (6) A flow system, flow calculation procedure and (6) Le système d’écoulement, la méthode de calcul du allocation procedure must meet all applicable standards débit et la méthode de répartition doivent être provided for in the directions of the Chief Operations conformes aux normes pertinentes prévues dans les Officer. directives du délégué aux opérations. 145. Recording flow rate and volume of fluids (Débit et volume des fluides) 145. Recording flow rate and volume of fluids 145. Débit et volume des fluides (1) Subject to section 144, the licensee of a well and, (1) Sous réserve de l’article 144, le titulaire d’une when applicable, the licensee of a field facility, shall licence de puits et, s’il y a lieu, le titulaire d’une licence measure by a method satisfactory to the Chief d’installation de champ, doit mesurer et enregistrer Operations Officer and record daily the rate of flow and quotidiennement, le débit et le volume total : the total volume of (a) each fluid that is a) de chaque fluide : (i) produced from, disposed of into or injected (i) produit par un puits, et éliminé ou injecté into the well, dans un puits, (ii) transferred from the well or from a satellite (ii) transféré du puits, d’un groupe de puits ou battery or compressor station associated d’une station de compression satellite y with the well, associé, c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 115 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 146. Article 146. (iii) delivered to a buyer or otherwise disposed of (iii) vendu ou aliéné à un tiers qui en devient to another person who by reason of the ainsi le propriétaire, disposition becomes its owner; (iv) flared or vented; and (iv) brûlé par torchage ou purgé, (v) physically disposed of in a manner not (v) matériellement éliminé par une méthode non mentioned in subparagraphs (i) to (iv); mentionnée aux sous-alinéas (i) à (iv); (b) gas used b) de chaque gaz utilisé : (i) as fuel for production operations, or (i) comme combustible pour les activités de production, (ii) to assist gas-lift operations; and (ii) pour les travaux de récupération assistée au gaz; (c) oil that is used as a hydraulic power fluid for c) du pétrole utilisé comme fluide hydraulique artificial lift. pour le matériel d’ascension artificielle. (2) When a meter is used to measure a fluid in (2) Lorsque le titulaire de licence utilise un compteur accordance with subsection (1), the meter must pour mesurer le débit et le volume d’un fluide conformément au paragraphe (1), ce compteur doit : (a) be installed and used in accordance with the a) être mis en place et utilisé conformément aux instructions provided by the manufacturer; instructions du fabricant; (b) have a flow range appropriate for its intended b) avoir une plage de fonctionnement qui convient use; à l’utilisation prévue; (c) be operated within the operating range of the c) être utilisé dans les limites de sa plage de meter; and fonctionnement; (d) be fitted with continuous temperature d) s’il s’agit d’un compteur de transfert et que les recording or temperature compensating variations de la température peuvent influer devices, if the meter is a custody transfer sur la précision de mesure, être muni d’un meter and temperature fluctuations could affect dispositif d’enregistrement ou de compensation the accuracy of its measurement. en continu de la température. (3) The licensee shall ensure that every valve, meter (3) Le titulaire de licence doit veiller à ce que les and prover tap is installed in such a manner that a vannes, les compteurs et les robinets de vérification reasonably uniform flow rate can be maintained soient mis en place de façon à maintenir un débit through any meter referred to in subsection (2). raisonnablement uniforme dans le compteur visé au paragraphe (2). 146. Transfer meters (Compteurs de transfert) 146. Transfer meters 146. Compteurs de transfert (1) The licensee of a well shall, in respect of any (1) Le titulaire de licence doit présenter au délégué transfer meter used in any production operation, aux opérations, lorsque ce dernier en fait la demande submit to the Chief Operations Officer in accordance et selon ses directives, les spécifications et les with the Chief Operating Officer’s directions such méthodes d’utilisation de chaque compteur de transfert details of the meter’s specifications and operating utilisé durant les activités de production. procedures as are specified in the directions. (2) The Chief Operations Officer may refuse to approve (2) Le délégué aux opérations peut approuver le a transfer meter referred to in subsection (1) as part of compteur mentionné au paragraphe (1) comme the licensee’s flow system unless the Chief Operations élément du système d’écoulement s’il est convaincu Officer is satisfied that the meter and operating que l’appareil et la méthode d’utilisation permettront Page 116 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 146. Article 146. procedures will permit the determination of volumes to de déterminer les volumes avec une précision an accuracy required for transfer purposes. suffisante aux fins de transfert. (3) The licensee shall retain a copy of any meter (3) Le titulaire de licence doit conserver une copiedes calibration report for a period of three years for the rapports d’étalonnage pendant une période de trois ans purpose of verifying the accuracy of the meter and, on pour les fins de vérification de la précision du compteur request, submit the report to the Chief Operations et remetttre ces rapports au délégué aux opérations, à Officer. la demande de ce dernier. (4) An oil transfer meter prover must be calibrated (4) Le compteur étalon de transfert de pétrole doit être étalonné : (a) before it leaves the manufacturer; a) avant de sortir des installations du fabricant; (b) immediately prior to start up of production b) immédiatement avant la mise en production du from a pool; and gisement pétrolifère; (c) when in service c) une fois en service : (i) within one year after calibration, or (i) soit dans l’année suivant son étalonnage, (ii) following any maintenance work on the (ii) soit après avoir subi des travaux d’entretien prover that could affect the swept volume or susceptibles d’avoir modifié son volume when it is evident that a change in prover engendré ou lorsqu’il est évident que son volume has taken place. volume a été modifié. (5) To demonstrate acceptable repeatability, the oil (5) Pour pouvoir démontrer une fidélité acceptable, le transfer meter prover must be calibrated using five compteur étalon doit être étalonné à cinq reprises consecutive trials and the difference between the consécutives et la différence entre le volume le plus highest and lowest volume must not be greater élevé et le volume le plus faible ne doit pas être than 0.02 %. supérieure à 0,02 %. (6) If the oil transfer meter prover fails to meet the (6) Si le compteur étalon ne répond pas aux exigences requirements of subsection (5) and fails to meet those du paragraphe (2) et ne répond pas non plus à ces requirements after three additional trials, the prover exigences après trois étalonnages supplémentaires, il system must be reviewed to determine the potential faut le vérifier afin de déterminer la source potentielle source of error before the calibration sequence is d’erreur avant de le soumettre à une autre séquence reinitiated. d’étalonnage. (7) When the oil transfer meter prover has been (7) Lorsque le volume mesuré au moment de calibrated and the new prover volume deviates more l’étalonnage d’un compteur étalon diffère de 0,04 % than 0.04 % from the previous calibration, the prover par rapport au volume mesuré au moment de system must be reviewed to determine and correct the l’étalonnage précédent, il faut vérifier le système source of error. d’étalonnage du compteur afin de déterminer la source potentielle d’erreur. (8) On the request of the Chief Operations Officer, the (8) Sur demande du délégué aux opérations, le licensee shall submit to the Minister a copy of the titulaire de licence doit remettre une copie du certificat calibration certificate for an oil transfer meter prover. d’étalonnage du compteur étalon au ministre. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 117 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 147. Article 147. 147. Test and group oil production meter calibration (Étalonnage des compteurs de production regroupée et des compteurs de production d’essai) 147. Test and group oil production meter 147. Étalonnage des compteurs de production calibration regroupée et des compteurs de production d’essai (1) When a test oil production meter is used to (1) Lorsqu’un compteur de production d’essai est measure fluids produced from a pool, the licensee of a utilisé pour mesurer les fluides produits à partir d’un well producing from the pool shall gisement, le titulaire de licence d’un puits produisant à partir de ce gisement doit : (a) attach to each meter an indestructible tag or a) apposer une étiquette indestructible sur le label showing the date of the last calibration compteur montrant la date de la dernière proof, serial number of the meter and the vérification de l’étalonnage, le numéro de série meter factor; et l’indice de celui-ci; (b) calibrate the meter within the first three b) étalonner le compteur dans les trois mois de la months of operation by a meter proof mise en production du puits à l’aide d’une consisting of four consecutive runs, each within vérification sous forme de quatre essais a tolerance of plus or minus 1.5 % of the mean consécutifs, avec un écart moyen admissible factor; pour chaque essai de plus ou moins 1,5 %; (c) if possible, use different wells for the four c) si possible, utiliser un puits différent pour consecutive runs referred to in paragraph (b), chacun des essais consécutifs visés à l’alinéa b), allowing adequate purging time for the proving prévoyant une période suffisante de temps system by selecting wells to include those with pour le nettoyage du système d’étalonnage, en the widest variation in gas-oil ratio or other sélectionnant les puits ayant la plus grande producing characteristics; and variation dans leur rapport gaz-pétrole ou dans d’autres caractéristiques de production; (d) subsequent to the initial calibration performed d) à la suite de l’étalonnage initial, en application under paragraph (b), recalibrate the meter de l’alinéa b), réétalonner le compteur each year or immediately following any change annuellement ou immédiatement après toute or repairs to the installation that might affect modification ou réparation de l’installation the meter factor. susceptible d’avoir un effet sur l’indice de celui- ci. (2) When a group oil production meter is used to (2) Lorsqu’un compteur de production regroupée est measure fluids produced from wells completed in the utilisé pour mesurer les fluides produits dans plusieurs same pool, the licensees of the wells shall collectively puits achevés dans un même gisement, les titulaires de ensure that licences pour ces puits doivent ensemble: (a) an indestructible tag or label is attached to the a) veiller à ce qu’une étiquette indestructible soit meter showing the date of the last calibration apposée sur le compteur montrant la date de la proof, the serial number of the meter and the dernière vérification de l’étalonnage, le numéro meter factor; de série et l’indice de celui-ci; (b) the meter is calibrated within the first month of b) étalonner le compteur dans le mois suivant la operation, using a suitable proving device mise en production des puits à l’aide d’un consisting of three consecutive runs, each dispositif de vérification convenable, sous within a tolerance of plus or minus 0.25 % of forme de trois essais consécutifs, avec un écart the mean factor; moyen admissible pour chaque essai de plus ou moins 0,25 %; Page 118 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 148. Article 148. (c) following a meter proof, the average meter c) à la suite d’une vérification de l’étalonnage du factor is applied to meter readings until the compteur, appliquer l’indice moyen de celui-ci next meter proof; à toute lecture de compteur jusquà la prochaine vérification; (d) the meter is replaced with a properly calibrated d) remplacer le compteur par un autre compteur meter when a consistent meter factor is convenablement étalonné lorsqu’un indice unattainable in accordance with paragraph (b); constant ne peut y être réalisé conformément à l’alinéa b); (e) following the initial calibration performed e) à la suite d’un étalonnage initial, en application under paragraph (b), each oil meter used to de l’alinéa b), vérifier au moins une fois par arrive at total production from the battery is mois, chacun des compteurs utilisés pour proved at least once each month and for that mesurer la production totale et à cette fin: purpose (i) one run is sufficient if the new meter factor (i) soit qu’un essai soit suffisant, si le nouvel is within 0.50 % of the previous factor, or indice de compteur est à l’intérieur de 0,50 % du précédent, (ii) three consecutive runs must be used, each (ii) soit que trois essais consécutifs soint within a tolerance of plus or minus 0.25 % of nécessaires, avec un écart moyen admissible the mean factor, if the new meter factor is pour chaque essai de plus ou moins 0,25 %, not within 0.50 % of the previous meter si le nouvel indice n’est pas à l’intérieur factor; and de 0,50 % du précédent; (f) a record of the calibration of the oil meter is f) remettre un rapport d’étalonnage du compteur made available to the Chief Operations Officer de pétrole au délégué aux opérations lorsque on request. celui-ci en fait la demande. 148. Water meter calibration (Étalonnage des compteurs d’eau) 148. Water meter calibration 148. Étalonnage des compteurs d’eau When a water meter is used to measure water Lorsqu’un compteur d’eau est utilisé pour mesurer produced from a well, the licensee of the well shall l’eau produite dans un puits, le titulaire de licence du puits doit : (a) attach to the meter an indestructible tag or a) apposer une étiquette indestructible sur le label showing the date of the last calibration compteur montrant la date de la dernière proof, the serial number of the meter and the vérification de l’étalonnage, le numéro de série meter factor; et l’indice de celui-ci; (b) calibrate the meter within the first three b) étalonner le compteur dans les trois mois de la months of operation; mise en production du puits; (c) recalibrate the meter immediately following c) réétalonner le compteur dès qu’il a subi toute any repairs to the meter or at the end of a 12- réparation ou à la fin d’une période de 12 mois month period since the last calibration or suivant la date du dernier étalonnage ou d’un recalibration; and réétalonnage; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 119 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 11 PARTIE 11 Section 149. Article 149. (d) conduct the calibrations and recalibrations d) procéder à l’étalonnage et au réétalonnage required by this section in the shop or field exigibles par le présent article, en atelier ou against a prover tank, check meter or other dans le champ, à l’aide d’un réservoir approved device, and with a minimum of four d’étalonnage, compteur de contrôle, ou autre consecutive runs each within a tolerance of plus dispositif approuvé, et d’un minimum de quatre or minus 1.5 % of the mean factor. essais consécutifs avec un écart moyen admissible pour chaque essai de plus ou moins 1,5 %. 149. Gas meter calibration (Étalonnage des compteurs de gaz) 149. Gas meter calibration 149. Étalonnage des compteurs de gaz For each gas meter used to measure gas production Pour chaque compteur de gaz utilisé pour mesurer la from a well, the licensee of the well shall production de gaz dans un puits, le titulaire de licence du puits doit : (a) attach to the meter an indestructible tag or a) apposer une étiquette indestructible sur le label showing the date of the last calibration compteur montrant la date de la dernière proof, the serial number of the meter and the vérification de l’étalonnage, le numéro de série meter factor; and et l’indice de celui-ci; (b) calibrate the meter within the first month of b) étalonner le compteur dans le mois suivant la operation and regularly thereafter as required mise en production du puits et régulièrement by the directions of the Chief Operations par la suite conformément aux directives du Officer. délégué aux opérations. 150. Condensate meter calibration (Mesure du condensat) 150. Condensate meter calibration 150. Mesure du condensat (1) When a displacement or turbine meter is used to (1) Le titulaire de licence qui utilise un compteur measure condensate production from a well, the volumétrique ou un compteur à turbine pour mesurer licensee of the well shall la production de condensat dans un puits doit: (a) attach to the meter an indestructible tag or a) apposer une étiquette indestructible sur le label showing the date of the last calibration compteur montrant la date de la dernière proof, the serial number of the meter and the vérification de l’étalonnage, le numéro de série meter factor; et l’indice de celui-ci; (b) calibrate the meter within the first month of b) étalonner le compteur dans le mois suivant la operation; mise en production du puits; (c) recalibrate the meter immediately following c) réétalonner le compteur dès qu’il a subi toute any repairs to the meter or at the end of a six- réparation ou à la fin d’une période de six mois month period since the last calibration or suivant la date du dernier étalonnage ou d’un recalibration; and réétalonnage; (d) conduct the calibrations and recalibrations d) procéder à l’étalonnage et au réétalonnage du required by this section in the field at operating compteur exigibles par le présent article, dans conditions against a suitable volumetric or le champ et sous les conditions d’exploitation, à gravimetric prover, and with a minimum of l’aide d’un appareil de vérification volumétrique four consecutive runs each within a tolerance of ou gravimétrique, et d’un minimum de quatre plus or minus 2.0 % of the mean factor. essais consécutifs avec un écart moyen admissible pour chaque essai de plus ou moins 2,0 %. Page 120 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 151. Article 151. (2) When the licensee uses an orifice flow meter to (2) Le titulaire de licence qui utilise un débitmètre à measure condensate, the licensee shall equip the meter diaphragme pour mesurer le condensat doit munir ce with a recorder. débitmètre d’un dispositif enregistreur. 151. Testing frequency (Fréquence des essais) 151. Testing frequency 151. Fréquence des essais The licensee of a well that is producing oil or gas from Le titulaire de licence d’un puits produisant du pétrole a pool shall conduct a production test of the well ou du gaz à partir d’un gisement doit soumettre le puits à un essai, selon le cas : (a) at least twice per month; or a) au moins deux fois par mois; (b) at intervals approved by the Chief Operations b) à la fréquence approuvée par le délégué aux Officer. opérations. 152. Accuracy of measurement (Précision des mesures) 152. Accuracy of measurement 152. Précision des mesures (1) The licensee of a well shall, at the request of the (1) À la demande du délégué aux opérations, le Chief Operations Officer, test the accuracy of a meter titulaire de licence d’un puits doit vérifier, par un essai, used to measure production of oil and gas from the la précision du compteur qu’il utilise pour mesurer la well and submit the results to the Minister. production de pétrole et de gaz dans le puits, et en remettre les résultats au ministre. (2) On discovering any metering error, the licensee (2) Dès qu’il découvre qu’un compteur marque des shall have the meter corrected immediately and submit erreurs de mesure, le cas échéant, le titulaire de to the Minister corrected oil and gas production data licence doit faire corriger la lecture du compteur, et for each month during which the meter measured présenter au ministre des données de production de incorrectly. gaz et de pétrole corrigées pour chaque mois pendant lequel les lectures du compteur étaient erronées. (3) Corrected oil and gas production data for a month (3) Les données de production de gaz et de pétrole must be submitted pursuant to subsection (2) by corrigées doivent être présentées en application du the 18th day of the month following the month in paragraphe (2) le ou avant le 18e jour du mois suivant which the meter was corrected. celui où les lectures du compteur ont été corrigées. PART 12 (PARTIE 12) PART 12 PARTIE 12 SAFETY AND ENVIRONMENTAL PROTECTION (SÉCURITÉ ET PROTECTION DE L’ENVIRONNEMENT) SAFETY AND ENVIRONMENTAL PROTECTION SÉCURITÉ ET PROTECTION DE L’ENVIRONNEMENT 153. Safety and environmental protection plans (Plans de sécurité et de protection environnementale) 153. Safety and environmental protection 153. Plans de sécurité et de protection plans environnementale (1) This section applies to safety plans and (1) Les dispositions du présent article s’appliquent environmental protection plans that are by reason of aux plans de sécurité et de protection the Chief Operations Officer’s directions required to be environnementale qui doivent être présentés pour submitted for approval as part of an application for a approbation en vertu des directives du délégué aux Well Licence, Well Operation Approval or Field Facility opérations dans le cadre d’une demande de licence de Licence. puits, d’autorisation d’exploitation d’un puits ou de licence d’installation de champ. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 121 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 153. Article 153. (2) A safety plan must provide for all matters related (2) Un plan de sécurité doit prévoir toutes les to the safety and health of the public and the integrity questions de santé et de sécurité publiques ainsi que of the well site or field facility site and shall include l’intégrité d’un chantier de puits ou de l’emplacement information required by the directions of the Chief de l’installation de champ, et doit inclure les Operations Officer. renseignements exigés dans les directives du délégué aux opérations. (3) An environmental protection plan must provide for (3) Un plan de protection environnementale doit the protection of the environment in respect of all prévoir les mesures de protection de l’environnement matters related to the licensee’s oil and gas activities reliées aux activités d’exploitation pétrolières et and shall include information required by the directions gazières auxquelles se livre le titulaire de licence et doit of the Chief Operations Officer.
Part document.segment-11
Oil and Gas Drilling and Production Regulations — segment 11
- document.segment-11 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 11
AI-assisted research summary: Licensees must have contingency plans, keep approved plans on site, maintain safe operations and training, and stop work when safety or environmental limits are threatened.
inclure les renseignements exigés dans les directives du délégué aux opérations. (4) The plans referred to in subsections (2) and (3) (4) Les plans visés aux paragraphes (2) et (3) doivent must be submitted for approval in accordance with the être présentés pour approbation conformément aux directions of the Chief Operations Officer and must directives du délégué aux opérations et doivent traiter address abnormal conditions and emergencies that can des conditions inhabituelles et des situations d’urgence reasonably be anticipated, including raisonnablement prévisibles, y compris : (a) serious injury or loss of life; a) les blessures graves et les décès; (b) loss of well control; b) la perte du contrôle d’un puits; (c) oil or contaminant spill or toxic release; c) les déversements d’hydrocarbures et d’autres polluants ou les rejets de matières toxiques; (d) a major fire or explosion; d) les incendies ou les explosions; (e) arrangements for the drilling of a relief well if e) les mesures à prendre pour le forage d’un puits that becomes necessary; and d’intervention si cela s’avère nécessaire; (f) hazards unique to the site of the operation. f) les dangers tout particuliers au chantier. (5) A safety plan or environmental protection plan (5) Un plan de sécurité ou de protection approved under this section may be amended or environnementale approuvé en vertu du présent article replaced with the approval of the Chief Operations peut être modifié ou remplacé moyennant Officer. l’approbation du délégué aux opérations. (6) The licensee shall ensure that all equipment (6) Le titulaire de licence doit vérifier que tout le required by the approved plans is available for use and matériel requis selon les plans approuvés est disponible in an operable condition. et en bon état de fonctionnement. (7) The licensee shall update the inventory of (7) Le titulaire de licence doit tenir à jour la liste du equipment described in each approved plan and shall matériel spécifié dans chaque plan approuvé et submit the updated inventory to the Chief Operations présenter la liste mise à jour au délégué aux opérations Officer within 45 days after the completion of any dans les 45 jours suivant l’exécution de toute significant modification of or major repairs to any modification ou de toute réparation importante de l’un major component of the equipment. des composants principaux du matériel en question. (8) The plans submitted under this section must (8) Les plans présentés en vertu du présent article provide for coordination with any relevant doivent prévoir des mesures permettant leur governmental emergency response plan. coordination avec tout plan d’urgence municipal, provincial, territorial ou fédéral pertinent. Page 122 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 154. Article 154. (9) On request of the Chief Operations Officer, (9) À la demande du délégué aux opérations, le drawings and other documentation referred to in the titulaire de licence doit lui remettre les dessins et les plans must be submitted by the licensee to the Chief autres documents mentionnés dans les plans proposés. Operations Officer. (10) The licensee shall conduct all operations in (10) Le titulaire de licence doit exécuter tous les accordance with the plans approved under this section. travaux en conformité avec les plans approuvés en vertu du présent article. 154. Contingency plans (Plans d’intervention) 154. Contingency plans 154. Plans d’intervention The licensee of a well or of any field facility associated Le titulaire d’une licence de puits ou d’une installation with the well shall ensure that contingency plans are de champ afférente au puits doit veiller à ce que des formulated and that equipment is available to cope plans d’intervention soient élaborés et que le matériel with any foreseeable emergency situation during any requis soit disponible pour faire face à toute situation drilling operation, well operation or production d’urgence prévisible pouvant se produire durant le operation, including the emergencies referred to in forage, l’exploitation ou les activités de production, y subsection 153(4). compris les urgences visées au paragraphe 153(4). 155. Availability of plans (Accès aux plans approuvés) 155. Availability of plans 155. Accès aux plans approuvés The licensee of a well or of any field facility associated Le titulaire d’une licence de puits ou d’installation de with the well shall ensure that a copy of every champ y afférente doit veiller à ce qu’un exemplaire de approved safety plan, environmental protection plan chaque plan de sécurité, de protection and contingency plan is environnementale ou d’intervention approuvé : (a) kept at the well site or field facility site, as the a) soit conservé sur le chantier du puits ou à case may be, while the drilling operation or l’emplacement de l’installation de champ, selon well operation or production operation is taking le cas, durant le forage, l’exploitation ou les place; and activités de production; (b) available for examination on request by any b) puisse être consulté sur demande par tout person at the site. membre du personnel. 156. General safety of operations (Dispositions générales) 156. General safety of operations 156. Dispositions générales (1) The licensee of a well or of any field facility (1) Le titulaire d’une licence de puits ou d’installation associated with the well shall ensure that de champ y afférente doit veiller à ce que les conditions suivantes soient respectées : (a) every operation is conducted in a manner that a) tous les travaux sont effectués de manière que maintains full control of the well at all times; le puits soit entièrement sous contrôle en tout temps; (b) the administrative and logistical support that is b) le soutien administratif et logistique prévu pour provided for any operation includes tous les travaux comprend : (i) transportation facilities suitable for the area (i) des services de transport adéquats, of the operations, (ii) suitable supplies of drilling consumables, (ii) des réserves suffisantes de produits de food and fuel, forage, de denrées alimentaires et de combustible, (iii) accommodation for personnel, (iii) des installations pour loger le personnel, c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 123 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 157. Article 157. (iv) first aid facilities, (iv) le nécessaire de premiers soins, (v) storage and repair facilities, and (v) des installations de stockage et ateliers de réparation, (vi) adequate communications systems; (vi) des moyens de communication adéquats; (c) during the drilling of the well, at the end of c) à chaque changement d’équipe de travail each drill crew shift, the drill crew at the well durant le forage, l’équipe sortant du chantier site informs the new drill crew of any signale à l’équipe entrant tout problème mechanical deficiencies that have not been mécanique survenu durant le quart de travail et rectified during the shift and of any downhole qui n’a pas été corrigé et toute condition en conditions or other problems that could have a fond de trou ou autre situation susceptible de bearing on the safe conduct of the drilling compromettre la sécurité des travaux de forage operation; and ou des activités de production; (d) differences in language or other obstacles to d) la sécurité des opérations n’est pas effective communication do not jeopardize the compromise par des différences de langue ou safety of operations. autres éventuelles barrières à la communication. (2) The licensee shall ensure that (2) Le titulaire de licence doit veiller à ce que : (a) any operation necessary for safety at a site has a) toute opération nécessaire pour assurer la priority over any other operation at that site; sécurité sur le chantier ait en tout temps priorité sur toute autre activité effectuée sur ce chantier; (b) trained personnel are ready and able to operate b) un personnel qualifié soit disponible et en any item of equipment; and mesure d’assurer le fonctionnement de toute pièce d’équipement sur le chantier; (c) safe working methods are followed in all c) des méthodes de travail sécuritaires soient aspects of any operation. employées pour l’exécution de tous les travaux. 157. Fire precautions (Précautions en cas d’incendie) 157. Fire precautions 157. Précautions en cas d’incendie (1) If an internal combustion engine is located (1) Si un moteur à combustion interne est situé à within 25 metres of any well, separator, crude oil moins de 25 mètres d’un puits, d’un séparateur, d’un storage tank or other unprotected source of ignitable réservoir de stockage de pétrole brut ou d’une autre vapours, source non protégée de vapeurs inflammables, les mesures suivantes doivent être prises : (a) its exhaust pipe must be insulated or a) son tuyau d’échappement doit être isolé ou sufficiently cooled, in a manner acceptable to refroidi suffisamment, par un moyen approuvé the Chief Operations Officer, to prevent ignition par le délégué aux opérations, pour ne pas of flammable material, and the end of the provoquer l’allumage de matières exhaust pipe must be directed away from the inflammables, et son extrémité doit être dirigée wellhead or source of ignitable vapours; and dans le sens opposé à la tête du puits ou autre source de vapeurs inflammables; (b) its exhaust manifold must be shielded to b) son collecteur d’échappement doit être protégé prevent liquids or gases coming into contact de manière à prévenir tout contact avec des with it. liquides ou des gaz. Page 124 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 157. Article 157. (2) If a diesel engine is located within 25 metres of a (2) Si un moteur diesel est situé à moins de 25 mètres well, it must be provided with one of the following: d’un puits, il doit être muni de l’un ou l’autre des dispositifs suivants : (a) an air intake shut-off valve of a type approved a) un robinet d’arrêt de bouche d’entrée d’air de by the Chief Operations Officer and equipped type approuvé par le délégué aux opérations, with a readily accessible remote control; pouvant être télécommandée par un dispositif facilement accessible; (b) a system for injecting an inert gas into the b) un système permettant l’injection de gaz inerte engine’s cylinders, equipped with a readily dans les cylindres du moteur, pouvant être accessible remote control; télécommandé par un dispositif facilement accessible; (c) a suitable duct so that air for the engine is c) un conduit d’amenée d’air de longueur obtained at least 25 metres from the well; and convenable pour prélever l’air à une distance minimale de 25 mètres du puits; (d) any device or devices that may be approved or d) tout autre dispositif approuvé ou exigé par le directed by the Chief Operations Officer. délégué aux opérations. (3) If a shut-off valve and remote control have been (3) Lorsqu’un robinet d’arrêt et un dispositif de installed in accordance with paragraph (2)(a), the télécommande sont mis en place conformément à mechanical operation of the valve and control must be l’alinéa (2)a), leur fonctionnement mécanique doit être tested at least once in each seven-day period during vérifié au moins une fois par période de sept jours de any drilling operation or well operation, and stopping forage ou d’exploitation du puits, et un essai d’arrêt du of the engine by the remote control must be tested moteur par télécommande doit se faire : (a) before the cement plug at the shoe of the a) avant la pénétration du bouchon de ciment surface casing is drilled out; situé au niveau du sabot du tubage de surface; (b) before each formation flow test or series of b) avant que ne débute un essai d’écoulement de tests; and formation ou une série d’essais; (c) if the well has been completed, before any c) s’il s’agit d’un puits achevé, avant que ne servicing operations commence. débutent tous travaux d’entretien. (4) If an injection system and remote control have (4) Lorsqu’un système d’injection et un dispositif de been installed in accordance with paragraph (2)(b), the télécommande sont mis en place conformément à stopping of the engine by the remote control must be l’alinéa (2)b), un essai d’arrêt du moteur par tested at least once in each seven-day period during télécommande doit se faire au moins une fois par any drilling operation or well operation. période de sept jours de forage ou d’exploitation du puits. (5) Except when gasoline or liquid fuel are held in fuel (5) Sauf s’ils sont stockés dans des réservoirs tanks actually connected to operating equipment, they raccordés à des appareils de chantier, l’essence et les must not be stored within 25 metres of a well, and combustibles liquides ne doivent pas être stockés à drainage of gasoline or liquid fuel from such places of moins de 25 mètres d’un puits, et la vidange des storage must be in a direction away from the well site. réservoirs de stockage doit se faire en direction opposée au chantier. (6) Heating or lighting apparatus involving the use of a (6) Aucun appareil de chauffage ou d’éclairage à flame must not be placed within 25 metres of a well. flamme nue ne doit être placé à moins de 25 mètres d’un puits. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 125 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 158. Article 158. (7) If a pressure relief valve, rupture disc or burst (7) Sauf autorisation contraire du délégué aux plate is installed on a separator, treater or other opérations, toute soupape de décharge, disque de pressure vessel at a producing well, the valve, disc or rupture ou plaque d’éclatement mis en place sur un plate, unless otherwise approved by the Chief séparateur, un purificateur ou autre appareil sous Operations Officer, pression dans un chantier doit : (a) must be connected by suitable piping to an a) être relié par une canalisation convenable à un open tank when production is in the liquid réservoir ouvert si le fluide produit est liquide; phase; or (b) must be connected to a flare line that has a b) être relié à une conduite de torche rattachée à flare stack constructed in accordance with une colonne de brûlage érigée en conformité section 128, when production is in the gaseous avec les dispositions de l’article 128 lorsque la phase. production est à la phase gazeuse. 158. Fire control (Extinction d’incendies et contrôle de feu) 158. Fire control 158. Extinction d’incendies et contrôle de feu Unless otherwise approved by the Chief Operations À moins d’approbation contraire du délégué aux Officer, fire must be controlled at a site in the following opérations, les conditions suivantes doivent exister sur manner le chantier : (a) fires must not be located less than 50 metres a) aucun feu ne doit être allumé à moins de 50 from any well, oil storage tank or other mètres d’un puits, d’un réservoir de stockage unprotected source of ignitable vapours; de pétrole ou de toute autre source non protégée de vapeurs inflammables; (b) all fires for any purpose must be safeguarded b) tout feu allumé à quelque fin que ce soit doit by sufficient mechanical or other means so that être protégé par un dispositif mécanique ou no hazard to surrounding property is created; autre de manière qu’il ne constitue aucun danger pour les environs; (c) all vent lines from oil storage tanks which are c) les canalisations de dégazage des réservoirs de vented to flare pits or flare stacks must be stockage de pétrole menant à la fosse de provided with flame arresters or other brûlage ou à la torche doivent être munies d’un equivalent safety devices; coupe-flamme ou autre dispositif de sécurité y assimilé; (d) a flame-type stove or heater, crude oil treater, d) aucun appareil de chauffage, purificateur de glycol-type dehydrator installation or other pétrole brut, appareil de déshydratation au flame-type equipment must not be placed glycol ou autre appareil à flamme nue ne doit within 25 metres of any well, separator, crude être placé à moins de 25 mètres d’un puits, oil storage tank or other unprotected source of d’un séparateur, d’un réservoir de stockage de ignitable vapours, except when the flame-type pétrole brut ou autre source non protégée de equipment is equipped with flame arresters vapeurs inflammables, sauf si l’appareil en adequate for the purpose for which they are question est muni d’un coupe-flamme used; conforme à l’usage qui en est fait; (e) boilers and steam generating equipment must e) aucune chaudière ni aucun générateur de be located at a point not less than 25 metres vapeur ne doit être situé à moins de 25 mètres from any well, separator, crude oil storage tank d’un puits, d’un séparateur, d’un réservoir de or other unprotected source of ignitable stockage de pétrole brut ou de toute autre vapours; source non protégée de vapeurs inflammables; Page 126 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 159. Article 159. (f) a crude oil treater must not be placed or f) aucun purificateur de pétrole brut ne doit être remain within 25 metres, shell to shell, of any placé ou se trouver à moins de 25 mètres, type of boiler or direct-fired heater or be d’unecalandre à l’autre, d’une chaudière ou placed within 5 metres, shell to shell, of any d’un appareil de chauffage à chauffe directe, ni other direct fired crude oil treater or indirect- à moins de cinq mètres, d’une calandre à fired heater; l’autre, d’un autre purificateur de pétrole brut à chauffe directe ou appareil de chauffage à chauffe indirecte; (g) a crude oil storage tank must not be placed g) aucun réservoir de stockage de pétrole brut ne within 50 metres of any well; doit être placé à moins de 50 mètres d’un puits; (h) all well or field facility piping must be arranged h) toutes les canalisations des puits et des and provided with control valves to permit the installations de champ doivent être disposées et ready shut-off of oil or gas in the event of fire munies de vannes de contrôle de façon à at any well or field facility site; permettre la coupure du pétrole ou du gaz en cas d’incendie sur un chantier ou à l’emplacement d’une installation de champ; (i) a separator must not be enclosed within the i) aucun séparateur ne doit être placé dans le fire wall, dyke or ditch surrounding a storage périmètre d’un mur, d’une digue ou d’une tank installation; tranchée pare-feu entourant un réservoir de stockage; (j) all vessels and equipment from which ignitable j) tout réservoir ou appareil susceptible de vapours may issue must be safely vented to the renfermer des vapeurs inflammables doit être atmosphere; relié à l’atmosphère par un dispositif sûr; (k) every engine or electric switch within 25 k) tout moteur ou dispositif de commande metres of any well, separator, oil storage tank électrique situé à moins de 25 mètres d’un or other unprotected source of ignitable puits, d’un séparateur, d’un réservoir de vapours must be constructed or enclosed so stockage de pétrole ou de toute autre source that it is sparkproof; non protégée de vapeurs inflammables, doit être construit ou protégé de manière à être à l’abri des étincelles; (l) explosives must be stored only in properly l) tous les explosifs doivent être rangés dans une constructed magazines, situated not less poudrière de construction convenable, située à than 150 metres from any place where any au moins 150 mètres de tout endroit où se drilling operation or well operation is being déroulent des travaux de forage ou undertaken. l’exploitation d’un puits. 159. Training (Formation du personnel) 159. Training 159. Formation du personnel (1) If the licensee of a well proposes to conduct a (1) Il est interdit au titulaire de licence drilling operation requiring special skills not held by the d’entreprendre des travaux de forage exigeant des employees to be employed for that operation, the compétences que ne possède pas le personnel qu’il licensee must not begin the operation until compte employer pour les exécuter, avant : (a) the licensee submits to the Chief Operations a) d’avoir remis une description de la formation Officer a description of the training the licensee qu’il propose donner à ce personnel au délégué proposes to give to those employees; aux opérations; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 127 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 160. Article 160. (b) the Chief Operations Officer approves the b) que le délégué aux opérations n’ait approuvé le training proposal referred to in paragraph (a); programme de formation proposé visé à and l’alinéa a); (c) the licensee ensures that the employees c) d’assurer que la formation approuvée ait été successfully complete the approved training. suivie et complétée avec succès par le personnel.. (2) The Chief Operations Officer may refuse to approve (2) Le délégué aux opérations peut approuver un a training proposal submitted pursuant to programme de formation proposé en application de paragraph (1)(a) unless the Chief Operations Officer is l’alinéa (1)a) s’il est d’avis que ce programme est satisfied that the proposed training is sufficient to adéquat pour préparer le personnel à exécuter les enable the operation to be conducted in a safe manner. travaux de façon sécuritaire. (3) The licensee of a well shall ensure that during a (3) Le titulaire d’une licence de puits doit veiller à ce drilling operation que les conditions suivantes soient respectées au cours des travaux de forage: (a) the drilling contractor’s rig manager and the a) le chef de chantier de l’entrepreneur de forage licensee’s drilling representative are holders of et le représentant en forage du titulaire de a valid second line certificate from a well licence détiennent un certificat valide de control school whose standards are acceptable deuxième niveau en contrôle de puits, d’une to the Chief Operations Officer; and école dont le délégué aux opérations juge les normes satisfaisantes; (b) each driller, assistant driller, derrickman and b) tous les foreurs, seconds, accrocheurs et motorman is the holder of a valid first line motoristes détiennent un certificat valide de certificate from a well control school whose premier niveau en contrôle de puits, d’une standards are acceptable to the Chief école dont le délégué aux opérations juge les Conservation Officer. normes satisfaisantes. (4) In the case of a sour well, the licensee’s drilling (4) S’il s’agit d’un puits corrosif, le représentant en representative, the contractor’s rig manager and every forage du titulaire de licence, le chef de chantier de driller must be trained in hydrogen sulphide rescue and l’entrepreneur et tous les foreurs doivent avoir reçu every drill crew member must be trained in hydrogen une formation sur les mesures de sauvetage en sulphide safety. présence d’hydrogène sulfuré et tous les membres de l’équipe de forage doivent avoir reçu une formation sur les mesures de sécurité à prendre en présence d’hydrogène sulfuré. 160. Capability of employees (Compétence des employés) 160. Capability of employees 160. Compétence des employés (1) The licensee of a well or field facility shall ensure (1) Le titulaire d’une licence de puits ou d’installation that every person employed at the site de champ doit veiller à ce que tout employé travaillant sur le chantier : (a) receives instruction and training in respect of a) reçoive la formation et les directives requises all operational and safety procedures that the concernant toutes les méthodes de travail et les person may be required to carry out during the mesures de sécurité qu’il devra appliquer dans course of the person’s duties during that l’exercice de ses fonctions; employment; (b) is capable of doing the duties assigned to that b) soit en mesure d’exécuter les fonctions qui lui person; and sont attribuées; Page 128 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 161. Article 161. (c) is 16 years of age or more or is 18 years of age c) soit âgé d’au moins seize ans, et d’au moins or more if that person’s duties involve work on dix-huit ans s’il doit travailler sur le plancher the drill floor. de forage. (2) The licensee shall ensure that all personnel (2) Le titulaire de licence doit veiller à ce que tous les employed on a site membres du personnel employé sur un chantier : (a) are familiar with personal safety and a) connaissent bien les consignes de sécurité evacuation procedures in respect of the site personnelle et les procédures d’évacuation and with their responsibilities under the applicables au chantier, ainsi que leurs contingency plan referred to in section 154; responsabilités selon le plan d’intervention visé and à l’article 154; (b) participate in a field practice exercise of oil spill b) aient participé à un exercice d’intervention en countermeasures at least once in each year cas de déversement de pétrole au moins une that the licensee is engaged in a production fois par année au cours de laquelle le titulaire operation, if oil is or could be produced at or de licence se livre à des activités de production, delivered to the site. s’il y a ou il pourrait y avoir production ou livraison de pétrole sur le chantier. (3) The licensee shall ensure that every representative (3) Le titulaire de licence doit veiller à ce que tous of the licensee, and the supervisory personnel sesreprésentants ainsi que les superviseurs employés employed at the well or field facility site, have, before sur le chantier du puits ou sur l’emplacement de assuming their duties, a reasonable amount of l’installation de champ aient acquis, avant d’assumer experience and any training necessary to conduct their leurs fonctions, la formation nécessaire et une duties in a safe manner at the site. expérience suffisante pour remplir leurs fonctions de façon sécuritaire. (4) The licensee shall keep on the site a summary of (4) Le titulaire de licence doit garder un résumé des the qualifications of any person employed at the site compétences de tout employé sur le chantier durant le during a drilling operation or well operation. forage ou l’exploitation du puits. 161. Defective or experimental equipment (Matériel de forage défectueux ou expérimental) 161. Defective or experimental equipment 161. Matériel de forage défectueux ou expérimental (1) The licensee of a well or field facility shall, in the (1) Le titulaire d’une licence de puits ou d’une interests of safety, installation de champ doit prendre les mesures suivantes, pour des motifs de sécurité : (a) as soon as possible repair or replace any a) réparer ou remplacer immédiatement tout defective equipment used at a site that matériel défectueux utilisé sur le chantier qui represents a safety hazard in respect of the site est susceptible de compromettre la sécurité du or the personnel at the site; personnel ou des installations; (b) as soon as possible alter any operational b) modifier immédiatement toute méthode de procedure used at a site that the licensee has travail qui, à son avis, n’est pas sécuritaire, reason to believe is unsafe, inadequate or convenable ou efficace, et en aviser le deficient and inform all personnel affected of personnel concerné; the alteration; (c) when necessary, insert a revised procedure in c) au besoin, insérer la description de la méthode the operations manuals in respect of an de travail révisée dans le manuel d’exploitation; operation that has been revised; and c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 129 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 162. Article 162. (d) if applicable, institute programs to monitor, in d) s’il y a lieu, mettre en œuvre un programme de accordance with good engineering practices, contrôle de la corrosion et de l’érosion des the extent of the corrosion and erosion of the tubulaires, têtes de puits et autres ouvrages du components of a site and of well tubulars and chantier, conformément aux pratiques wellheads at a well site. reconnues dans le domaine. (2) The licensee, on being requested to do so by the (2) Sur demande du délégué aux opérations, le Chief Operations Officer, shall submit a report of the titulaire de licence doit lui présenter un rapport des results of any action taken by the licensee pursuant to résultats de toute mesure qu’il a prise en application subsection (1). du paragraphe (1). (3) When, pursuant to subsection (1), the licensee is (3) Lorsque le titulaire de licence est tenu, en vertu du required to replace equipment or alter a procedure or paragraphe (1), de remplacer du matériel, de modifier to initiate a new operational procedure, the licensee une méthode de travail ou d’adopter une nouvelle shall obtain the approval of the Chief Operations Officer méthode ou procédure, il doit au préalable recevoir for the replacement equipment, altered procedure or l’approbation du délégué aux opérations pour le new operational procedure before undertaking the nouveau matériel, la méthode modifiée ou la nouvelle replacement, alteration or new procedure. méthode ou procédure.. 162. Unproven drilling equipment (Matériel de forage non éprouvé) 162. Unproven drilling equipment 162. Matériel de forage non éprouvé The Chief Operations Officer may, in the conditions of a Le délégué aux opérations peut, lorsqu’il examine une Well Licence, approve the use of drilling equipment that demande de licence de puits, approuver l’emploi de has not been proven under field conditions, but any matériel de forage qui n’a pas été éprouvé en service, approval granted ceases to be valid if the actual mais l’approbation donnée est invalidée si ce matériel performance of the equipment does not meet or exceed ne satisfait pas aux exigences de fonctionnement the rated design performance specified for that spécifiées dans la demande de licence. equipment in the application for the Well Licence. 163. Construction disturbances (Perturbations dues aux travaux de construction) 163. Construction disturbances 163. Perturbations dues aux travaux de construction No person shall construct or install any equipment that Il est interdit de construire un ouvrage formant partie forms part of a field facility unless the equipment is intégrante d’une installation de champ sauf si cet designed and is constructed or installed in such a ouvrage a été conçu et érigé conformément aux manner as to minimize, to the extent reasonably meilleures pratiques et techniques et de façon à limiter practicable and always in accordance with the best autant que possible : available practices and technologies, (a) any disturbance to watercourses, ground a) la perturbation des cours d’eau, de la surface surface, wildlife or vegetation, or any other du sol, de la faune, de la flore et de tout autre part of the environment; and élément du milieu naturel; (b) any change to the thermal regime of the b) la modification du régime thermique du sol ground in permafrost areas. dans les régions de pergélisol. Page 130 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 164. Article 164. 164. Handling of oilfield waste (Manutention des déchets du champ de pétrole) 164. Handling of oilfield waste 164. Manutention des déchets du champ de pétrole (1) The licensee of a well or field facility shall (1) Le titulaire d’une licence de puits ou d’installation ensure that de champ doit veiller à ce que les conditions suivantes soient respectées : (a) combustible solid waste is not burned at the a) les déchet solides combustibles ne sont brulés site unless precautions are taken to ensure that sur le chantier que si des mesures préventives the fire and residues from the fire do not sont prises afin d’assurer que le feu et ses endanger the public, the environment or the résidus ne posent aucun danger pour le public, safety of the operation; and l’environnement ou la sécurité des travaux; (b) all solid waste that might contribute to b) tous les déchets solides produits et stockés sur pollution and all solid waste produced and le chantier sont traités, manutentionnés et stored at the site is treated, handled and éliminés conformément aux dispositions du disposed of in accordance with the approved plan de protection de l’environnement visé à environmental protection plan referred to in l’article 153. section 153. (2) The licensee of a well shall ensure that all drilling (2) Le titulaire d’une licence de puits doit veiller à ce fluid and drill cuttings generated at the well site are que tous les fluides de forage et les déblais de forage handled and disposed of in a manner that produits sur le chantier du puits soient manutentionnés et éliminés d’une façon : (a) does not create a hazard to safety, health or a) non préjudiciable à la sécurité, la santé et the environment; and l’environnement; (b) is provided for in the approved environmental b) prévue dans le plan de protection de protection plan referred to in section 153. l’environnement visé à l’article 153. (3) The licensee of a well or field facility shall ensure (3) Le titulaire d’une licence de puits ou d’installation that if an oil spill occurs, oil spill countermeasures of a de champ doit veiller à ce que, en cas de déversement chemical nature are not used unless, in the opinion of de pétrole, aucun moyen d’intervention chimique ne the Chief Operations Officer, there is a severe threat to soit mis en œuvre à moins que le délégué aux the safety of persons, property or the environment. opérations ne soit d’avis que le déversement constitue une menace grave pour la sécurité humaine, les biens matériels ou l’environnement. (4) The licensee of a well shall ensure that any spent (4) Le titulaire d’une licence de puits doit veiller à ce acid or excess acid is disposed of in a manner provided que les acides excédentaires ou usés soient éliminés de for in the approved environmental protection plan la façon prévue dans le plan de protection de referred to in section 153. l’environnement approuvé visé à l’article 153. 165. Produced water (Eaux de procédés) 165. Produced water 165. Eaux de procédés (1) The licensee of a well or field facility must not (1) Il est interdit au titulaire d’une licence de puits ou dispose of produced water unless the water is, in d’installation de champ de rejeter des eaux de quality, equal to or better than water that meets any procédés, sauf si ces eaux sont qualitativement en deçà contamination limits specified in the conditions of the des limites de contamination stipulées dans les Field Facility Licence or Scheme Approval. conditions de la licence d’installation de champ ou de l’approbation deplan. (2) The licensee shall institute appropriate sampling (2) Le titulaire de licence doit mettre en œuvre des and analysis procedures to determine whether the méthodes convenables d’échantillonnage et d’analyse c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 131 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 166. Article 166. quality of produced water meets the quality standard afin de garantir que la qualité des eaux de procédés est specified in the conditions of the Field Facility Licence conforme aux normes stipulées dans les conditions de or Scheme Approval that authorizes the operation in la licence d’installation de champ ou de l’approbation which the water is gathered, stored or disposed of. de plan applicable à l’exploitation en question. (3) The licensee must not dispose of produced water (3) Il est interdit au titulaire de licence d’éliminer les onto the land surface or into bodies of water or eaux de procédés en les déversant à la surface de la watercourses or into unlined surface pits unless the terre, dans des masses ou cours d’eau ou dans des water is disposed of fosses non revêtues, sauf : (a) into the pits at a site at which the nature of the a) si la nature même du sol où se situent les soil is such that the contamination of ground fosses prévient la contamination des eaux water is prevented; and souterraines; (b) in a quantity and for a period not exceeding b) en quantité et pour une durée ne dépassant pas those specified in the conditions of the Field celles stipulées dans les conditions de la licence Facility Licence or Scheme Approval that d’installation de champ ou de l’approbation de authorizes the disposal of the produced water. plan applicable à l’élimination en question. (4) Earthen pits may be used to contain produced salt (4) En cas d’urgence, l’eau de procédés salée peut être water on an emergency basis in areas approved by the déversée dans des fosses situées dans des endroits Chief Operations Officer, if the earthen pits are limited dont le délégué aux opérations approuve, si le nombre to one for each well or field facility, and each pit is no de ces fosses est limité à une par puits ou installation larger than 600 square metres in area and is de champ, qu’elles ont chacune une superficie constructed and maintained in a condition acceptable maximale de 600 m2 et sont creusées et entretenues to the Chief Operations Officer. dans une condition acceptable au délégué aux opérations. (5) The contents of each earthen pit must be disposed (5) Le contenu des fosses doit être éliminé dans les 48 of within 48 hours after an emergency requiring the heures suivant la situation d’urgence ayant nécessité use of the pit has occurred, unless otherwise approved l’utilisation de telles fosses, sauf autorisation contraire by the Chief Operations Officer. du délégué aux opérations. 166. Cessation of operations (Cessation des travaux) 166. Cessation of operations 166. Cessation des travaux (1) The licensee of a well or field facility shall ensure (1) Le titulaire d’une licence de puits ou d’installation that any operation ceases as soon as possible if the de champ doit veiller à ce que les travaux cessent dès continuation of that operation que la poursuite de ceux-ci : (a) endangers or may endanger the safety of the a) met la sécurité du public en danger, ou porte public, or endangers or may endanger the atteinte à la sécurité du puits, de l’installation security of a well or field facility or the safety of de champ ou du matériel, ou risque de le faire; equipment; or (b) causes the discharge of any substance into the b) occasionne le déversement dans environment exceeding the limits permitted by l’environnement, de toute substance en the Spills Regulations under the Environment quantités excédant les limites prescrites par le Act or any limit specified in a requirement of a Règlement sur les déversements établi en vertu Well Licence, Well Operation Approval, Field de la Loi sur l’environnement ou toute limite Facility Licence or Scheme Approval. prescrite dans les exigences de la licence de puits ou d’installation de champ, dans l’autorisation d’exploitation du puits ou dans l’approbation de plan. Page 132 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 167. Article 167. (2) The licensee of a well shall ensure that any drilling (2) Le titulaire d’une licence de puits doit veiller à ce operation ceases if any of the following situations occur que les travaux de forage cessent dès que survient une des situations suivantes : (a) an inability to maintain well control; a) la perte de contrôle du puits; (b) a failure of any major component of the b) une panne de tout composant majeur du blowout prevention system, casing or drilling système d’obturateurs anti-éruption, du tubage fluid system; ou du système de fluide de forage; (c) an inability to maintain the properties, volume c) la perte des propriétés, du volume ou de la or circulation rate of the drilling fluid; cadence de circulation du fluide de forage; (d) an inability to maintain on the well site the d) l’incapacité de maintenir sur le chantier du amounts of drilling consumables required by puits, les montants de consommables de forage paragraph 31(4)(c); requis de par l’alinéa 31(4)c); (e) an uncontrolled fire; e) un incendie non-maîtrisé; (f) a loss of a significant portion of the primary f) la perte d’une partie importante de la source power; d’alimentation principale; (g) an inability to safely handle the drill pipe, g) l’incapacité de manipuler sans danger la tige de casing or heavy equipment necessary for the forage, le tubage ou le matériel lourd operation in progress. nécessaire pour les travaux en cours. (3) When an operation has ceased in accordance with (3) Lorsque les travaux ont cessé en application du subsection (1) or drilling has ceased in accordance with paragraphe (1), ou que les travaux de forage ont cessé subsection (2), that operation or drilling shall not be en application du paragraphe (2), ces travaux ou ce resumed until the situation giving rise to the cessation forage ne reprennent pas avant que soit éliminée la no longer exists. situation qui a entraîné leur cessation. 167. Ceasing operation after serious incident (Cessation des travaux par suite d’incident grave) 167. Ceasing operation after serious incident 167. Cessation des travaux par suite d’incident grave (1) If a serious injury or fatal accident or serious (1) Si un accident avec blessure grave, perte de vie damage to equipment occurs at a site, the licensee of ou endommagement grave du matériel se produit sur the well or field facility shall immediately cease every le chantier, le titulaire de licence du puits ou de operation that contributed to the injury, fatality or l’installation de champ doit immédiatement cesser damage and shall not resume the operation without the toute activité en cause et ne peut la reprendre sans approval of the Chief Operations Officer. l’autorisation du délégué aux opérations. (2) The Chief Operations Officer may refuse to approve (2) Le délégué aux opérations autorise la reprise de the resumption of the operation that has been stopped l’activité interrompue en application du paragraphe (1) pursuant to subsection (1) unless the Chief Operations lorsqu’il est d’avis que l’activité peut reprendre en Officer is satisfied that the operation can safely be toute sécurité. resumed. (3) If there is a loss of control, or the danger of a loss (3) En cas de perte de contrôle ou de risque de perte of control, of a well that is part of a cluster of wells in de contrôle d’un puits faisant partie d’un groupe sur le the same well site, the licensee of the well shall shut in même chantier, le titulaire de licence du puits doit all other wells at the site until the well that is out of fermer tous les autres puits du même groupe sur le control or in danger of becoming out of control is chantier et les maintenir fermés jusqu’à ce que la secured. situation de contrôle soit rétablie. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 133 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 168. Article 168. 168. Simultaneous operations (Travaux simultanés) 168. Simultaneous operations 168. Travaux simultanés The licensee of a well shall ensure that procedures are Le titulaire d’une licence de puits doit prévoir des established to ensure the safety of persons and the mesures visant à assurer la sécurité des personnes et protection of the environment, when the licensee la protection de l’environnement lorsqu’il entend mener intends to simultaneously conduct production simultanément avec les activités de production, l’une operations with ou l’autre des activités suivantes sur le même chantier : (a) the drilling of a well on the same site; a) le forage d’un puits; (b) a well operation on the same site; or b) l’exploitation d’un puits; (c) construction or a related activity on the c) des travaux de construction ou des travaux same site. connexes. 169. Bodies of water (Étendues d’eau) 169. Bodies of water 169. Étendues d’eau When a proposed well is to be located within 100 Lorsque le forage d’un puits est prévu à moins de cent metres of the normal high water mark of a body of mètres de la laisse de crue normale d’une étendue ou water or watercourse, the licensee shall submit d’un cours d’eau, le titulaire de licence doit fournir au evidence to the satisfaction of the Chief Operations délégué aux opérations une preuve satisfaisante que Officer that pollution of the water body or watercourse l’étendue ou le cours d’eau n’en sera pas pollué, et doit will be prevented and shall include with that evidence inclure, avec cette preuve, les renseignements information respecting suivants : (a) the elevation of the land and water surfaces a) l’altitude du sol et des plans d’eau autour du adjoining the site; chantier; (b) a description of any special problems at b) un exposé de tout problème particulier au the site; chantier; (c) details of the construction and maintenance of c) les détails de construction et d’entretien des dikes, reservoirs and other installations digues de sécurité, réservoirs et autres intended to be constructed; and installations prévues; (d) particulars in respect of the method to be used d) les méthodes envisagées d’élimination des to dispose of mud, oil, water or other fluids boues, du pétrole, de l’eau et autres fluides associated with the proposed drilling operation. produits lors des travaux de forage proposés. 170. H2S control (Lutte contre l’hydrogène sulfuré (H2S)) 170. H2S control 170. Lutte contre l’hydrogène sulfuré (H2S) (1) If operations are being carried out at a well site (1) Si la teneur en hydrogène sulfuré de l’effluent or field facility site and the hydrogen sulphide content gazeux du chantier d’un puits ou d’une installation de of the gas exceeds or is expected to exceed 10 moles champ est supérieure à dix moles par kilomole, ou si la per kilomole, or if the Emergency Planning Zone for a totalité ou une partie d’un bâtiment occupé ou d’un well site or field facility site includes in whole or in part endroit public se trouve dans l’aire d’intervention en an occupied building or public place, the licensee of the cas d’urgence pour le chantier, le titulaire de licence du well or field facility shall, unless otherwise exempted by puits ou de l’installation de champ doit, sauf indication the Chief Operations Officer, contraire du délégué aux opérations, se conformer aux exigences suivantes : (a) post suitable signs on or near the site warning a) placer des panneaux d’avertissement sur le of the presence of poisonous gas; chantier ou à proximité de celui-ci pour prévenir de la présence de gaz toxique;
Part document.segment-12
Oil and Gas Drilling and Production Regulations — segment 12
- document.segment-12 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 12
AI-assisted research summary: Licensees of wells and field facilities must follow detailed safety, storage, disposal, and reporting rules, with some extra duties triggered by thresholds or Chief Operations Officer requests.
Page 134 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 170. Article 170. (b) supply and maintain respiratory protection b) fournir et maintenir en bon état du matériel de equipment to all authorized personnel at the protection respiratoire pour toutes les site; personnes présentes sur le chantier; (c) equip and operate the site so that the c) équiper et exploiter le chantier de manière que maximum operating flow line gauge pressure la pression manométrique dans les cannot exceed 1,400 kPa, unless a valve is canalisations d’écoulement en service ne installed at the site which closes automatically dépasse pas 1 400 kPa, à moins que le chantier in the event of an uncontrolled flow of oil or ne soit équipé d’une vanne à fermeture gas; automatique en cas d’écoulement non contrôlé de pétrole ou de gaz; (d) if the site is located within 800 metres of an d) si le chantier se trouve à moins de 800 m d’un occupied building or public place, a building to bâtiment occupé ou d’un endroit public, d’un which members of the public have access, or a bâtiment accessible au public, d’une aire de recognized campsite or similar area, construct campement reconnue ou d’une autre and maintain an adequate fence and locking installation y assimilée, construire et entretenir gate to prevent unauthorized access; and une clôture adéquate avec porte verrouillable pour interdire l’accès non autorisé au chantier; (e) include in an approved safety plan an outline of e) inclure dans un plan général approuvé emergency procedures to ensure public safety d’intervention, un sommaire de procédures which will be followed by the licensee in the d’urgence visant à assurer la sécurité publique, event of an uncontrolled emission of oil que le titulaire de licence prévoit suivre en cas or gas, if d’écoulement non contrôlé de pétrole ou de gaz : (i) the site is located within 800 metres of an (i) si le chantier est situé à moins de 800 m occupied building or public place, or d’un bâtiment habité ou endroit public, (ii) the licensee is requested to do so by the (ii) si le délégué aux opérations le demande. Chief Operations Officer. (2) If operations are being carried out at a site and the (2) Si la teneur en hydrogène sulfuré de l’effluent hydrogen sulphide content of the gas exceeds or is gazeux d’un chantier est supérieure à 50 moles par expected to exceed 50 moles per kilomole, or if the kilomole, ou si la totalité ou une partie d’un bâtiment Emergency Planning Zone for a site includes in whole habité ou d’un endroit public se trouve dans l’aire or in part an occupied dwelling or public place, then, d’intervention en cas d’urgence pour le chantier, le unless otherwise exempted by the Chief Operations titulaire de licence de puits ou d’installation de champ Officer, the licensee of the well or field facility shall, in doit, sauf indication contraire du délégué aux addition to complying with the requirements of opérations, se conformer aux exigences suivantes, en subsection (1), plus de celles du paragraphe (1) : (a) for a well not produced by artificial lift, a) pour les puits éruptifs : (i) equip the well with two master valves, (i) munir le puits de deux vannes maîtresses, (ii) install a production packer set as closely (ii) poser une garniture d’étanchéité de above the producing formation as is production au-dessus de la formation practicable, with the annular space between productive et le plus près possible de celle-ci, the tubing and production casing filled with et remplir l’espace annulaire entre le tubage a suitable corrosion inhibiting liquid, et la colonne de production d’un liquide anticorrosion convenable, c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 135 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 170. Article 170. (iii) install wellhead equipment for which the (iii) mettre en place une tête de puits conçue working pressure rating is not less than the pour une pression de marche nominale égale bottom-hole pressure of the producing ou supérieure à la pression de fond, soit d’au formation, but with a minimum rating of moins 14 000 kPa, 14,000 kPa, (iv) if a hot oil circulating string is used inside (iv) si la circulation d’huile chaude est prévue à the production casing of the well, install a l’intérieur de la colonne de production du check valve in the injection line and an puits, poser un clapet de retenue dans la automatic shut-off valve on the return line, canalisation d’injection et un robinet d’arrêt automatique dans la canalisation de retour, (v) if stimulation treatments employ maximum (v) si le traitement de stimulation choisi met en pressures in excess of 75 % of minimum œuvre une pression supérieure à 75 % de la internal yield pressure of the production résistance minimale de la colonne de casing, carry out the treatments through the production, injecter le fluide de traitement tubing and below a packer seated as near to par la colonne de production, au-dessous the production formation as is practicable, d’une garniture d’étanchéité située le plus and près possible de la formation productive, (vi) if the well is equipped with a production (vi) si le puits est muni d’une garniture packer as required by subparagraph (ii), d’étanchéité de production conformément au conduct annual segregation tests by a sous-alinéa (ii), effectuer une fois par an et method approved by the Chief Operations selon une méthode approuvée par le délégué Officer to confirm that the corrosion aux opérations, un essai d’isolement afin de inhibiting liquid in the annular space vérifier que le liquide anticorrosion placé between the tubing and production casing is dans l’espace annulaire entre le tubage et la isolated from the production fluid in the colonne de production ne contamine pas les tubing, and notify the Chief Operations fluides produits, et aviser le délégué aux Officer at least three days in advance of any opérations de la tenue de cet essai au moins segregation test at the well; trois jours avant ; (b) for a well produced by artificial lift, b) pour les puits pompés : (i) install on the stuffing box an automatic (i) poser sur le presse-étoupe un dispositif shutdown device that will shut down the d’arrêt automatique afin d’arrêter l’appareil pumping equipment in the event of a de pompage en cas de défaillance du presse- stuffing box failure and effectively seal off étoupe ou obturer le puits en cas de panne the well in the event of a polish rod failure, de la tige polie, and (ii) install an automatic vibration shutdown (ii) poser un dispositif d’arrêt automatique en system that will safely shut down the cas de vibrations excessives del’appareil de pumping equipment; pompage; (c) install at the well or field facility a surface valve c) équiper tous les puits et installations de champ which closes automatically to shut off an d’une vanne de surface à fermeture uncontrolled flow of gas or oil from the well or automatique en cas d’un écoulement non field facility in the event of a failure of the contrôlé de pétrole ou de gaz advenant une wellhead, field facility or flowline; défaillance de la tête de puits, de l’installation ou de la conduite d’écoulement; Page 136 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 170. Article 170. (d) for a flowing well that is located within 800 d) s’il s’agit d’un puits éruptif situé à moins metres of an occupied building or within 8 km de 800 m d’un bâtiment habité ou à moins de of the limits of a city, town or designated huit kilomètres des limites d’une ville, d’un community and that has the potential to village ou d’une communauté désignée et produce more than 30,000 m3 of gas per day, capable de produire plus de 30 000 m3 de gaz par jour : (i) install a surface hydrogen sulphide gas (i) poser en surface, un système de détection detection and alarm system, d’hydrogène sulfuré et un système d’alarme, (ii) install a subsurface safety valve in the tubing (ii) poser une vanne sousterraine de sécurité at least 30 metres below the surface, and dans la colonne de production, à une profondeur minimale de 30 m, (iii) ensure that the safety valve closes (iii) vérifier que la vanne de sécurité ferme automatically in the event of an uncontrolled automatiquement en cas d’écoulement non flow of oil or gas or in the event of a failure contrôlé de pétrole ou de gaz ou advenant in the system which operates the valve; une panne du système opérationnel de la vanne; (e) for a field facility whose site is located e) s’il s’agit d’une installation de champ située à within 800 metres of an occupied building or moins de 800 m d’un bâtiment habité ou à within 8 km of the limits of a city, town or moins de huit kilomètres des limites d’une ville, designated community and that has the d’un village ou d’une communauté désignée et capacity to handle more than 30,000 m3 of gas capable de produire plus de 30 000 m3 de gaz per day, par jour : (i) install a hydrogen sulphide gas detection and (i) poser un système de détection d’hydrogène alarm system, and sulfuré et un système d’alarme, (ii) install an automatic shutdown system (ii) poser un système de fermeture automatique directly connected to the detection and alarm relié directement aux systèmes de détection systems so that in the event of an et d’alarme, afin de fermer uncontrolled flow of oil or gas, the field automatiquement l’installation en cas facility automatically shuts down. d’écoulement non contrôlé de pétrole ou de gaz. (3) The licensee of a well or field facility shall, if (3) À la demande du délégué aux opérations, le requested by the Chief Operations Officer, titulaire d’une licence de puits ou d’installation de champ doit : (a) install and maintain monitoring stations that a) mettre en place et entretenir des stations de measure ambient air quality by a method contrôle de la qualité de l’air ambiant équipées specified by the Chief Operations Officer; d’un dispositif de mesure du type indiqué par le délégué aux opérations; (b) record data on hydrogen sulphide b) enregistrer les concentrations d’hydrogène concentration in flared gas with flaring rates sulfuré dans les gaz brûlés à la torche en and times; and indiquant la date, l’heure et le débit de brûlage; (c) submit to the Minister or make available to the c) remettre au ministre, ou mettre à la disposition Chief Operations Officer on request, any du délégué aux opérations sur demande, tous measurements or data recorded pursuant to les renseignements et les données recueillis en paragraph (a) or (b). application de l’alinéa a) ou b). c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 137 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 171. Article 171. (4) The Chief Operations Officer may (4) Le délégué aux opérations peut procéder de la façon suivante en ce qui concerne une communauté désignée: (a) direct that any unincorporated community a) décider qu’une communauté non constituée en comparable in size to a village or hamlet is a personne morale et de taille comparable à un designated community for the purposes of this village ou à un hameau est une communauté section; and désignée pour les besoins du présent article; (b) determine the boundary of the designated b) déterminer les limites de la communauté community for the purposes of this section. désignée pour les besoins du présent article. (5) In this section, (5) Les définitions suivantes s’appliquent au présent article : “designated community” means a designated « communauté désignée » s’entend d’une community referred to in paragraph (4)(a); communauté désignée visée à l’alinéa (4)a); « communauté désignée » ”designated community” “public place” means a building to which the public « endroit public » s’entend d’un bâtiment accessible normally has access or a campground, picnic ground, au public, d’une aire de campement reconnue, d’une playing field or similar area. « endroit public » aire à piques-niques, d’un terrain de jeux ou d’une autre installation ou aire occupée ou fréquentée par le public. “public place” 171. Bulk handling of fuel and consumables (Manutention en vrac du combustible et de consommables) 171. Bulk handling of fuel and consumables 171. Manutention en vrac du combustible et de consommables The licensee of a well or field facility shall ensure that Le titulaire d’une licence de puits ou d’installation de champ doit veiller à ce que les conditions suivantes soient respectées : (a) drilling fluid additives are a) les additifs pour fluide de forage sont : (i) stored and handled in a manner that (i) stockés et manutentionnés de manière à minimizes their deterioration and prevents limiter le plus possible leur détérioration et à damage to the environment, and prévenir tout dommage à l’environnement, (ii) if bulk transfer systems are not used, (ii) emballés dans des récipients bien étiquetés, packaged in properly labelled containers; s’ils ne sont pas tranférés en vrac; (b) liquid fuel and oils are transported, transferred b) les combustibles liquides et les huiles sont and stored in a closed system; transportés, transférés et stockés dans des dispositifs fermés; (c) all reasonable precautions are taken to avoid c) toutes les précautions raisonnables sont prises spillage while transferring fuel; pour éviter les déversements de combustible lors du transfert; (d) when a fuel transfer is completed, the transfer d) après un transfert de combustibles, les flexibles hoses used in the transfer are drained and de transfert sont vidés puis bouchés; securely plugged; and Page 138 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 172. Article 172. (e) bulk fuel storage containers are surrounded by e) les réservoirs de stockage de combustible en an impermeable dike of sufficient height and vrac sont entourés d’une digue imperméable de strength to contain within its perimeter all the hauteur et de résistance suffisantes pour fuel in the storage containers. contenir la totalité du contenu du réservoir. 172. Disposal of oil (Élimination de pétrole) 172. Disposal of oil 172. Élimination de pétrole (1) The licensee of a well must not burn or otherwise (1) Le titulaire d’une licence de puits ne doit procéder dispose of oil recovered from the well except in à l’élimination de pétrole récupéré du puits par brûlage accordance with this section. ou par tout autre moyen qu’en conformité avec les dispositions du présent article. (2) The licensee of a well may, with the approval of the (2) Le titulaire de licence d’un puits peut, avec Chief Operations Officer, burn or otherwise dispose of l’approbation du délégué aux opérations, éliminer du pétrole récupéré du puits par brûlage ou par un autre moyen : (a) oil produced during a formation flow test or a a) durant une période maximale de 24 heures, au well test, if the disposal operation is conducted cours d’essais d’écoulement de formation ou over a period not exceeding 24 hours and at d’essais du puits, à des taux et volumes ne rates and in volumes not greater than those dépassant pas ceux nécessaires pour necessary to unload, clean up and evaluate the décharger, nettoyer ou évaluer le puits; well; (b) oil produced during an extended formation flow b) durant une période et aux taux et volumes fixés test or well clean-up operation, if the disposal dans l’approbation, au cours d’essais operation is conducted over the period, and at d’écoulement de formation prolongés ou de rates and volumes, set out in the approval; or travaux de nettoyage du puits; (c) waste oil or contaminated oil that cannot be c) si le pétrole récupéré est inutilisable ou economically recovered. contaminé et ne peut être récupéré de façon rentable. (3) The Chief Operations Officer may refuse to grant (3) Le délégué aux opérations peut donner son an approval under subsection (2) unless the Chief approbation en vertu du paragraphe (2) pour Operations Officer is satisfied that the burning or other l’élimination de pétrole par brûlage ou par un autre disposal of the oil will not constitute waste or create a moyen s’il est d’avis que l’opération ne constitue pas hazard. un gaspillage et n’entraînera pas d’effets néfastes. (4) The licensee of a well must not, during a (4) Il est interdit au titulaire de licence d’un puits de formation flow test or well test, produce from the well récupérer du puits, au cours d’un essai d’écoulement volumes of oil that exceed a quantity that can either be de formation ou un essai de puits, une quantité de safely stored, burned or otherwise disposed of in pétrole supérieure à celle qui peut en toute sécurité accordance with subsection (2) and the approval être stockée ou éliminée par brûlage ou par un autre granted under that subsection. moyen approuvé conformément aux dispositions du paragraphe (2) et à l’approbation donnée en vertu de ce même paragraphe. (5) The licensee of a well may burn or otherwise (5) Le titulaire de licence d’un puits peut éliminer du dispose of oil recovered from the well if the licensee pétrole récupéré du puits par brûlage ou par un autre considers it necessary to do so because of an moyen s’il est d’avis qu’une telle mesure est rendue emergency situation if the licensee nécessaire afin de remédier à une situation d’urgence, à condition : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 139 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 12 PARTIE 12 Section 173. Article 173. (a) undertakes such measures as may be a) de prendre les mesures qui s’imposent pour necessary to ensure the safety of the public; assurer la sécurité publique; and (b) undertakes such measures as may be b) de prendre les mesures qui s’imposent pour necessary to limit any hazardous effect. limiter les effets néfastes. (6) When the licensee burns or otherwise disposes of (6) Lorsque le titulaire de licence élimine du pétrole oil pursuant to subsection (5), the licensee shall récupéré du puits par brûlage ou par un autre moyen en application du paragraphe (5), il doit : (a) clean up, to the extent practicable, any land a) éliminer, dans la mesure du possible, tout sol polluted by the disposal; and pollué par l’opération; (b) notify the Chief Operations Officer of the b) en aviser le délégué aux opérations dans les 24 disposal within 24 hours after the disposal heures de l’achèvement de l’opération. operation is completed. 173. Oil storage (Stockage de pétrole) 173. Oil storage 173. Stockage de pétrole (1) Oil must not be stored in any area of operations (1) Il est interdit de stocker du pétrole sur un under these Regulations in unprotected earth chantier visé par le présent règlement, dans des fosses excavations or in storage receptacles that, in the non revêtues ou dans des réservoirs qui sont, selon opinion of the Chief Operations Officer, are inadequate l’avis du délégué aux opérations, inadéquats ou or likely to allow waste, loss, leakage or evaporation or susceptibles de donner lieu à un gaspillage, des pertes, to constitute a fire hazard or an environmental hazard des fuites ou une évaporation, ou de présenter un in general. danger d’incendie ou une menace pour l’environnement. (2) Crude oil storage tanks must comply with the (2) Les réservoirs de stockage de pétrole brut doivent American Petroleum Institute’s standards and être conformes à la norme API Std 620 intitulée Design specifications titled Design and Construction of Large, and Construction of Large, Welded, Low-pressure Welded, Low-pressure Storage Tanks (API Storage Tanks, à la norme API Std 650 intitulée Welded Standard 620), Welded Steel Tanks for Oil Storage (API Steel Tanks for Oil Storage, et à la norme API Spec 12B Standard 650) and Bolted Tanks for Storage of intitulée Bolted Tanks for Storage of Production Liquids Production Liquids (API Specification 12B). publiées par l’ American Petroleum Institute. (3) Each tank or group of tanks must be surrounded by (3) Chaque réservoir ou groupe de réservoirs doit être a dike or firewall of a net capacity greater than that of entouré d’une digue ou d’un mur pare-feu d’une the largest tank within the dike or firewall, or such capacité nette supérieure à celle du plus grand greater capacity as the Chief Operations Officer may réservoir situé dans son périmètre, ou d’une capacité require, and the dike or firewall must be maintained in exigée par le délégué aux opérations; cette digue ou ce good condition and the area encompassed by it kept mur doit être maintenu en bon état, et le sol doit y être free from grass, weeds or other extraneous dépourvu de végétation et de toutes matières combustible material. étrangères combustibles. (4) Each tank, group of tanks or production equipment (4) Chaque réservoir, groupe de réservoirs ou matériel must be located so as to comply with the Fire de production doit être situé de façon à satisfaire aux Prevention Act and its regulations, and if no such exigences des règlements d’application de la Loi sur la regulations apply, they must be located not less prévention des incendies ou, en l’absence de tels than 60 metres from any right-of-way for a highway, règlements, à au moins 60 m de toute emprise, réserve road or pipeline, any public utility, building, installation routière ou de pipeline, infrastructure d’utilité publique, or works or any reservation for national defence, unless bâtiment, installation, ouvrage ou réserve de la défense otherwise approved by the Chief Operations Officer. nationale, sauf indication contraire du délégué aux Page 140 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 174. Article 174. opérations. PART 13 (PARTIE 13) PART 13 PARTIE 13 RECORDS AND REPORTS (REGISTRES ET RAPPORTS ) RECORDS AND REPORTS REGISTRES ET RAPPORTS 174. Notice and submission prior to operation start (Avis précédant le début des travaux) 174. Notice and submission prior to operation 174. Avis précédant le début des travaux start On the request of the Chief Operations Officer, the Lorsque le délégué aux opérations le demande, le licensee of a well shall notify the Minister of the time titulaire de licence doit aviser le ministre au moins 48 the licensee intends to begin the drilling operation for heures avant le début des travaux de forage ou de the well, or any well operation in respect of the well, at l’exploitation du puits. least 48 hours before that time. 175. Notice of drilling and rig release (Avis de forage et de retrait de l’appareil de forage) 175. Notice of drilling and rig release 175. Avis de forage et de retrait de l’appareil de forage The licensee of a well shall notify the Minister of each of Le titulaire d’une licence de puits doit aviser le ministre the following events by the end of the day following dans les 24 heures lorsque l’un des événements that event suivants se produit : (a) the date on which a drilling rig arrives at the a) la date d’arrivée de l’appareil de forage sur le well site; chantier du puits; (b) the hour and date of a spud-in at the well site b) l’heure et la date du démarrage d’un forage ou or a re-entry of the well for the purpose of de la rentrée dans un puits pour y effectuer de further drilling or a well operation; and nouveaux travaux de forage ou l’exploitation de celui-ci; (c) the hour and date on which any drilling rig is c) l’heure et la date auxquelles l’appareil de released from the well. forage est retiré du puits. 176. Release of information (Divulgation de renseignements) 176. Release of information 176. Divulgation de renseignements (1) The Minister shall keep the following information (1) Le ministre considère les renseignements ci- confidential at all times dessous confidentiels en tout temps : (a) all pool studies and reserve estimates a) les études de gisements et estimations des submitted by the licensee under these réserves présentées par un titulaire de licence Regulations unless filed at an inquiry or a en vertu du présent règlement, sauf si ces public hearing; and renseignements ont été présentés dans le cadre d’une enquête ou d’une audience publique; (b) all information submitted to the Minister or the b) tous renseignements ayant été présentés au Chief Operations Officer but not required by ministre ou au délégué aux opérations, qui ne these Regulations to be so submitted. sont pas exigés par le présent règlement. (2) All information submitted to the Minister or the (2) Tout renseignement relatif à un puits remis au Chief Operations Officer in respect of a well as required ministre ou au délégué aux opérations pour satisfaire by these Regulations must be released from aux exigences du présent règlement cesse d’être confidential status considéré comme confidentiel : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 141 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 176. Article 176. (a) after a period of three calendar months from a) après une période de trois mois civils à the rig release date for a well or portion of a compter de la date de retrait de l’appareil de well classified as a development well pursuant forage d’un puits ou d’une partie de puits to subsection 16(3); classifié comme puits de développement en vertu du paragraphe 16(3); (b) after a period of six calendar months from the b) après une période de six mois civils à compter rig release date for a well or portion of a well de la date de retrait de l’appareil de forage classified as an exploratory outpost well d’un puits ou d’une partie de puits classifié pursuant to subsection 16(4); comme puits de sondage d’extension en vertu du paragraphe 16(4); (c) after a period of one year from the rig release c) après une période de un an à compter de la date for a discovery well or portion of a date de retrait de l’appareil de forage d’un discovery well or a well or portion of a well puits de découverte ou d’une partie de ce puits, classified as an exploratory wildcat well ou d’un puits ou d’une partie d’un puits pursuant to subsection 16(5), (6) or (7); classifié comme puits de reconnaissance en vertu des paragraphes 16(5), (6) et (7); (d) after a period of one year from the rig release d) après une période de un an à compter de la date when a well has been re-entered and, in date de retrait de l’appareil de forage lorsqu’un the opinion of the Chief Operations Officer, a puits a été réouvert si, de l’avis du délégué aux new pool has been identified; or opérations, un nouveau gisement a été découvert; (e) after a period of three years following the rig e) après une période de trois ans de la date de release date for a well or a portion of a well retrait de l’appareil de forage lorsqu’il s’agit forming part of an experimental scheme. d’un puits ou d’une partie de puits faisant partie d’un plan d’expérimentation. (3) Despite subsection (2), if information in respect of (3) Malgré les dispositions du paragraphe (2), les a well is released in accordance with subsection (2) and renseignements qui ont cessé d’être considérés comme the well is later reclassified, the information released confidentiels en vertu du paragraphe (2) ne shall not be reclassified as confidential. redeviennent pas confidentiels dans l’éventualité où le puits est reclassifié. (4) The following information furnished under these (4) Les renseignements suivants, fournis en vertu du Regulations must be open to the public at all times présent règlement, doivent être accessibles au public en tout temps : (a) the position, elevation, current depth, casing a) les coordonnées géographiques, l’altitude, le and cementing data and status of a well; statut et la profondeur du puits et les données concernant le tubage et la cimentation; (b) all applications and submissions made to the b) toutes les demandes et présentations faites au Minister or the Chief Operations Officer for the ministre et au délégué aux opérations en vue purpose of a hearing or investigation; d’une audience ou de l’étude d’une demande; (c) production and injection volumes included in c) les volumes d’injection et de production que monthly reports submitted under section 191; renferment des rapports mensuels fournis en vertu de l’article 191; (d) spud-in dates and rig release dates; and d) les dates de démarrage du forage et du retrait de l’appareil de forage; Page 142 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 177. Article 177. (e) storage data for liquefied petroleum gas or e) les données concernant le stockage de gaz de gases. pétrole liquéfié. (5) Any information submitted to the Minister or the (5) Tout renseignement remis au ministre ou au Chief Operations Officer in respect of a well or field délégué aux opérations concernant un puits ou une facility as required by these Regulations may be installation de champ en application du présent released at any time with the written consent of the règlement peut être divulgué en tout temps avec licensee of the well or field facility. l’autorisation écrite du titulaire de licence pour ce puits ou cette installation de champ. (6) Despite subsection (2), information obtained in (6) Malgré les dispositions du paragraphe (2), les respect of a well as required by these Regulations may renseignements obtenus au sujet d’un puits en be released at any time if application du présent règlement peuvent être divulgués en tout temps si : (a) the oil and gas rights agreement pursuant to a) l’entente sur les droits pétroliers et gaziers en which the well was drilled is surrendered or vertu de laquelle le puits a été foré est cancelled or expires without being renewed; or abandonnée, annulée ou expire sans être renouvelée; (b) the well is in a part of the oil and gas rights b) le puits est situé dans une partie de location of an oil and gas rights agreement and l’emplacement visé par une entente sur les the agreement is surrendered or cancelled as to droits pétroliers et gaziers et cette partie de that part or the part ceases to be subject to the l’entente est abandonnée ou annulée ou cesse agreement when it is renewed. d’être l’objet de l’entente lorsque celle-ci est renouvelée. (7) Despite anything in this section, the Minister, on (7) Malgré les dispositions du présent article, le being satisfied that it is in the public interest to do so, ministre peut ordonner que soient divulgués tous les may give directions for the release of any information renseignements obtenus en vertu du présent règlement obtained under these Regulations in respect of any concernant un puits, s’il est d’avis qu’il est dans well. l’intérêt public de le faire. 177. Notice respecting operators (Avis concernant l’exploitant) 177. Notice respecting operators 177. Avis concernant l’exploitant (1) When the licensee of a well does not operate the (1) Lorsque le titulaire de licence d’un puits n’est pas well, the licensee shall submit to the Minister l’exploitant du puits, il doit remettre au ministre : (a) a notice respecting the appointment of a a) un avis indiquant la personne désignée pour person to act on behalf of the licensee in agir en son nom pour tout ce qui a trait au respect of all matters pertaining to the well or puits ou pour ce qui a trait aux questions in respect of any particular matters pertaining portant sur le puits et précisées dans l’avis; to the well that are specified in the notice; and (b) a notice respecting the termination or b) un avis l’informant de la résiliation de la replacement of an appointment referred to in désignation exigée en vertu de l’alinéa a) ou du paragraph (a). remplacement de la personne désignée pour le représenter . (2) When the licensee of a field facility does not (2) Lorsque le titulaire de licence d’une installation de operate the field facility, the licensee shall submit to champ n’est pas l’exploitant de l’installation, il doit the Minister remettre au ministre : (a) a notice respecting the appointment of a a) un avis indiquant la personne désignée pour person to act on behalf of the licensee in agir en son nom pour tout ce qui a trait à respect of all matters pertaining to the field l’installation de champ ou pour ce qui a trait c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 143 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 178. Article 178. facility or in respect of any particular matters aux questions portant sur l’installation de pertaining to the field facility that are specified champ et précisées dans l’avis; in the notice; and (b) a notice respecting the termination or b) un avis l’informant de la résiliation de la replacement of an appointment referred to in désignation exigée en vertu de l’alinéa a) ou du paragraph (a). remplacement de la personne désignée pour le représenter. (3) A notice submitted pursuant to subsection (1) (3) Un avis remis en application des paragraphes (1) or (2) must show, as the case requires, et (2) doit indiquer, selon le cas : (a) the effective date of the appointment or a) la date d’entrée en vigueur de la désignation, replacement appointment or of the termination de la désignation de remplacement, ou de la of the appointment; and résiliation de la désignation; (b) the address of the person appointed. b) l’adresse de la personne désignée. (4) When a notice is given pursuant to subsection (1) (4) Lorsqu’un avis de désignation d’un représentant or (2) of the appointment of a person, that person shall est présenté en application des paragraphes (1) ou (2), submit to the Minister a notice respecting any , la personne désignée doit aviser le ministre de tout subsequent change in that person’s address. changement d’adresse. (5) A notice required to be furnished to the Minister (5) Tout avis exigé par le présent article doit être under this section must be furnished not later than 30 remis au ministre dans les 30 jours suivant la date days following the effective date of the appointment, d’entrée en vigueur de la désignation, de la résiliation replacement appointment, appointment termination or de la désignation, du remplacement de la personne change of address, as the case may be. désignée ou du changement d’adresse, selon le cas. 178. Reference for well depths (Mesure des profondeurs de puits) 178. Reference for well depths 178. Mesure des profondeurs de puits (1) The licensee of a well shall, during a drilling (1) Au cours du forage ou de l’exploitation d’un puits, operation or well operation, measure any depth in the le titulaire d’une licence de puits doit prendre toutes les well from a single reference point which must either be mesures de profondeur à partir d’un même niveau de the kelly bushing or the rotary table of the drilling rig. référence, qui est soit la fourrure d’entraînement de la tige carrée, soit la table de rotation de l’appareil de forage. (2) The licensee shall, immediately prior to spud-in, (2) Le titulaire de licence doit mesurer, consigner et measure and record the distance from the kelly rapporter au ministre, la distance entre la table de bushing or rotary table to ground level and report that rotation ou la fourrure d’entraînement de la tige carrée information to the Minister by the end of the next day. et la surface du sol juste avant de démarrer le forage. 179. Notification of significant events (Avis d’événements importants) 179. Notification of significant events 179. Avis d’événements importants (1) Unless otherwise directed by the Chief Operations (1) Sauf directives contraires du délégué aux Officer, the licensee of a well or field facility shall notify opérations, le titulaire de licence doit aviser le ministre the Minister immediately of any significant situation or immédiatement de toute situation ou événement significant event, including a loss of human life, a important, notamment un décès, la disparition d’une missing person, serious injury to a person, a fire or personne, une blessure grave, un incendie ou une explosion, loss of well control, an imminent threat to explosion, la perte de contrôle d’un puits, un danger personnel, the public or the safety of a site, an oil or imminent menaçant la sécurité du personnel, du public toxic chemical spill or release or the discovery of oil or ou du chantier, un déversement de pétrole ou de gas. produit chimique toxique ou la probabilité de découverte imminente de pétrole ou de gaz. Page 144 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 180. Article 180. (2) The licensee shall submit a full written report of a (2) Le titulaire de licence doit remettre par écrit au situation or event referred to in subsection (1) to the ministre, un rapport complet de la situation ou Minister as soon as practicable after giving the l’événement visés au paragraphe (1) dès que possible notification required by that subsection. après l’en avoir avisé en application des exigences de ce paragraphe. 180. Press releases (Communiqués de presse) 180. Press releases 180. Communiqués de presse (1) The licensee of a well shall notify the Minister of (1) Le titulaire d’une licence de puits doit aviser le any intention to issue a press release or to hold a press ministre lorsqu’il entend transmettre un communiqué à conference concerning any discovery, blowout or other la presse ou convoquer un entretien avec la presse au significant event that occurs at the well. sujet d’une découverte de pétrole, d’une éruption de puits ou de tout autre événement important concernant le puits. (2) The notification referred to in subsection (1) must (2) L’avis visé au paragraphe (1) doit être donné au be given at least 24 hours in advance of the press moins 24 heures avant la transmission du communiqué release or of the press conference except that if an à la presse ou la convocation de l’entretien avec la emergency is involved, the notification shall be given as presse, sauf en cas d’urgence, où l’avis doit être donné much as possible in advance of the issuance of the le plus longtemps possible à l’avance. press release or the holding of the press conference. 181. Tour sheets (Rapports de poste) 181. Tour sheets 181. Rapports de poste (1) The licensee of a well shall ensure that a (1) Le titulaire d’une licence de puits doit veiller à ce comprehensive record of the drilling operations, all well qu’un registre complet du forage et de l’exploitation du operations and observations of weather conditions is puits et des observations des conditions prepared during the operations in the form of tour atmosphériques soit préparé au cours des travaux sous sheets that contain the information required by the forme de rapports de poste incluant les directions of the Chief Operations Officer. renseignements exigés selon les directives du délégué aux opérations. (2) The licensee shall ensure that the tour sheets for (2) Le titulaire de licence doit veiller à ce que les the well are kept during the period any drilling rig or rapports de poste pour le puits soient conservés sur le service rig is engaged in any operation, and are kept chantier du puits durant toute période pendant laquelle on the well site during any time the operations are un appareil de forage ou un appareil d’intervention est being carried out. engagé dans des travaux. (3) The tour sheets for a calendar week must be (3) Le titulaire de licence doit remettre au ministre une submitted by the licensee to the Minister by Friday of copie des rapports de poste pour une semaine civile le the next week. vendredi de la semaine suivant celle où ils sont préparés. 182. Summary reports (Rapports sommaires) 182. Summary reports 182. Rapports sommaires (1) The licensee of a well shall, in respect of each day (1) Le titulaire d’une licence de puits doit, pour during the drilling operation for the well, submit to the chaque jour au cours des travaux de forage d’un puits, Minister, if applicable, remettre au ministre, s’il y a lieu, une copie : (a) the drilling report for that day, if drilling a) du rapport de forage du jour, si forage y a eu occurred on that day; lieu; (b) the geological report for that day, if drilling b) du rapport géologique du jour, si forage y a eu occurred on that day; and lieu; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 145 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 183. Article 183. (c) the testing report for that day, if testing c) du rapport d’essais du jour, si des essais y ont occurred on that day. été menés. (2) A report referred to in subsection (1) must contain (2) Les rapports visés au paragraphe (1) doivent information required by the directions of the Chief inclure certains renseignements exigés selon les Operations Officer and be submitted to the Minister by directives du délégué aux opérations, et être remis au the end of the day following the day to which the ministre avant la fin de la journée suivant celle pour report relates. laquelle ils sont préparés. 183. Submission requirements under Part 8 (Expédition d’échantillons au ministre en vertu de la partie 8) 183. Submission requirements under Part 8 183. Expédition d’échantillons au ministre en vertu de la partie 8 The licensee of a well shall, in accordance with the Le titulaire de licence d’un puits doit, selon les Chief Operations Officer’s directions, submit to the directives du délégué aux opérations, remettre au Minister by delivery to the address or the addresses ministre, par envoi à l’adresse indiquée dans les specified in the directions directives, : (a) within 90 days after the rig release date for a a) le rapport d’évaluation à l’égard du puits, en drilled well, the evaluation report prepared in application du paragraphe 103(2), dans les 90 respect of the well pursuant to jours qui suivent la date de libération de subsection 103(2); l’appareil de forage; (b) within 30 days after the rig release date of the b) deux séries complètes des échantillons des well, two complete sets of the washed drill déblais de forage lavés visés à l’alinéa 105a), cutting samples referred to in dans les 30 jours qui suivent la date de paragraph 105(a); libération de l’appareil de forage; (c) within 60 days after the rig release date, the c) toute carotte classique visée à l’alinéa 106(2)c), conventional cores described in dans les 60 jours qui suivent la date de paragraph 106(2)(c), boxed in accordance with libération de l’appareil de forage; that paragraph; (d) within six months after the rig release date, d) toute carotte, ou reliquat de carotte prélevée any sidewall core or any remnant of the core par carottage latéral, dans les six mois qui remaining after any analyses of the core; suivent la date de libération de l’appareil de forage; (e) within 60 days after the completion of the e) les résultats, les données, les analyses et les taking of a conventional core, sidewall core or schémas obtenus, dans les 60 jours qui suivent fluid sample required under Part 8 in respect of le prélèvement d’un carottage classique ou the well or of a segregation test or well latéral, d’un échantillon de fluide exigé pour le operation, the results, data, analyses and puits en vertu de la partie 8, ou encore, par schematics obtained; suite d’un essai d’isolement ou de l’exploitation du puits; (f) within 30 days of taking any wireline logs, f) dans les 30 jours qui suivent la date d’un essai au câble : (i) two printed copies of all wireline logs run, (i) deux copies imprimées de toutes diagraphies au câble obtenues, (ii) on request by the Chief Operations Officer, (ii) sur demande du délégué aux opérations, les wireline logs in digital form if they have diagraphies sous format digital, si elles ont been prepared in that form, and été préparées sous ce format, Page 146 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 184. Article 184. (iii) on request by the Chief Operations Officer, (iii) sur demande du délégué aux opérations, les all wireline log data obtained in respect of données de diagraphies obtenues à l’égard the well before the well is completed, du puits avant son achèvement, son abandon suspended or abandoned; provisoire ou son abandon définitif; (g) within 60 days after the date of the completion g) tout échantillon de fluide visé au of a wireline test, any fluid sample referred to paragraphe 112(4), dans les 60 jours qui in subsection 112(4); suivent la date d’un essai au câble; (h) within 60 days after the date of the completion h) tout échantillon de fluide visé à of a formation flow test, any fluid sample l’alinéa 113(4)b), dans les 60 jours qui suivent referred to in paragraph 113(4)(b); la date d’un essai d’écoulement de formation; (i) within 90 days after the date of completion of a i) les résultats de l’essai, dans les 90 jours qui formation flow test, wireline test, well test or suivent la date d’un essai d’écoulement de pressure survey, results of the test or survey; formation, d’un essai au câble, d’un essai de puits ou de la pression d’un gisement; (j) within six months after the rig release date, j) toute plaque palynologique, ou de any palynological or nanofossil slide produced nannofossiles, produite à partir d’une carotte from a sidewall core that was destroyed in the prélevée par carottage latéral et détruite lors production of the slide; de la production de la plaque, dans les six mois qui suivent la date de libération de l’appareil de forage du puits; (k) within five years after the rig release date, any k) toute plaque pétrographique, ou de foraminiferal or petrographic slide produced foraminifères, produite à partir d’une carotte from a sidewall core that was destroyed in the prélevée par carottage latéral et détruite lors production of the slide; de la production de la plaque, dans les cinq ans qui suivent la date de libération de l’appareil de forage du puits; (l) within 90 days after the rig release date for the l) dans les 90 jours qui suivent la date de service rig that completed the well, the libération de l’appareil de forage d’intervention compositional analysis and description utilisé dans l’achèvement du puits, les résultats prepared pursuant to subsection 118(6); and de l’analyse de composition et la description préparés en application du paragraphe 118(6); (m) within 30 days after its completion, a pool m) dans les 30 jours de son achèvement, les pressure survey conducted pursuant to résultats d’une campagne de mesures de la subsection 119(2). pression d’un gisement menée en application du paragraphe 119(2). 184. Metering records (Registres de production) 184. Metering records 184.
Part document.segment-13
Oil and Gas Drilling and Production Regulations — segment 13
- document.segment-13 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 13
AI-assisted research summary: This provision requires licensees and unit operators to keep specified oil and gas records, retain them for set periods, and submit several reports or notices to the Minister or Chief Operations Officer, often on request or by fixed deadlines.
Registres de production (1) The licensee of a well or field facility shall keep a (1) Le titulaire d’une licence de puits ou d’installation record of the flow through de champ tient un registre du comptage: (a) each group production meter of the licensee a) de chacun de ses compteurs de production that measures the total production from more regroupée mesurant la production totale de than one well in a pool or from a multi-pool plusieurs puits dans un gisement ou d’un puits well; and de gisements multiples; (b) each test production meter used by the b) de chacun des compteurs de production d’essai licensee. qu’il utilise. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 147 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 185. Article 185. (2) The licensee shall retain the records referred to in (2) Le titulaire de licence doit conserver le registre visé subsection (1) for at least one year and, at the request au paragraphe (1) durant au moins un an et le of the Chief Operations Officer, shall submit any of remettre au ministre à la demande du délégué aux those records to the Minister. opérations. 185. Penetration and gas content records (Rapports sur les teneurs en gaz et les vitesses de pénétration) 185. Penetration and gas content records 185. Rapports sur les teneurs en gaz et les vitesses de pénétration The licensee of a well shall submit to the Minister, on À la demande du délégué aux opérations, le titulaire the request of the Chief Operations Officer, d’une licence de puits doit remettre au ministre: (a) the record of the rate of penetration made in a) l’enregistrement de la vitesse de pénétration accordance with paragraph 64(1)(a); and réalisé conformément à l’alinéa 64(1)a); (b) the gas content record referred to in b) le dossier sur la teneur en gaz du fluide de subsection 104(2). forage visé au paragraphe 104(2). 186. Formation flow test records (Rapports d’essais d’écoulement de formation) 186. Formation flow test records 186. Rapports d’essais d’écoulement de formation (1) When records are made in respect of a formation (1) Le titulaire d’une licence de puits doit remettre au flow test pursuant to subsection 113(5), the licensee of ministre les rapports d’essais d’écoulement de the well shall submit the records to the Minister before formation consignés en application du the end of the day following the day on which the paragraphe 113(5), avant la fin de la journée qui suit la records were made. date à laquelle ils ont été consignés. (2) The records submitted pursuant to subsection (1) (2) Les rappoprts visés au paragraphe (1) doivent must include accurate reproductions of any pressure comprendre des reproductions précises des courbes de and flow charts except that if accurate reproductions pression et de débit ou, s’il est impossible de préparer cannot be made, the original charts must be submitted. des reproductions précises, les graphiques originaux. (3) When original charts are submitted pursuant to (3) Lorsque le titulaire de licence remet les graphiques subsection (2), the Minister shall return the charts to originaux en application du paragraphe (2), le ministre the licensee within 30 days after the day on which they doit les lui retourner dans les 30 jours suivant la date à were received. laquelle il les a reçus. 187. Well termination record (Rapport de cessation de travaux) 187. Well termination record 187. Rapport de cessation de travaux (1) The licensee of a well shall record the details of (1) Le titulaire d’une licence de puits doit consigner the manner in which the well has been completed, les détails de l’achèvement, de l’abandon provisoire ou suspended or abandoned and shall submit the record to de l’abandon définitif du puits et remettre ce dossier au the Minister within 21 days after the rig release date in ministre dans les 21 jours suivant la date de libération respect of the well. de l’appareil de forage du puits. (2) The record referred to in subsection (1) must (2) Le dossier visé au paragraphe (1) doit: (a) if requested by the Chief Operations Officer, be a) à la demande du délégué aux opérations, être accompanied by a sketch illustrating the final accompagné d’un croquis illustrant l’état final condition of the well; and du puits; (b) be signed and dated by a professional engineer b) être signé et daté par un ingénieur au service employed or engaged by the licensee. ou à l’emploi du titulaire de licence. Page 148 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 188. Article 188. (3) The licensee of a suspended well shall submit to the (3) Le titulaire de licence d’un puits abandonné Minister a report containing the results of each provisoirement doit remettre au Ministre un rapport inspection of the well made pursuant to renfermant les résultats de chaque inspection du puits paragraph 91(5)(a), within 14 days after the completion menée en application de l’alinéa 91(5)a),dans les 14 of the inspection. jours de la date d’achèvement de l’inspection. 188. Final well report (Rapport final à l’égard du puits) 188. Final well report 188. Rapport final à l’égard du puits (1) The licensee of a well that has been drilled shall (1) Le titulaire de licence d’un puits foré doit préparer prepare a final report for the well and shall submit the un rapport final pour le puits et le remettre au report to the Minister within ministre: (a) a period of 90 days after the rig release date in a) dans les 90 jours suivant la date de libération the case when the well is drilled but not de l’appareil de forage du puits s’il s’agit d’un completed; or puits foré mais non achevé; (b) if the well is completed, a period of 45 days b) dans les 45 jours suivant cette date s’il s’agit after the rig release date. d’un puits achevé. (2) The final well report referred to in subsection (1) (2) Le rapport final visé au paragraphe (1) doit must contain a record of all operational, engineering contenir tous les renseignements d’ordre géologique, and geological information that is relevant to the well technique et opérationnel concernant le puits, et tout and any other information required by the directions of autre renseignement exigé par les directives du the Chief Operations Officer. délégué aux opérations. 189. Maintenance and operating records (Registre d’entretien et d’exploitation) 189. Maintenance and operating records 189. Registre d’entretien et d’exploitation (1) The licensee of a well or field facility shall prepare (1) Le titulaire d’une licence de puits ou d’installation and keep, and submit to the the Minister, on the de champ doit préparer et conserver un registre request of the Chief Operations Officer, current daily d’exploitation qu’il remettra au ministre sur demande operating records respecting du délégué aux opérations et dans lequel il consigne quotidiennement : (a) any inspection, repair or modification of or a) les inspections, réparations ou modifications du significant damage to equipment at the well matériel ou les dommages importants subis site or field facility site, as the case may be; par le matériel sur le chantier du puits ou sur l’emplacement de l’installation de champ, selon le cas; (b) the inspection of their respective sites for b) les inspections de puits ou d’installation de corrosion and erosion and any resulting champ en vue de vérifier la présence de maintenance; corrosion ou d’érosion et les travaux d’entretien pris à la suite de ces inspections; (c) pressure, temperature and flow rate data, in c) les données de pression, de température et de the case of a compressor station or an oil, débit des compresseurs, purificateurs et water or oilfield waste treatment or processing installations de traitement ou de facility; transformation des déchets des eaux, du pétrole ou du champ pétrolifère; (d) the calibration of meters and instruments on d) l’étalonnage des compteurs et autres their respective sites; instruments sur le chantier ou l’emplacement; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 149 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 190. Article 190. (e) the inspection of surface and subsurface safety e) les inspections des vannes de sécurité de valves on their respective sites; and surface et de fond sur le chantier ou l’emplacement; (f) in the case of a well, its status and the status of f) à l’égard d’un puits, son état et l’état its operation. d’avancement de son exploitation. (2) Except as otherwise authorized by the Chief (2) Sauf indication contraire du délégué aux Operations Officer, the licensee shall retain records opérations, le titulaire de licence doit conserver le referred to in subsection (1) for at least five years and registre visé au paragraphe (1) durant au moins cinq shall offer the original or a legible copy of the records ans et, avant de le détruire à la fin de cette période, en to the Minister before destroying them after the five- offrir au ministre soit l’original, soit une copie lisible. year period. 190. Daily production records (Rapports de production quotidienne) 190. Daily production records 190. Rapports de production quotidienne (1) The licensee of a well shall keep the daily records (1) Le titulaire d’une licence de puits doit tenir un required by subsection 145(1) to be made in respect of registre de la production quotidienne du puits tel que the well and shall, at the request of the Chief l’exige le paragraphe 145(1) et en remettre une copie Operations Officer, submit a copy of any of those au ministre sur demande du délégué aux opérations. records to the Minister, (2) The licensee shall retain all records referred to in (2) Le titulaire de licence doit conserver le registre visé subsection (1) until au paragraphe (1) jusqu’à: (a) the abandonment of all wells in the pool in a) l’abandon définitif de tous les puits dans le which the well is completed; or gisement où se situe le puits achevé; (b) if the pool in which the well is completed is one b) l’abandon définitif de tous les puits dans le of two or more pools in a designated field, the champ, s’il y a plusieurs gisements dans un abandonment of all wells in the field. champ où se situe le puits achevé. 191. Monthly production report (Rapports de production mensuelle) 191. Monthly production report 191. Rapports de production mensuelle (1) The licensee of a well shall submit to the Minister, (1) Le titulaire d’une licence de puits doit remettre au not later than the 18th day of each month, a report ministre, au plus tard le 18e jour du mois, un rapport summarizing the data for the well for the preceding résumant les données du puits pour le mois précédent, month recorded pursuant to subsection 145(1). en application du paragraphe 145(1). (2) A report referred to in subsection (1) for any (2) Le rapport mensuel visé au paragraphe (1) peut month may be submitted by a representative of the être remis par un représentant du titulaire de licence licensee authorized for the purpose. autorisé à cette fin. (3) The Chief Operations Officer may authorize a later (3) Le délégué aux opérations peut autoriser, pour les deadline than the one in subsection (1) for the rapports devant être remis en application du submission of reports under that subsection in respect paragraphe (1), une échéance différente de celle of any specified month or months. stipulée, à l’égard d’un mois précis ou de plusieurs mois. (4) The following requirements apply with respect to (4) Les exigences suivantes s’appliquent à la remise de the submission of reports under this section rapports en vertu du présent article: (a) the report must be in a format prescribed or a) le format du rapport doit être prescrit ou approved by the Chief Operations Officer; approuvé par le délégué aux opérations; Page 150 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 191. Article 191. (b) subject to paragraph (c), the report must be an b) sous réserves de l’alinéa c), le rapport doit être original paper document; un original sur papier; (c) if the Chief Operations Officer has approved the c) si le délégué aux opérations a approuvé un furnishing of reports under this section in a format autre qu’une copie papier pour la medium other than original paper documents, remise de rapports en application du présent the reports must be in that other medium article, ceux-ci doivent être remis sous cet unless the Chief Operations Officer otherwise autre format à moins que le délégué aux permits in a particular case. opérations n’ait autorisé d’autres mesures dans un cas particulier. (5) A report under this section (5) Tout rapport remis en application du présent article doit: (a) must contain all the information required by, a) contenir tous les renseignements exigés par les and directives du délégué aux opérations ou les instructions paraissant dans la forme prescrite du rapport; (b) must be completed in accordance with, b) être en complète conformité avec ces directives ou instructions. any general directions issued by the Chief Operations Officer or any instructions shown in the prescribed form of the report. (6) If a licensee (6) Pour les fins du présent règlement, il sera considéré qu’un rapport a été remis au ministre avant la date d’échéance si le titulaire de licence: (a) obtains the consent of the Chief Operations a) obtient le consentement préalable du délégué Officer to the initial submission of reports aux opérations pour remettre tout rapport au under this section by that licensee by fax ministre en vertu du présent article, par voie transmission to the Minister; de télécopieur; (b) in accordance with the conditions of the b) conformément aux conditions du consentement consent, submits to the Minister by fax obtenu, remetle rapport au ministre par voie transmission a report by the submission de télécopieur avant la date d’échéance deadline for the report; and stipulée; (c) submits the original report to the Minister c) présente le rapport original au ministre avant before noon on the fifth business day of the midi du cinquième jour ouvrable du Government following the day on which the gouvernement qui suit la date d’échéance. submission deadline occurs; the original report shall be considered for the purposes of these Regulations to have been submitted to the Minister by the submission deadline. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 151 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 192. Article 192. 192. Annual production report (Rapports de production annuelle) 192. Annual production report 192. Rapports de production annuelle (1) Unless exempted from doing so by the Chief (1) Sauf si le délégué aux opérations l’en exempte, le Operations Officer, the licensee of a well shall submit to titulaire d’une licence de puits doit présenter au the Minister not later than March 1 of each year an ministre, au plus tard le 1er mars de chaque année, un annual report relating to the preceding year for each rapport annuel pour l’année précédente portant sur pool in which any of the licensee’s wells are completed. chaque gisement où les puits du titulaire de licence sont achevés. (2) An annual report referred to in subsection (1) must (2) Le rapport annuel visé au paragraphe (1) doit set out, when applicable, contenir, selon le cas : (a) graphs of production from and injection into a) les graphiques de production et d’injection pour the pool; le gisement; (b) a review of production from and injection into b) un sommaire de la production et de l’injection each well that is located in the pool; pour chaque puits du gisement; (c) a review of the production capability of the c) un sommaire de la capacité de production du pool; gisement; (d) predicted declines in production capability of d) le déclin prévu de la capacité de production du the pool; gisement; (e) details and predictions of pool performance; e) une description détaillée du rendement du gisement; (f) a review of water production; f) un sommaire de la production d’eau; (g) a summary of tests, surveys and alterations in g) pour chaque puits, un résumé des essais, des respect of performance of each well and mesures et des modifications apportées pour alterations to production equipment for the en augmenter le rendement, ainsi que les pool; modifications apportées au matériel de production du gisement; (h) a review of subsurface safety valve h) un résumé de la performance des vannes de performance; and sécurité de fond; (i) a listing of significant modifications to any i) la liste de toutes les modifications importantes equipment at the pool. apportées au matériel à proximité du gisement. (3) Despite subsection (1), (3) Malgré les dispositions du paragraphe (1), les conditions suivantes s’appliquent: (a) when the wells completed in a pool do not have a) lorsque plusieurs puits achevés dans un the same licensee, the Chief Operations Officer gisement ne relèvent pas du même titulaire de may allow one of the licensees to submit one licence, le délégué aux opérations peut report under this section relating to the pool on permettre à l’un des titulaires de licences de behalf of all the licensees; and remettre un rapport portant sur le gisement en vertu du présent article au nom de tous les titulaires de licences; Page 152 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 193. Article 193. (b) when a pool or part of a pool is subject to a b) lorsqu’un gisement ou une partie d’un unit agreement during a year, the report under gisement fait l’objet d’un accord d’union durant this section for that year in respect of the pool une année, le rapport annuel portant sur ce or part of the pool must be submitted by the gisement ou cette partie du gisement en vertu unit operator du présent article doit être remis par l’exploitant unitaire (4) When the performance during a year of a well in a (4) Lorsque le rendement d’un puits pour une année pool differs significantly from performance predictions diffère de façon considérable des prévisions de for that year contained in a report for the pool production du gisement contenues dans le rapport submitted under this section in respect of the previous remis en vertu du présent article à l’égard de l’année year, the licensee shall at the request of the Chief précédente, le titulaire de licence doit remettre au Operations Officer, submit to the Minister performance ministre, à la demande du délégué aux opérations, des evaluations of the well in the pool at intervals set by rapports d’évaluation de rendement du puits, à la the Chief Operations Officer. fréquence établie par le délégué aux opérations. 193. Filing of unit agreements (Dépôt des accords d’union) 193. Filing of unit agreements 193. Dépôt des accords d’union (1) The unit operator under a unit agreement shall (1) L’exploitant unitaire en vertu d’un accord d’union, submit to the Minister doit remettre au ministre: (a) a copy of the form of a) avant la fin du mois qui suit la date de prise d’effet de l’accord d’union, une copie du formulaire de: (i) the unit agreement, and (i) l’accord d’union, (ii) the related unit operating agreement, (ii) l’accord d’exploitation unitaire y relié; before or within one month after the effective date of the unit agreement; (b) a copy of the form of any amendment of b) avant la fin du mois qui suit la date de prise d’effet de toute modification de l’accord d’union, une copie du formulaire de la modification de: (i) the unit agreement, or (i) l’accord d’union, (ii) the related unit operating agreement, (ii) l’accord d’exploitation unitaire y relié; before or within one month after the effective date of the amendment; (c) a copy of the form of any replacement of c) avant la fin du mois qui suit la date de prise d’effet de tout accord se substituant à l’accord d’union, une copie du formulaire de substitution de: (i) the unit agreement, or (i) l’accord d’union, (ii) the related unit operating agreement, (ii) l’accord d’exploitation unitaire y relié. before or within one month after the effective date of the replacement agreement. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 153 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 13 PARTIE 13 Section 194. Article 194. (2) A unit operator need not comply with (2) Un exploitant unitaire n’a pas à se conformer aux subparagraph (1)(a)(i), (1)(b)(i), or (1)(c)(i) by the dispositions des sous-alinéas (1)a)(i), (1)b)(i), ou (1)c)(i) relevant deadline prescribed in subsection (1), if the avant la date d’échéance stipulée au paragraphe (1), si Commissioner is a party to the unit agreement or the le commissaire est une partie à l’accord d’union ou à replacement unit agreement, as the case may be. l’accord de substitution de l’accord d’union, selon le cas. (3) The unit operator under a unit agreement shall (3) L’exploitant unitaire en vertu d’un accord d’union doit: (a) before or within 30 days after the effective date a) remettre au ministre, dans les 30 jours de la of the unit agreement, submit to the Minister a date de prise d’effet d’un accord d’union, une statement showing which tracts have been attestation démontrant les parcelles aptes à qualified for the inclusion in the unit area ; and être incluses dans le secteur unitaire; (b) before or within 30 days after the date on b) remettre au ministre, dans les 30 jours de la which any tract ceased to be included in the date à laquelle une parcelle a cessé d’être unitarea , submit to the Minister a statement incluse dans le secteur unitaire, une attestation identifying the tract and the date. identifiant la parcelle et la date en question. 194. Scheme reporting (Rapports d’évaluation de plans) 194. Scheme reporting 194. Rapports d’évaluation de plans (1) The licensee of a well subject to a scheme shall, in (1) Le titulaire de licence d’un puits qui fait l’objet accordance with the Scheme Approval, submit interim d’un plan doit remettre au délégué aux opérations, evaluations of the scheme to the Chief Operations conformément aux conditions du document Officer. d’approbation de plan, des rapports provisoires d’évaluation du plan en question. (2) When the licensee completes a scheme, the (2) Lorsque le titulaire de licence mène un plan à licensee shall submit a report to the Chief Operations bonne fin, il doit remettre au délégué aux opérations Officer that sets out un rapport contenant : (a) the results of the scheme and supporting data a) les résultats obtenus, appuyés par les données and analyses; and et analyses; (b) in the case of a scheme for enhanced recovery, b) dans le cas d’un plan de récupération assistée, the conclusions of the licensee as to the les conclusions du titulaire de licence quant à potential of the scheme for application to full- l’applicabilité du plan à pleine échelle. scale production. 195. Information respecting working interests (Renseignements concernant les intérêts économiques directs) 195. Information respecting working interests 195. Renseignements concernant les intérêts économiques directs (1) Unless the information is contained in the (1) À moins que ces renseignements ne soient application for the Well Licence, the licensee of a well contenus dans la demande de licence de puits, le shall, within 30 days after the issuance of the Licence, titulaire d’une licence de puits doit, dans les 30 jours give a notice to the Minister showing the names and de la délivrance de la licence, donner par avis au addresses of the owners of the working interests in the ministre les noms et adresses des détenteurs d’intérêts well and their respective percentage shares. économiques directs dans le puits et leurs parts respectives exprimées en pourcentage. Page 154 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 14 PARTIE 14 Section 196. Article 196. (2) When there is any change in the ownership of the (2) Lorsqu’il y a une modification de la propriété des working interests in the well, or the addresses or intérêts économiques directs dans un puits, ou des percentage shares of the owners, the licensee shall give adresses ou des parts respectives exprimées en to the Minister a notice reflecting the change within 30 pourcentage des détenteurs de ces intérêts, le titulaire days after the change is effective. de la licence doit aviser le ministre de la modification dans les 30 jours de la prise d’effet de celle-ci. (3) In this section, “working interest” means a working (3) Pour les besoins du présent article, « intérêt interest as defined in subsection 89(1) of the Act. économique direct » est assimilé à un intérêt économique direct défini au paragraphe 89(1) de la Loi. PART 14 (PARTIE 14) PART 14 PARTIE 14 ENFORCEMENT OF REPORTING REQUIREMENTS (APPLICATION DES EXIGENCES EN MATIÈRE DE RAPPORTS) ENFORCEMENT OF REPORTING REQUIREMENTS APPLICATION DES EXIGENCES EN MATIÈRE DE RAPPORTS 196. Definitions for Part 14 (Définitions) 196. Definitions for Part 14 196. Définitions In this Part, Les définitions qui suivent s’appliquent à la présente partie. “report” includes any information and any notice, « date d’échéance d’un rapport » Signifie, selon document or record; « rapport » le cas: “reporting requirement” means a) lorsque l’exigence en matière de rapport stipule un délai précis pour la remise d’un rapport, la (a) a provision of these Regulations that requires fin de la dernière journée de ce délai; the submission of a report to the Minister, or b) lorsque l’exigence en matière de rapport stipule (b) a request made by the Chief Operations Officer une date d’échéance précise pour la remise pursuant to these Regulations for the d’un rapport, la fin de cette journée. submission of a report to the Minister, if the “submission deadline” notice containing the request specifies the period within which or the deadline by which « exigence en matière de rapports » Signifie: the report must be submitted; « exigence en a) une disposition du présent règlement qui exige matière de rapports » la remise d’un rapport au ministre; “submission deadline” means b) une demande par le délégué aux opérations en (a) in relation to a reporting requirement that vertu du présent règlement, que soit remis un provides for the submission of a report within a rapport au ministre, si l’avis qui renferme la specified period, the expiration of the last day demande précise le délai dans lequel, ou la date of the period; or d’échéance avant laquelle le rapport doit être remis. “reporting requirement” (b) in relation to a reporting requirement that provides for the submission of a report by a « rapport » Comprend tout renseignement et tout avis, specified day, the expiration of that day. « date document ou registre. “report” d’échéance d’un rapport » c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 155 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 14 PARTIE 14 Section 197. Article 197. 197. Other sanctions not affected by Part 14 (Autres sanctions non touchées par la partie 14 ) 197. Other sanctions not affected by Part 14 197. Autres sanctions non touchées par la partie 14 The imposition of a penalty under this Part in respect L’imposition d’une peine en vertu de la présente partie of a contravention of these Regulations does not affect à l’égard d’une infraction aux dispositions du présent the right of the Minister or the Chief Operations Officer règlement ne porte pas atteinte au droit du ministre ou to exercise any other powers under the Act or these du délégué aux opérations d’exercer d’autres pouvoirs Regulations for the imposition of a sanction or remedy en vertu de la Loi ou du présent règlement, pour in respect of the same contravention. imposer une sanction ou un recours à l’égard de la même infraction. 198. Request to submit a report (Demande de présentation d’un rapport) 198. Request to submit a report 198. Demande de présentation d’un rapport When a provision of these Regulations or a licence Lorsqu’une disposition du présent règlement ou d’une requires a licensee to submit a report to the Minister licence exige d’un titulaire de licence qu’il remette un on the request of the Chief Operations Officer, rapport au ministre à la demande du délégué aux opérations, les conditions suivantes s’appliquent: (a) the request must be contained in a notice to a) la demande doit être sous forme d’un avis au the licensee; and titulaire de licence; (b) the report must be submitted within the period b) le rapport doit être remis à l’intérieur d’un or by the deadline specified in the notice. délai stipulé ou avant la date d’échéance indiquée dans l’avis. 199. Penalties related to section 191 reports (Peines pécuniaires relatives aux rapports en vertu de l’article 191) 199. Penalties related to section 191 reports 199. Peines pécuniaires relatives aux rapports en vertu de l’article 191 (1) When a licensee is required to furnish a report (1) Un titulaire de licence qui manque à son under section 191 in respect of a month but fails to do obligation de remettre un rapport mensuel en vertu de so by the submission deadline for that report, the l’article 191 avant la date d’échéance, est passible licensee is liable to pay a penalty of $500. d’une peine pécuniaire de 500 $. (2) When a licensee furnishes a report under (2) Un titulaire de licence qui remet un rapport section 191 in respect of a month before or after the mensuel en vertu de l’article 191 avant ou après la date submission deadline for the report but the report omits d’échéance mais qui omet d’y mentionner un ou one or more wells that should have been included in it, plusieurs puits qui devraient y être inclus, est passible the licensee is liable to pay a penalty of $100 in respect d’une peine pécuniaire de 100 $ pour chacun des puits of each of those omitted wells. qu’il a omis de mentionner. (3) If a licensee submits a report under section 191 (3) Un titulaire de licence qui remet un rapport before or after its submission deadline and the report mensuel en vertu de l’article 191 avant ou après la date is not in compliance with subsection 191(4), the d’échéance mais que celui-ci n’est pas conforme aux licensee is liable to pay a penalty of $1,000. exigences du paragraphe 191(4), est passible d’une peine pécuniaire de 1 000 $. (4) When a report submitted pursuant to section 191 (4) Un titulaire de licence qui remet un rapport contains one or more of the following kinds of errors, mensuel en application de l’article 191, lequel contient namely, une ou plusieurs des erreurs énumérées ci-après, est passible d’une peine pécuniaire de 100 $ pour chacune de ces erreurs: Page 156 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 14 PARTIE 14 Section 200. Article 200. (a) the omission of or an error in the identification a) il y a omission de mentionner le code code issued to the licensee pursuant to the Oil d’identification attribué au titulaire de licence and Gas Licence Administration Regulations; en vertu du Règlement sur l’administration des licences de pétrole et de gaz, ou erreur dans la référence à celui-ci; (b) the omission of or an error in the unique b) il y a omission de mentionner le numéro identifying number for a well; identificateur unique d’un puits, ou erreur dans la référence à celui-ci; (c) the omission of or incorrect reference to the c) il y a omission de mentionner le mois de production month to which the report relates; production sur lequel porte le rapport, ou or erreur dans la référence à celui-ci; (d) an error within any class of errors specified in d) il s’y glisse une erreur de la sorte précisée dans the directions of the Chief Operations Officer les directives du délégué aux opérations en for the purposes of this section; rapport avec le présent article. the licensee who submitted the report is liable to pay a penalty of $100 in respect of each of those errors. 200. Other automatic penalties (Autres peines automatiques) 200. Other automatic penalties 200. Autres peines automatiques A person who is required to submit to the Minister any Quiconque manque à son obligation de remettre au of the following reports and fails to do so within the ministre l’un des rapports suivants dans le délai period or by the submission deadline for the report is prescrit ou avant la date d’échéance fixée pour la liable to pay a penalty of $1000: remise de ce rapport est passible d’une peine pécuniaire de 1 000: (a) a well termination record under section 187; a) un rapport de cessation de travaux en vertu de l’article 187; (b) a final well report under section 188; b) un rapport final pour le puits en vertu de l’article 188; (c) an annual report under section 192; c) un rapport annuel en vertu de l’article 192; (d) a copy of the form of any agreement or d) une copie du formulaire de tout accord d’union amendment referred to in subsection 193(1) or ou d’une modification de celui-ci visé au a statement referred to in subsection 193(3); paragraphe 193(1) ou d’une attestation visée au paragraphe 193(3); (e) a notice under section 195. e) un avis en vertu de l’article 195. 201. Discretionary penalties (Peines discrétionnaires) 201. Discretionary penalties 201. Peines discrétionnaires (1) This section applies to all reporting requirements (1) Le présent article s’applique à toutes les exigences other than those to which sections 199 and 200 apply. en matière de rapports sauf celles visées par les articles 199 et 200. (2) If a report to which this section applies is not (2) Le délégué aux opérations peut imposer une peine submitted to the Minister pécuniaire maximale de 1 000 $ à quiconque ne remet pas au ministre un rapport faisant l’objet du présent article, et ce, à l’intérieur de l’un des délais suivants: (a) by the submission deadline provided for in the a) avant la date d’échéance prévue par l’exigence relevant reporting requirement; or pertinente en matière de rapport; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 157 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 14 PARTIE 14 Section 202. Article 202. (b) if the reporting requirement contains no b) si aucune date d’échéance de remise n’est submission deadline, within a period, following prévue dans l’exigence en matière de rapport, the time the duty to submit the report arises, à l’intérieur d’un délai raisonnable suivant la that is reasonable in the circumstances having date à laquelle est né le devoir de remettre le regard to the nature of the reporting rapport, eu égard aux circonstances et à requirement, l’exigence en matière de rapport. the Chief Operations Officer may impose on the person required to submit the report a penalty not exceeding $1000. 202. Invoicing for penalties (Facturation des peines pécuniaires) 202. Invoicing for penalties 202. Facturation des peines pécuniaires (1) When a penalty is imposed on a person by or (1) Lorsqu’une personne se voit imposer une peine pursuant to these Regulations, the Chief Operations pécuniaire en en vertu ou en application du présent Officer shall send to that person an invoice for the règlement, le délégué aux opérations doit lui envoyer penalty and inform that person of the reason for its une facture pour cette peine, et l’aviser de la raison qui imposition and the deadline by which payment of the la motive ainsi que de la date d’échéance avant laquelle penalty must be received by the Chief Operations son paiement doit être reçu par celui-ci. Officer. (2) Penalties imposed under these Regulations are (2) Les peines pécuniaires imposées en vertu du payable to the Government. présent règlement sont payables au gouvernement. 203. Waiver of penalty (Annulation de la peine) 203. Waiver of penalty 203. Annulation de la peine (1) Subject to subsection (2), the Chief Operations (1) Sous réserve du paragraphe (2), le délégué aux Officer may waive a penalty imposed by section 199 opérations peut annuler une peine pécuniaire imposée or 200 on being satisfied sous le régime des articles 199 ou 200 s’il juge que: (a) that the person required to submit the report a) la personne ayant manqué à l’obligation de failed to submit it by reason of circumstances remettre un rapport était justifiée en raison de beyond that person’s control or circumstances circonstances indépendantes de sa volonté ou that the person could not have reasonably qu’elle ne pouvait prévoir; foreseen, and (b) that, having regard to all the circumstances of b) eu égard aux circonstances, la personne a the case, the person furnished the report within remis le rapport dans un délai raisonnable a reasonable time after the deadline for après la date d’échéance. furnishing it. (2) An application for a waiver under subsection (1) (2) Une demande d’annulation de la peine en vertu du must be filed with the Chief Operations Officer not later paragraphe (1) doit être déposée auprès du délégué than 30 days after the date of the invoice sent by the aux opérations dans les 30 jours qui suivent la date de Chief Operations Officer pursuant to section 202 for the facturation de la peine en question par le délégué aux penalty sought to be waived. opérations, en application de l’article 202. Page 158 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz PART 14 PARTIE 14 Section 204. Article 204. 204. Appeals respecting penalties (Appel d’une peine) 204. Appeals respecting penalties 204. Appel d’une peine (1) Subject to this section, a person on whom a (1) Sous réserve du présent article, toute personne penalty is imposed by or pursuant to these Regulations qui se voit imposer une peine pécuniaire en vertu ou en may file with the Minister a notice of appeal respecting application du présent règlement peut déposer un avis d’appel auprès du ministre portant sur: (a) that person’s liability for the penalty; a) la question de sa responsabilité; (b) the amount of the penalty; or b) le montant de la peine; (c) the Chief Operations Officer’s refusal to grant a c) le refus du délégué aux opérations d’accorder penalty waiver pursuant to section 203. une annulation de la peine en vertu de l’article 203. (2) On considering an appeal under this section, the (2) Lorsqu’il étudie un appel interjeté en vertu du Minister may, as the case requires, présent article, le ministre peut, selon le cas: (a) confirm the penalty; a) confirmer la peine; (b) revoke the penalty on the ground that the b) révoquer la peine pour le motif que l’appelant appellant was not liable for it; n’en est pas responsible; (c) reduce the amount of the penalty; or c) réduire le montant de la peine; (d) grant any penalty waiver pursuant to d) accorder une annulation de la peine en section 203 that the Chief Operations Officer application de l’article 203, comme aurait pu le could have granted in the first instance. faire le délégué aux opérations en première instance. (3) The Minister may establish general directions (3) Le ministre peut établir des directives d’ordre respecting the commencement of appeals under this général en rapport à l’interjection d’appels en vertu du section and the procedures for the conduct of those présent article et à la procédure pour mener ces appeals. appels. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 159 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE A ANNEXE A SCHEDULE A (ANNEXE A) (Subsection 1(1) and section 170) (Paragraphe 1(1) et article 170) SCHEDULE A ANNEXE A DETERMINATION OF EMERGENCY PLANNING ZONE DÉTERMINATION DU RAYON DE LA ZONE RADIUS D’INTERVENTION EN CAS D’URGENCE Q = Hydrogen Sulphide Release Rate in m3/s Q = Taux d’émission de sulfure d’hydrogène en m3/s Zone Radius (km) = 2.0 x (Q 0.58) when Rayon de la zone (km) = 2,0 x (Q0,58) lorsque Q > 0.01 m3/s and Q < 0.3 m3/s Q > 0,01 m3/s et Q < 0,3 m3/s Zone Radius (km) = 2.3 x (Q 0.68) when Rayon de la zone (km) = 2,3(Q0,68) lorsque Q > 0.3 m3/s and Q < 8.6 m3/s Q > 0,3 m3/s et Q < 8,6 m3/s Zone Radius (km) = 1.9 x (Q 0.81) when Rayon de la zone (km) = 1,9 x (Q0,81) lorsque Q > 8.6 m3/s Q > 8,6 m3/s Page 160 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE B ANNEXE B (Subsection 1(1) and section 132) (Paragraphe 1(1) et article 132) SCHEDULE B (ANNEXE B) SCHEDULE B ANNEXE B GAS-OIL RATIO ADJUSTMENT FACTOR FACTEUR DE CORRECTION DU RAPPORT GAZ-PÉTROLE Unless otherwise approved by the Chief Operations À moins d’une autorisation contraire du ministère, le Officer, the gas-oil ratio adjustment factor is the lesser facteur de correction gaz-pétrole doit être égal à 1 ou à of unity and the calculated gas-oil ratio adjustment la valeur calculée selon l’équation ci-après si celle-ci est factor as determined in the equation: inférieure à 1. F = C F = C GOR RGP ____________________________ ____________________________ GOR ÷ 0,0257 x S RGP ÷ 0,0257 x S Where F = Gas-oil ratio adjustment factor Où F = Facteur de correction du rapport gaz- GOR RGP calculated to the nearest 2 decimals pétrole, calculé au centième près C = Constant, 177.3 C = Constante de 177,3 GOR = Net calculated gas-oil ratio (m3/m3) RGP = Rapport net gaz-pétrole calculé (m3/m3) S = Average separator pressure (kPa) S = Pression moyenne au séparateur (kPa) c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 161 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE C ANNEXE C (Subsection 1(1) and section 132) (Paragraphe 1(1) et article 132) SCHEDULE C (ANNEXE C) SCHEDULE C ANNEXE C MINIMUM UNADJUSTED DAILY OIL ALLOWABLES PRODUCTION MINIMALE QUOTIDIENNE AUTORISÉE DE PÉTROLE AVANT AJUSTEMENT Depth* Minimum UDOA Profondeur* PQAPAA minimale (Metres) (Cubic Metres per Day) (mètres) (mètres cubes par jour) 0 - 2,000 10 0 - 2 000 10 Greater than 2,000 10 plus 1.0 m3 per day Plus de 2 000 10 plus 1,0 m3 par jour par per 100 metres of depth 100 mètres de profondeur *”Depth” means the bottom of the producing zone in a *« Profondeur » désigne le fond de la zone de well. production d’un puits. Page 162 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D (Sections 33 and 36) (Article 33 et 36) SCHEDULE D (ANNEXE D) SCHEDULE D ANNEXE D BLOWOUT PREVENTION REQUIREMENTS FOR DRILLING EXIGENCES EN MATIÈRE D’OBTURATEURS ANTI- OPERATIONS ÉRUPTIONS POUR TRAVAUX DE FORAGE ABBREVIATIONS ABRÉVIATIONS R = single ram-type blowout preventer with one set of M = obturateur anti-éruption simple à un jeu de rams mâchoires R-Blind = blind ram blowout preventer M-Ferm.tot.
Part document.segment-14
Oil and Gas Drilling and Production Regulations — segment 14
- document.segment-14 Verify source ↗
Oil and Gas Drilling and Production Regulations — segment 14
AI-assisted research summary: This schedule provides abbreviations and references for blowout prevention requirements used in well operations.
= Obturateur à mâchoires à fermeture totale R-Pipe = pipe ram blowout preventer M-Ferm./tige = Obturateur à mâchoires à fermeture sur tige A = annular-type blowout preventer A = obturateur anti-éruption de type annulaire S = drilling spool with flanged side outlet connection B = bobine de forage à doubles brides avec sorties for kill and pressure relief lines latérales pour les conduites d’injection et de détente m = metres m = mètres mm = millimetres mm = milli mètres kPa = kilopascals kPa = kilopascals c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 163 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 164 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 165 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 166 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 167 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 168 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 169 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 170 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 171 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 172 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 173 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 174 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 175 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE D ANNEXE D Page 176 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E (Section 76) (Article 76) SCHEDULE E (ANNEXE E) SCHEDULE E ANNEXE E BLOWOUT PREVENTION REQUIREMENTS FOR WELL EXIGENCES EN MATIÈRES D’OBTURATEURS ANTI- OPERATIONS ÉRUPTION POUR TRAVAUX D’EXPLOITATION ABBREVIATIONS ABBRÉVIATIONS R = single ram-type preventer with one set of rams M = obturateur simple à unjeu de mâchoires A = annular-type blowout preventer A = obturateur anti-éruption de type annulaire S = drilling spool with flanged side outlet connection B = bobine de forage à doubles brides avec sorties for kill and pressure relief lines latérales pour les conduites d’injection et de détente m = metres m = mètres mm = millimetres mm = milli mètres kPa = kilopascals kPa = kilopascals c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 177 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E Page 178 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 179 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E Page 180 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 181 September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E Page 182 YUKON REGULATIONS RÈGLEMENTS DU YUKON c September 30, 2022 Oil and Gas Drilling and Production Regulations Règlement sur les travaux de forage et de production de pétrole et de gaz SCHEDULE E ANNEXE E c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 183 September 30, 2022
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.