Regulation No: 2025/R-55 MCAR-173 Instrument Flight Procedure Design
Air traffic service providers that design instrument flight procedures must keep an operations manual, follow it, train qualified staff, validate procedures, document safety work, and keep records up to date.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Maldives
- Instrument
- Regulation
- Version
- Undated source snapshot
- Language
- dv
- Official source
- View official record ↗
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of Regulation No: 2025/R-55 MCAR-173 Instrument Flight Procedure Design
Showing 1 of 1
- document Verify source ↗
Regulation No: 2025/R-55 MCAR-173 Instrument Flight Procedure Design
AI-assisted research summary: Air traffic service providers that design instrument flight procedures must keep an operations manual, follow it, train qualified staff, validate procedures, document safety work, and keep records up to date.
` Volume: 54 Issue: 92 Date: 9 Zul Qaidaa 1446 – 7 May 2025 Wednesday Regulation No: 2025/R-55 MCAR-173 Instrument Flight Procedure Design • For publication of regulations and The President’s Office guidelines in the Gazette, send to Boduthakurufaanu Magu legalaffairs@po.gov.mv Male, Maldives’ Phone: 3336211 Mobile: 7242885 Website: www.gazette.gov.mv Volume: 54 Issue No: 92 Regulation No: 2025/R-55 Government Gazette Maldives Civil Aviation Authority Republic of Maldives Maldivian Civil Aviation Regulations MCAR-173 INSTRUMENT FLIGHT PROCEDURE DESIGN Issue 2.00, 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Foreword Foreword Maldives Civil Aviation Authority, in exercise of the powers conferred on it under Articles 5 and 6 of the Maldives Civil Aviation Authority Act 2/2012 has adopted this Regulation. This Regulation shall be cited as MCAR-173 Instrument Flight Procedure Design and shall come in to force on – 07 May 2025. Existing requirements for the instrument flight procedure design as listed in MCAR-173 Instrument Flight Procedure Design, Initial Issue, dated 01 June 2012 will be repealed as of 07 May 2025. This Regulation applies to the provider of Air Traffic Services within Maldives Flight Information Region (called in as “Air Navigation Services Provider” or ‘ANSP”) who is engaged in the design, maintenance and promulgation of instrument flight procedures. Compliance with this Regulation is mandatory for organisations providing air traffic services. Definitions of the terms and abbreviations used in this Regulation, unless the context requires otherwise, are in MCAR-1 Definitions and Abbreviations. Issue: 2.00 ii 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority List of Amendments List of Amendments Rev # Date Remarks Issue 1.00 2012-06-01 Initial issue Issue 2.00 2025-05-07 Amendments Issue: 2.00 iii 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority List of effective Pages List of Effective Pages Chapter Part Page Amendment Date Foreword ii Issue: 2.00 07 May 2025 List of Amendments iii Issue: 2.00 07 May 2025 List of Effective Pages iv Issue: 2.00 07 May 2025 Table of Contents v Issue: 2.00 07 May 2025 1 Definitions And Abbreviations 1 - 2 Issue: 2.00 07 May 2025 2 General 3 Issue: 2.00 07 May 2025 Development and Management 3 of Instrument Flight Procedure 4 – 8 Issue: 2.00 07 May 2025 Design. 4 Resource Requirements 9 Issue: 2.00 0 7 May 2025 Documents and Records 5 10 Issue: 2.00 07 May 2025 Control Instrument Flight Procedure Appendix 1 11 Issue: 2.00 07 May 2025 Design Process Issue: 2.00 iv 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Table of Contents Table of Contents Foreword ------------------------------------------------------------------------------------------------------------------ ii List of Amendments ----------------------------------------------------------------------------------------------------------------- iii List of Effective Pages ----------------------------------------------------------------------------------------------------------------- iv Table of Contents ------------------------------------------------------------------------------------------------------------------ v CHAPTER 1 - DEFINITIONS AND ABBREVIATIONS -------------------------------------------------- 1 1.1 DEFINITIONS ----------------------------------------------------------------------------------------------- 1 1.2 ABBREVIATIONS ------------------------------------------------------------------------------------------- 2 CHAPTER 2 - GENERAL ---------------------------------------------------------------------------------------- 3 2.1 Instrument Flight Procedure Operations Manual --------------------------------------------- 3 2.2 Use of the Instrument Flight Procedure Operations Manual ----------------------------- 3 CHAPTER 3 - Development and Management of Instrument Flight Procedure Design -------------------------------------------------------------------------------------------- 4 3.1 Management of Instrument Flight Procedure Life Cycle ----------------------------------- 4 3.2 Design Process -------------------------------------------------------------------------------------------- 4 3.3 Information Acquisition -------------------------------------------------------------------------------- 4 3.4 Design Criteria --------------------------------------------------------------------------------------------- 5 3.5 Ground and Flight Validation ------------------------------------------------------------------------- 6 3.6 Safety Risk Assessment -------------------------------------------------------------------------------- 6 3.7 Instrument Flight Procedure Design Documentation ---------------------------------------- 7 3.8 Automating the Application of PANS-OPS Criteria in Instrument Flight Procedure Design -------------------------------------------------------------------------------------------------------- 7 3.9 Publication of Instrument Flight Procedure ----------------------------------------------------- 8 CHAPTER 4 - Resource Requirements ------------------------------------------------------------------ 9 4.1 Resources --------------------------------------------------------------------------------------------------- 9 4.2 Personnel qualifications and training ------------------------------------------------------------- 9 CHAPTER 5 - Documents and Records Control ----------------------------------------------------10 5.1 Control of data and documentation ------------------------------------------------------------- 10 5.2 Control of personnel records ---------------------------------------------------------------------- 10 APPENDIX 1 - Instrument Flight Procedure Design Process ----------------------------------11 Issue: 2.00 v 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 1 CHAPTER 1 - DEFINITIONS AND ABBREVIATIONS 1.1 DEFINITIONS Chicago Convention The Convention on International Civil Aviation concluded at Chicago on 7 December 1944 (as in force and amended from time to time). ICAO Doc 9905 The Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual (Doc 9905), approved and published under the authority of the Secretary General of the International Civil Aviation Organization. ICAO Doc 9906 The Quality Assurance Manual for Flight Procedure Design (Doc 9906), approved and published under the authority of the Secretary General of the International Civil Aviation Organisation. Instrument flight procedure A published procedure used by aircraft flying in accordance with the instrument flight rules which is designed to achieve and maintain an acceptable level of safety in operations and includes an instrument approach procedure, a standard instrument departure, a planned departure route and a standard instrument arrival. Instrument flight procedure designer A person who has acquired and maintained the required competency level to design instrument flight procedures in accordance with the applicable criteria. Instrument approach procedure A series of pre-determined manoeuvres by reference to flight instruments with specific protection from obstacles from the initial approach fix, or where applicable, from the beginning of a defined arrival route to a point from which a landing can be completed and thereafter, if a landing is not completed, to a position at which holding, or en-route obstacle clearance criteria apply. PANS-OPS (Doc 8168) The Procedures for Air Navigation Services – Aircraft Operations (Doc 8168), approved and published in accordance with the procedure established by the Council of the International Civil Aviation Organization. Planned departure route A notified instrument flight rule departure (IFR) route linking the aerodrome or a specific runway of the aerodrome with a specified significant point, normally on the boundary of controlled airspace associated with the aerodrome. Issue: 2.00 1 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 1 Standard instrument departure A designated instrument flight rule (IFR) departure route linking the aerodrome or a specific runway of the aerodrome with a specified significant point, normally on a designated ATS route, at which the enroute phase of a flight commences. Standard instrument arrival A designated instrument flight rule arrival (IFR) route linking a significant point, normally on an ATS route, with a point from which a published instrument approach procedure can be commenced. Survey data Vertical and horizontal data obtained from an obstacle and terrain survey and other sources or originators, including terrain data, obstacle data and aerodrome data. 1.2 ABBREVIATIONS MCAA Maldives Civil Aviation Authority AIP Aeronautical Information Publication AIS Aeronautical Information Services ATC Air Traffic Control ATS Air Traffic Services CRM Collision Risk Model FIR Flight Information Region ICAO International Civil Aviation Organisation IFP Instrument Flight Procedure IFR Instrument Flight Rules MCAR Manual of Standards OJT On-the-Job Training PANS-OPS Procedure for Air Navigation Services – Aircraft Operations MCAR Maldives Civil Aviation Regulation Issue: 2.00 2 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 2 CHAPTER 2 - GENERAL 2.1 Instrument Flight Procedure Operations Manual 2.1.1 The ANS provider must establish and maintain an instrument flight procedure operations manual which must include the following: (a) the organisational structure of the instrument flight procedure design office; (b) a job description of each of the personnel involved with the instrument flight procedure design process which must contain the job function and responsibilities; (c) the qualifications and training requirements of personnel responsible for instrument flight procedure designs; (d) the criteria used for the design of instrument flight procedure; (e) the documentation required for the design of the instrument flight procedure; (f) the instrument flight procedure design process; (g) a system maintained by the ANSP’s instrument flight procedure design office for keeping documents and records relating to the instrument flight procedure design process; (h) the quality assurance programme established under paragraph 3.1.2; (i) the details of the procedures necessary to ensure compliance with this Manual; and (j) the procedures to control, amend and distribute the operations manual, including the distribution of the initial copy and all subsequent amendments made to the operations manual. 2.1.2 The ANS Provider must notify the ANS Regulator of any changes to the instrument flight procedure operations manual in a timely manner. 2.1.3 The ANS Provider must take all reasonably practicable measures and develop and apply appropriate procedures to ensure that the instrument flight procedure operations manual being used by all its personnel contains current information. 2.1.4 The ANS Provider must update, amend or add to the instrument flight procedure operations manual as the ANS Regulator may require for ensuring: (a) the accuracy of the instrument flight procedure operations manual; and (b) the safety, efficiency or regularity of air navigation. 2.2 Use of the Instrument Flight Procedure Operations Manual 2.2.1 The ANS provider must design every instrument flight procedure in accordance with the instrument flight procedure operations manual established under paragraph 2.1.4. 2.2.2 The ANS provider must ensure that the instrument flight procedure operations manual is readily available to all personnel concerned with the instrument flight procedure design process. Issue: 2.00 3 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 3 CHAPTER 3 - Development and Management of Instrument Flight Procedure Design 3.1 Management of Instrument Flight Procedure Life Cycle 3.1.1 The ANS Provider must establish, implement and maintain a process for the management of the life cycle of an instrument flight procedure, including: (a) the design stage; (b) the updating of and maintaining the instrument flight procedure; and (c) the withdrawal of an instrument flight procedure when that procedure has become irrelevant or obsolete. 3.1.2 The ANS provider must establish and maintain a quality assurance programme for the management of the life cycle of an instrument flight procedure mentioned in paragraph 3.1.1, which consists of all the components and elements stipulated in Chapter 6 of Volume 1 of ICAO Doc 9906. 3.2 Design Process 3.2.1 Every instrument flight procedure must be designed in accordance with a process established by the ANS Provider. 3.2.2 The process of designing an instrument flight procedure must: (a) meet the applicable requirements in this Manual; and (b) specify the means or methods for the following: i. the acquisition, compilation and verification of data and any other information that is relevant to the design of the instrument flight procedure; ii. the design of the instrument flight procedure; iii. the validation of the instrument flight procedure; iv. the conduct of a safety risk assessment of the instrument flight procedure; and v. the publication and promulgation of the instrument flight procedure. 3.2.3 Each instrument flight procedure design must be accompanied by an explanatory statement, in such form (for example, text, grant or chart) as would sufficiently describe the content and purpose of that instrument flight procedure. 3.2.4 The ANSP must ensure that instrument flight procedure design activities are carried out by a person who is qualified in instrument flight procedure design in accordance with Section 4.2. 3.3 Information Acquisition 3.3.1 The ANS provider must establish, implement and maintain a process for the acquisition of relevant survey data and information for the purpose of designing each instrument flight procedure. Issue: 2.00 4 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 3 3.3.2 The process mentioned in paragraph 3.3.1 must ensure that the survey data and information used in the design of every instrument flight procedure are up-to-date and verified by the designer of the instrument flight procedure for accuracy: (a) prior to commencing the design or a review of the instrument flight procedure; or (b) throughout the life cycle of that instrument flight procedure. 3.3.3 The acquisition of survey data and information must: (a) take into consideration all obstacles (for example, buildings, terrain and trees) that define the airspace around the aerodrome; (b) take into consideration the requirements in relation to charting accuracy stipulated in Chapter 1 of Volume II of PANS-OPS (Doc 8168); and (c) in relation to aeronautical data in such survey data and information, satisfy the aeronautical data quality requirements specified in 2.2.2 of MCAR AIS & Charts. 3.3.4 The ANSP must ensure that the following information acquired through the process established under sub-paragraph (3.3.1) is assessed for its relevance to the design of an instrument flight procedure by the person who is responsible for the design of that instrument flight procedure: (a) airport, navigation aid, obstacle, terrain coordinates and elevation data, based on verified surveys and in accordance with Annex 11, Annex 14 and Annex 15 to the Chicago Convention; (b) airspace requirements; (c) user requirements; (d) airport infrastructure such as runway classification, lighting, communications, runway markings, and availability of local altimeter setting; (e) environmental considerations; and (f) any other information that endanger or may endanger the safety of air navigation. 3.4 Design Criteria 3.4.1 The ANS provider must ensure that every instrument flight procedure is designed in accordance with the appropriate design criteria specified in: (a) Volume I and II of PANS-OPS (Doc 8168); (b) such other document that is issued by ICAO as is relevant to flight instrument procedure design. 3.4.2 The ANS provider must design every Required Navigation Performance Authorization Required Approach procedure in accordance with the appropriate design criteria specified in ICAO Doc 9905 and the relevant provisions in PANS-OPS (Doc 8168). 3.4.3 The ANSP must ensure that the design of the instrument flight procedure is compatible with any air traffic service and associated procedure that is provided within the area or areas of airspace where the instrument flight procedure is intended to be established. Issue: 2.00 5 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 3 3.4.4 The ANS provider must ensure that every new or revised instrument flight procedure design is verified to meet the design criteria mentioned in paragraph 3.4.1. 3.4.5 The verification conducted under paragraph 3.4.4 must be made by a person who is: (a) qualified in instrument flight procedure design in accordance with paragraph 4.2; and (b) independent from the person directly responsible for the design of the new or revised instrument flight procedure that is being verified. 3.4.6 The ANS provider must ensure that every instrument flight procedure that is published is reviewed within a period of not more than 5 years from the date of its publication to ensure that the instrument flight procedure continues to meet user requirements and updates to the design criteria specified in Chapter 7 of Volume 1 of ICAO Doc 9906 3.5 Ground and Flight Validation 3.5.1 The ANS provider must conduct a ground validation in accordance with Volume 5 of ICAO Doc 9906 to verify the accuracy and completeness of all obstacle and navigation data considered in the instrument flight procedure design and any other factors normally considered in the flight, prior to promulgating an instrument flight procedure. 3.5.2 If the ANS provider is not able to verify the accuracy and completeness of the data mentioned in paragraph 3.5.1 by a ground validation, the ANS provider must conduct a flight validation in accordance with Volume 5 of ICAO Doc 9906 to validate the relevant data and assess if the instrument flight procedure is safe for flight. 3.5.3 A ground or flight validation must be conducted by a person who has received the requisite training and knowledge in instrument flight procedure design and ground or flight validation, as the case may be. 3.6 Safety Risk Assessment 3.6.1 The ANS provider must conduct a safety risk assessment in respect of every proposal for a new instrument flight procedure or a significant change to an instrument flight procedure in accordance with its safety management system. 3.6.2 The ANS provider must not promulgate a new instrument flight procedure or make a significant change to an instrument flight procedure unless a safety risk assessment shows that an acceptable level of safety will be met by the aircraft operator when using that instrument flight procedure. 3.6.3 The safety risk assessment must consider as a minimum the following: (a) identification of hazards; (b) ensure the implementation of remedial action to address the safety risks of the consequences of hazards; (c) continuous maintenance and periodic review of instrument flight procedure implemented; and Issue: 2.00 6 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 3 (d) continuous improvement of the overall performance of the safety management system. 3.6.4 The ANS provider must ensure that all safety management activities of a new or changed instrument flight procedure are documented. 3.7 Instrument Flight Procedure Design Documentation 3.7.1 The ANS provider must provide the following documents at the request of the ANS Regulator: (a) documentation that is required to be published in the Aeronautical Information Publication in accordance with Annex 4 and Annex 15 to the Chicago Convention; (b) documentation required to maintain transparency concerning the details and assumptions used by the person responsible for the design of the instrument flight procedure, which should include supporting information or data used in the design, such as: i. controlling obstacle for each segment of the instrument flight procedure, where applicable; ii. effect of environmental considerations on the design of the instrument flight procedure; iii. infrastructure assessment; iv. airspace constraints; v. modifications or amendments to the existing instrument flight procedure, including the reasons therefor; and vi. the reasons for any deviation from the existing design criteria specified in paragraph 9 and details of the mitigation measures applied to ensure continued safe operations; (c) any other documentation as may be required to facilitate validation of the instrument flight procedure. 3.7.2 The ANS provider must present all calculations and results of calculations of the instrument flight procedure design in a form and manner that clearly sets out the logic and resultant design. 3.7.3 The ANS provider must take all reasonably practicable measures and develop and apply appropriate procedures to ensure that every instrument flight procedure design documentation is verified by another qualified person for accuracy and completeness prior to validation and publication of that instrument flight procedure. 3.8 Automating the Application of PANS-OPS Criteria in Instrument Flight Procedure Design 3.8.1 The ANS provider must ensure that all automation tools or software used in the design of an instrument flight procedure are in accordance with Volume 3 of ICAO Doc 9906. Issue: 2.00 7 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 3 3.8.2 The ANS provider must take all reasonably practicable measures and develop and apply appropriate procedures to ensure that all equipment, including software, used in the design of every instrument flight procedure, are operated in accordance with the manufacturer’s operating instructions and manuals. 3.9 Publication of Instrument Flight Procedure 3.9.1 The ANS provider must take all reasonably practicable measures and develop and apply appropriate procedures for the timely provision to the Aeronautical Information Services provider of a new instrument flight procedure or a change to an existing instrument flight procedure including the design, charts and accompanying narratives for publication in the Aeronautical Information Publication. 3.9.2 The ANS provider must ensure that the intended effective date for operational use of the instrument flight procedure is included in the document narrative. Issue: 2.00 8 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 4 CHAPTER 4 - Resource Requirements 4.1 Resources 4.1.1 The ANSP must acquire and maintain resources necessary for the instrument flight procedure design process, including: (a) the equipment appropriate for the design, design verification, validation of instrument flight procedure and maintenance of the types of instrument flight procedure; (b) relevant and up-to-date data including aeronautical data, land contour data, and obstacle data for the design, design verification, validation of instrument flight procedure and maintenance of the instrument flight procedure; (c) copies of relevant documentation, including technical standards, practices, and instructions; (d) any other documentation that may be necessary for the design, design verification, validation of instrument flight procedure and maintenance of the types of instrument flight procedure; and (e) persons who are qualified in instrument flight procedure design. 4.2 Personnel qualifications and training 4.2.1 The ANS provider must ensure that every person responsible for its instrument flight procedure design (“IFP designer”) satisfies the minimum standards and possesses the training and qualifications specified in this paragraph. 4.2.2 The ANS provider must ensure that such an IFP designer undergoes initial training that includes at least the following elements: (a) completion of an ICAO PANS-OPS instrument procedures design course as specified by the ANS Regulator, for the design of instrument flight procedure; and (b) an overview of relevant ICAO Standards and Recommended Practices. 4.2.3 The ANSP must ensure that every of its new IFP designers undergoes on-the-job training and is assessed to be competent in instrument flight procedure design in accordance with the instrument flight procedure operations manual and under the supervision of a qualified IFP designer. 4.2.4 The ANSP must ensure that every of its IFP designers maintains the required competency level for instrument flight procedure design through training in accordance with the ANSP’s instrument flight procedure operations manual. 4.2.5 The ANSP must ensure that the interval between the initial training and the first recurrent training, and subsequent recurrent training for each of its IFP designers does not exceed 3 years. Issue: 2.00 9 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Chapter 5 CHAPTER 5 - Documents and Records Control 5.1 Control of data and documentation 5.1.1 The ANS provider must take all reasonably practicable measures to ensure the accuracy of all data and documentation required under this Manual relating to the design of an instrument flight procedure. 5.1.2 The ANS provider must develop and apply appropriate policies and procedures to ensure: (a) that all the data and documentation mentioned in paragraph 3.7 be retained: i. for as long as an instrument flight procedure is in use; and ii. for at least 5 years after the associated instrument flight procedure is permanently withdrawn from use; (b) the timely review and updating of all data and documentation; (c) that amendments to the data and documentation are approved by an appropriate person before issue, and the reasons for the amendment are documented; (d) that up-to-date versions of all relevant data and documents are accessible to the personnel of the ANSP’s instrument flight procedure design office at all locations where the personnel require access to such documentation; (e) that the current version of each data and document is identifiable such that the use of obsolete material is precluded; (f) that documentation of the safety risk assessment is maintained throughout the life cycle of the instrument flight procedure; and (g) that all obsolete data and documentation are clearly marked and promptly removed from circulation. 5.1.3 The ANS provider must, at the ANS Regulator’s request, make the up-to-date versions of its data and documentation available in a timely manner. 5.2 Control of personnel records 5.2.1 The ANS provider must keep and maintain an accurate and up-to-date record of every personnel responsible for instrument flight procedure design in its instrument flight procedure design office. 5.2.2 The record mentioned in sub-paragraph (5.2.1) must contain the following information: (a) the person’s full name; (b) documentation demonstrating the person’s qualifications and training records Issue: 2.00 10 07 May 2025 Maldivian Civil Aviation Regulations MCAR 173 – Instrument Flight Procedure Design Maldives Civil Aviation Authority Appendix 1 APPENDIX 1 - Instrument Flight Procedure Design Process Issue: 2.00 11 07 May 2025
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
Regulation No: 2025/R-55 MCAR-173 Instrument Flight Procedure Design
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in