The Standards (Declatation of Compulsory Standards Notice, 2020
This Notice may be cited as the Standards (Declaration of compulsory Standards) Notice, 2020, and it takes effect 60 days after publication.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Tanzania
- Instrument
- Notice
- Citation
- The Standards (Declatation of Compulsory Standards Notice, 2020
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This Notice may be cited as the Standards (Declaration of compulsory Standards) Notice, 2020, and it takes effect 60 days after publication. The standards listed in the Schedule are compulsory for the listed commodities and related manufacturing, production, processing, or treatment activities.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of The Standards (Declatation of Compulsory Standards Notice, 2020
Showing 2 of 2
- 1 Verify source ↗
This Notice may be cited as
AI-assisted research summary: This Notice may be cited as the Standards (Declaration of compulsory Standards) Notice, 2020, and it takes effect 60 days after publication.
1. This Notice may be cited as the Standards (Declaration of compulsory Standards) Notice, 2020 and shall come into effect sixty days after the date of publication. - 2 Verify source ↗
The Standards specified in the Schedule to this
AI-assisted research summary: The standards listed in the Schedule are compulsory for the listed commodities and related manufacturing, production, processing, or treatment activities.
2. The Standards specified in the Schedule to this Notice are hereby declared to be compulsory standards for each commodity or for the manufacturing, production, processing or treatment of each commodity specified thereunder. _______ SCHEDULE ________ (Made under paragraph 2) ________ COMPULSORY STANDARDS FINALIZED TZS NO. TITLE S/No . 1 TZS 2344-1:2019/(ISO 15874 - 1: 2013) 2 TZS 2344-2:2019/(ISO Plastic piping system for hot and cold water installations – Polypropylene (PP) – Part 1: General. Plastic piping system for hot and cold 1 CATEGORY COMPULSORY COMPULSORY 15874 - 2: 2013) TZS 2344-3:2019/(ISO 15874 - 3: 2013) TZS 2344-5:2019/(ISO 15874 - 5: 2013) TZS 2345:2019/(ISO 21138 - 2: 2013) TZS 2190-10:2019/(ISO 6182 - 10: 2014) TZS 2190-11:2019/(ISO 6182 - 11: 2004) TZS 2190-07:2019/(ISO 6182 - 07: 2004) TZS 2346-08:2019/(ISO 14520 - 08: 2016) TZS 2346-09:2019/(ISO 14520 - 09: 2016) TZS 2346-10:2019/(ISO 14520 - 10: 2016) TZS 2347-:2019/(ISO 16923: 2016) TZS 2372:2019/EAS 902:2018 TZS 2373:2019/EAS 903:2018 TZS 2374-1:2019/EAS 924-1:2018 3 4 5 6 7 8 9 10 11 12 13 14 15 COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY water installations – Polypropylene (PP) – Part 2: Pipes. Plastic piping system for hot and cold water installations – Polypropylene (PP) – Part 3: Fittings. Plastic piping system for hot and cold water installations – Polypropylene (PP) – Part 5: Fitness for purpose of the system Plastics piping systems for non-pressure underground drainage and sewerage - Structured-wall piping systems of un plasticized poly (vinyl chloride) (PVC- U), polypropylene (PP) and polyethylene (PE) - Part 2: Pipes and fittings with smooth external surface, Type A Fire protection -- Automatic sprinkler systems -- Part 10: Requirements and test methods for domestic sprinklers Fire protection -- Automatic sprinkler systems -- Part 11: Requirements and test methods for pipe hangers Fire protection — Automatic sprinkler systems — Part 7: Requirements and test methods for early suppression fast response (ESFR) sprinklers Gaseous fire-extinguishing systems -- Physical properties and system design -- Part 8: HFC 125 extinguishant Gaseous fire-extinguishing systems -- Physical properties and system design -- Part 9: HFC 227ea extinguishant Gaseous fire-extinguishing systems -- Physical properties and system design -- Part 9: HFC 227ea extinguishant Natural gas fueling station- CNG stations for fuelling vehicles Bulk Liquified Petroleum gas (LPG) road tanker - Assembling – Requirements Road tanker – Welded steel tank for Liquified Petroleum Gas (LPG) – Design and Manufacture. - Inspection and testing of LPG road tankers, Bulk LPG road tankers Vehicle, equipment and accessories – Assembly, The handling, storage and distribution of liquefied petroleum gas in domestic, commercial and industrial installation – Code of practice Part 1: Storage and filling sites for refillable liquefied petroleum gas ( LPG ) containers of capacity not exceeding 150 liters 2 16 TZS 2374-2:2019/EAS 924-2:2018 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 TZS 2374:2019/EAS 925:2018 TZS 845:2019 TZS 983:2019 TZS 860:2019 TZS 2335:2019 2336:2019 TZS2377:2019/ ISO 11485-1:2011(E) TZS 2378:2019/ ISO 11485-2:2011(E) TZS 2379:2019/ ISO 11485-3:2014(E) TZS 2381:2019/ ISO 12540:2017(E) TZS 2382:2019/ ISO 12543-1:2011(E) TZS 2383:2019/ ISO 12543-2:2011(E) TZS 2384:2019/ ISO 12543-3:2011(E) TZS 2386:2019/ ISO 12543-5:2011(E) TZS 2387:2019/ ISO 12543-6:2011(E) TZS 2389:2019/ ISO 16293-1:2008(E) TZS 2390:2019/ ISO 16293-2:2017(E) The handling, storage and distribution of liquefied petroleum gas in domestic, commercial and industrial installation – Code of practice Part 6:Liquefied petroleum gas installations involving gas storage vessels of individual water capacity exceeding 150 L and combined water capacity not exceeding 9000 L per installation. Inspection and testing of Liquified Petroleum Gas (LPG) road tanker Air quality –specifications. Air quality - Vehicular exhaust emission limits. Municipal and industrial waste water- general tolerance limits. Tolerance limits for industrial effluents discharged into inland and receive water bodies: oil and gas. Acoustics- general tolerance limits for underwater noise Glass in building - Curved glass - Part 1: Terminology and definitions. Glass in building - Curved glass - Part 2: Quality requirements. Glass in building - Curved glass - Part 3: Requirements for curved tempered and curved laminated safety glass. Glass in building - Tempered soda lime silicate safety glass. Glass in building - Laminated glass and laminated safety glass - Part 1: Definitions and description of component parts. Glass in building - Laminated glass and laminated safety glass - Part 2: Laminated safety glass. Glass in building - Laminated glass and laminated safety glass - Part 3: Laminated glass. Glass in building - Laminated glass and laminated safety glass - Part 5: Dimensions and edge finishing. Glass in building - Laminated glass and laminated safety glass - Part 6: Appearance. Glass in building - Basic soda lime silicate glass products - Part 1: Definitions and general physical and mechanical properties. Glass in building - Basic soda lime silicate glass products - Part 2: Float glass. 3 COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 TZS 1512:2019/ EAS 179:2012 TZS 892-1:2019 TZS 2314: 2018/ARS 825:2016 TZS 2315:2018/ARS 836:2016 TZS 2316:2018/ARS 837:2016 TZS 2321:2018/ARS 854:2016 TZS 2322:2018/ARS 855:2017 FTZS 2323;2018/ARS 856:2017 FTZS 2313:2018/ARS 467:2016 TZS 48:2019/EAS 14:2018 TZS 1654:2019 TZS 665:2019 TZS 1256:2019 TZS 2331:2019 TZS 390:2019 TZS 2330:2019 TZS 1082:2018/ARS 834:2017 TZS 2332:2019 TZS 2351:2019 TZS 2352:2019 TZS 2353:2019 TZS 2354-17:2019/ISO 10993-17:2002 TZS 2355-18:2019/ISO 10993-18:2005 TZS 2356:2019/ISO 10282:2014 TZS 2357-1:2019/ISO 11193-1:2008 TZS 2358:2019 TZS 2359:2019 TZS 2365:2019 Precast concrete paving blocks- Specification. Polyethylene tanks for storage of potable water –Part 1:speciication Yams – Specification. COMPULSORY COMPULSORY COMPULSORY Fresh Bitter Cassava - Specification COMPULSORY Fresh Cassava leaves – Specification COMPULSORY Gari- Specification COMPULSORY Fresh Tannia – Specification COMPULSORY Fresh dasheen/Taro – Specification COMPULSORY Degermed maize meal and maize grits – Specification COMPULSORY Fat spreads and blended spreads specification Liqueur Specification Fruit flavored alcoholic Beverage Specification Non-cereal based alcoholic beverage specification Pumpkin flour –specification Carbonated soft drinks-specification Sugar free carbonated soft drinks specification Dried banana Specification Black current specification Water based undercoat - Specification Aluminum finishing paint - Specification Adhesive – Ethyl and methyl cyanoacrylate - Specification Biological evaluation of medical devices-Part 17: Establishment of allowable limits for leachable systems. Biological evaluation of medical devices-Part 18: Chemical characterization of materials Single use sterile surgical rubber gloves- Specification Single use medical examination gloves- Part 1: Specification for gloves made from rubber latex or rubber solution. Coal briquettes for domestic use – Specifications. Coal for cement manufacture - specifications. Guidelines for establishment, use, and 4 COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY 62 63 64 65 66 67 TZS 2366:2019/ISO 19434:2017 TZS 2367: 2019/ISO 19426-1:2018 TZS 2368:2019 / ISO 19426- 2 : 2018 TZS 2369:2019 / ISO 19426- 3 : 2018 TZS 2370:2019 / ISO 19426- 4 : 2018 TZS 2371:2019 / ISO 19426- 5 : 2018 management of refuge chamber in underground mines. Mining – Classification of mine accidents Structures for mine shafts – parts 1: Vocabulary. Structures for mine shafts – parts 2: Headframe structures. Structures for mine shafts – parts 3: Sinking stages. Structures for mine shafts – parts 4: Conveyances. Structures for mine shafts – parts 5: shaft system structures. COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY COMPULSORY Dodoma, 31st March, 2020 INNOCENT L. BASHUNGWA Minister for Industry and Trade 5
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
The Standards (Declatation of Compulsory Standards Notice, 2020
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in